HomeMy WebLinkAboutAgenda Item - 2011-08-01 (02) STAFF REPORT CITY oF LA E iS E PLANNING DIVISION APPLICANT/OWNER: FILE NO: Marylhurst University LU 11-0010 TAX LOT REFERENCE: STAFF: Tax Lot 400 of 21E 14 Leslie Hamilton, AICP LOCATION: DATE OF REPORT: 17600 Pacific Highway July 22, 2011 COMP. PLAN DESCRIPTION: 120-DAY DECISION DATE: CI (Campus Institutional) October 27, 2011 ZONING DESIGNATION: NEIGHBORHOOD ASSOCIATION: CI (Campus Institutional) None I. APPLICANT'S REQUEST The applicant is requesting approval of a modification of a Development Review Permit [LU 00-0088] to add a structure (i.e., to reconstruct the Griffith House, to be known as the Belluschi Pavilion] on the Marylhurst University Campus (campus). II. RECOMMENDATION Approval of LU 11-0010 with conditions. The complete listing of conditions is provided on pages 17 through 19 of this report. III. APPLICABLE REGULATIONS A. City of Lake Oswego Community Development Code [LOC Chapter 501: LOC 50.12.010-50.12.030 CI Zone LOC 50.15.005-50.15.020 Greenway Management Overlay District LOC 50.16.005-50.16.110 Sensitive Lands Overlay District LU 11-0010 Page 1 of 20 LOC 50.21.005 Vision Clearance LOC 50.22.035 Special Street Setback LOC 50.41.005-50.41.030 Drainage Standard for Major Development LOC 50.42.005-50.42.030 Weak Foundation Soils LOC 50.43.005-50.43.035 Hillside Protection LOC 50.44.005-50.44.035 Flood Plain LOC 50.45.005-50.45.030 Building Design LOC 50.46.005-50.46.030 Park and Open Space LOC 50.47.005-50.47.030 Landscaping, Screening and Buffering LOC 50.55.005-50.55.025 Off-Street Parking, Loading, and Bicycle Access LOC 50.56.005-50.56.025 Transit LOC 50.57.005-50.57.035 Access LOC 50.58.005-50.58.035 On-Site Circulation — Driveways and Access Roads LOC 50.59.005-50.59.030 On-Site Circulation — Bikeways, Walkways and Accessways LOC 50.64.005-50.64.030 Utilities LOC 50.77.007 Burden of Proof LOC 50,79.025 Review Criteria for Minor Developments LOC 50.79.040 Conditions of Approval LOC 50.81.005-50.81.020 Review of Minor Development Applications LOC 50.84.005-50,84.030 Filing of Appeals LOC 50.86.025 Modification of Approved Permit LOC 50.87.005-50.87.025 Compliance with Approved Permit, Modifications B. City of Lake Oswego Sign Code'LOC Chapter 471: LOC 47.06.205 Permanent Signs Exempt from Permit and Fee C. City of Lake Oswego Tree Code (LOC Chapter 551: LOC 55.08.010-55.08.040 Tree Protection D. City of Lake Oswego Fence Code (LOC Chapter 571: LOC 45.15.035-45.15.035 Fences E. City of Lake Oswego Historic Code (LOC Chapter 581: LOC 58.02.005-58.02.165 Historic Preservation F. Prior Approvals CU 12-81, DR 13-81, LU 99-0045, LU 00-0026, LU 00-0088, LU 06-0004 LU 11-0010 Page 2 of 20 IV. FINDINGS A. Background/Existing Conditions: 1. The campus is 52.83 acres in size, with a primary access point on Highway 43 (Exhibit El). 2. The campus consists of three sub-areas, as follows: Subarea I: Campus Institutional (CI) Subarea I-A: Campus Institutional (CI) A portion of Subarea II: Campus Institutional/Office Commercial (Cl/OC) The Belluschi Pavilion will be located in the CI zone (Exhibit E2). 3. The campus is located immediately south of Mary's Woods, north of the City of West Linn, and east of Highway 43. It is bounded on the east by the Willamette River. To the west of the site across Highway 43 is located the 105-lot Marylhurst planned development. 4. There are sensitive lands located on the north, south and east portions of the site which were delineated under LU 00-0088 (Exhibit E3). 5. The site contains several historic landmarks, including the following: • Marylhurst (BP John) Administration Building ® St. Catherine's Dormitory ■ Flavia Hall ® Acquinas Hall • Education Hall ® Marylhurst Cemetery/Altar 6. The Belluschi Pavilion was constructed in 1951 in the City in the Mid-Century Modern style. It was designed by Pietro Belluschi, a Portland-based architect known for his innovative design. The building was saved from demolition and disassembled from its original site in the City and stored in a freight container. V. PUBLIC NOTICE OF APPLICATION AND APPLICANT'S BURDEN OF PROOF A. Neighborhood Meeting: No neighborhood meeting is required for the modification of a Development Review permit. LU 11-0010 Page 3 of 20 B. Public Notice to Surrounding Area: The City has provided adequate public notice and opportunity to comment on this application, as required by LOC 50.82.020. No comments were received during the preparation of this report. C. Burden of Proof: Per LOC 50.77.007, the applicant for a development permit shall bear the burden of proof that the application complies with all applicable review criteria or can be made to comply with applicable criteria by imposition of conditions of approval. The applicant has provided sufficient evidence to enable staff to evaluate the proposal. These documents are listed as exhibits at the end of this report. VI. LOC 50.79.020— MINOR DEVELOPMENT A. Classification of Application: LOC 50.86.025 Modification of Approved Permit This proposal seeks to modify a Development Permit approved in 2002 (LU 00- 0088). Minor changes to an approved permit may be approved if they meet certain criteria, and would then be processed as a Minor Development. If any of those criteria are not met, the modification is subject to review as a "new application." The City Manger may approve minor changes in any development permit provided that such change: 1. Does not increase the intensity of any use or the density of any residential use. The reconstruction of the Griffith House on the campus increases the intensity of the institutional use by adding 918 square feet to the development on the site. This development will increase both the vehicle and parking requirements on the campus. This criterion is not met. 2. Meets all requirements of the development standards and other legal requirements. As analyzed in this report, the project meets all applicable development standards. This criterion is met. 3. Does not significantly affect other property or uses; will not cause any deterioration or loss of any natural feature, process or open space; nor significantly affect any public facility. A significant effect on other property or uses is measured by whether the modification results in an exception to Code requirements. As described in the LU 11-0010 Page 4 of 20 body of this report, no exceptions to Code requirements are necessary to reconstruct the Griffith House on the campus. While there are several delineated natural resources on the site, the proposed location of the Belluschi Pavilion is more than 90 feet away from the nearest delineated resource; furthermore, its construction will not require any tree removal. The modification will not affect any public facility, which is defined as those improvements that are owned, maintained or operated by the City, (e.g., utilities and streets). This criterion is met. 4. Does not affect any condition specifically placed on the development by action of a hearing body or City Council. The request does not affect any condition imposed by the Development Review Commission in their approval of the original approval under LU 00-0088. This standard is met. Because the request increases the intensity of the institutional use on the campus, the request is considered a non-minor change. Although this modification is to be processed as a new application, that does not result in all aspects of the original application being reopened for review. The scope of the review is limited to the modifications requested, and to those aspects of the prior approval that would be affected by the proposed modification, but does not extend to unrelated aspects of the original approval. This conclusion is based on the following: ■ Any change not meeting the criteria [for a minor modification of an approved permit] shall be processed as a new application [LOC 50.86.025]; and ■ The legal doctrine of"law of the case" is applicable to land use cases: Sperber v. Coos County, 60 Or LUBA 44 (2009); Beck v. Tillamook, 313 Ore.148, 153 (1992) B. Criteria for Review of Application: Per LOC 50.79.025, for any minor development application to be approved, it shall first be established that the proposal complies with: 1. The requirements of the zone in which it is located; Campus Institutional Zone FLOC 50.12.010-50.12.0301 The site development requirements of the CI zone include a maximum building height of 45 feet, while the required yards are those needed to maintain the appearance and character of the campus. The Griffith House is one story (10 feet at peak). The proposed location on the campus will be in an open area near buildings and parking and consistent with the campus massing and layout (Exhibit E8). LU 11-0010 Page 5 of 20 In addition, Appendix LOC 50.12-A, the approved plan for the Marylhurst Institutional Area, includes conditions and limitations on the uses in Sub-Area 1, as follows: 1. Allowed uses will include educational, religious, social service, governmental, institutional housing and their supporting services. The Belluschi Pavilion will serve the campus as a meeting area for students and functions. This standard is met. 2. The appearance and character of the present Marylhurst Education Center campus, especially the scale of buildings, parking areas, building locations, materials, open areas and landscaping, will be continued in new development. The Belluschi Pavilion will maintain the campus character. The building was designed in 1951 and has similar architectural style to neighboring buildings of the same era: Clark Commons (1961), Mayer (1954) and Villa Maria (1966). The low roofline and large window glazing is a common architectural design of that time period and is found in the three mid-century buildings near the Belluschi Pavilion (see photos below). This standard is met. LU 11-0010 Page 6 of 20 The following general standards apply to development throughout the campus: 2. Ensure that the natural drainage courses are designated as opens space. No development will be permitted, except for utilities, drainage management improvements or low-intensity recreational improvements, such as trails. The natural drainage courses are contained within the Resource Protection (RP) overlays, as shown in Exhibit E3. No development is proposed within these areas. This standard is met. 3. Ensure maintenance of a setback along Pacific Highway, which will include a minimum of 50 feet from the right-of-way line, to provide for the planting of trees. The Belluschi Pavilion will be located more than 50 feet from the Pacific Highway right-of-way, (Exhibit E14). This standard is met. 4. Buffers are required between non-residential campus uses and adjacent residential neighborhoods, including protection of views. The Belluschi Pavilion will be erected along the southern edge of the campus (Exhibit E8) near the RP corridor that separates the campus from the residential development to the south. At 10 feet in height, the pavilion will not impact views. This standard is met. 5. Minimum changes in topography will be allowed. Grading will be limited to that required for foundations, drainage management, parking areas and berms. As shown in the site plan and contour map (Exhibits E8 and E5, respectively), the Belluschi Pavilion will be located in an area that is relatively flat and already developed with some parking. Grading will be limited to what is necessary to reconstruct the structure and patio and complete the adjoining landscaping. This standard is met. 6. Parking areas must be scaled proportionately to the campus buildings and landscaped to avoid the appearance of large, unbroken paved areas. As shown in the parking plan and discussed under LOC 50.55, the construction of the Belluschi Pavilion requires 14 additional parking spaces. Parking is not concentrated on campus but can be found in at least eight distinct areas (Exhibit E4), which are surrounded by landscaping. The proposed spaces are located in three different locations around campus, with some spaces provided in areas that are already used for parking (Exhibit 12). This standard is met. LU 11-0010 Page 7 of 20 8. Residential site design which is clustered and preserves open areas is strongly encouraged. The Belluschi Pavilion will be located between the Mayer Art Building and Villa Maria (E15), which clusters development on the campus and leaves large areas of open space intact. This standard is met. Greenway Management Overlay District (LOC 50.15.005-50.15.0201 The site contains a portion of the Willamette River Greenway along the east property line, as shown in Exhibit E4. The greenway boundary extends 150 feet shoreward from the ordinary low waterline of the Willamette River. The greenway was protected as open space under the original site plan. As shown in Exhibits E8 and E13, the proposed Belluschi Pavilion and additional parking will be located at least 350 feet from the Willamette River Greenway. This standard is met. Sensitive Lands Overlay District FLOC 50.16.005-50.16.1101 The purpose of this standard is to protect the functions and values of wetlands, stream corridors and tree groves on lands with environmental or natural significance. The City's Sensitive Lands Atlas illustrates Resource Conservation (RC) and RP Districts on the site, which have been delineated in 2002. The limits of the site work for the Belluschi Pavilion will occur within an area designated as surface parking on the approved site plan, and located 90 feet from the 10-foot construction setback along the nearest RP district. This standard is met. Vision Clearance FLOC 50.21.0051 This standard prescribes "vision clearance triangles" at street intersections and prohibits the installation of any object, including landscaping, taller than 30 inches above the level of the centerline of the adjacent streets. The vision clearance triangles at the intersection of Furman Drive and Highway 43 were analyzed under the original approval, and the proposed Belluschi Pavilion does not affect the intersection. This standard is met. 2. The Development Standards applicable to major developments; Note: Although this application is considered a minor development, for the purposes of the applicable Development Standards, LOC 50.79.025(2) requires that the Development Standards applicable to major development be used when the development is for the construction if an institutional building. LU 11-0010 Page 8 of 20 Drainage Standard for Major Development [LOC 50.41.005 - 50.41.0401 This standard requires that drainage alterations, including new development, not adversely affect neighboring properties. As described in the applicant's narrative (Exhibit F1), the runoff from the proposed Belluschi Pavilion will connect directly to the existing piped system and will be directed to a treatment area before being conveyed to the Willamette River. The impervious area of the pavilion was already accounted for since the location was identified as a surface parking lot under the original site plan. This standard is met. Weak Foundation Soils [LOC 50.42.005-50.42.0301 The entire site has been identified as having weak foundation soils and slide areas, especially along the RP districts due to steep topography. Prior to approval of any building permits, the applicant may be required to submit a geotechnical report for review and approval by the Building Official. Compliance with this standard will be assured at the building permit review phase. Hillside ProtectionJLOC 50.43.005-50.43.0351 The campus contains areas of steep slope with potential landslide hazards (Exhibit E5). The area where the Belluschi Pavilion will be located is relatively flat (5% slope). Development in this area will not impact the steep slopes, which are generally found within the sensitive lands districts. This standard is met. Flood Plain FLOC 50.44.005-50.44.0351 The Federal Emergency Management Agency (FEMA) Flood Insurance Rate Maps show a 100-year flood elevation on this site at an elevation between 43 and 44 feet. The proposed Belluschi Pavilion will be located at an elevation of 140 feet, well above flood level. This standard is met. Building Design [LOC 50.45.005—50.45.0301 This standard is applicable to development involving a structure for institutional use. As prescribed by this standard, buildings are to be designed and located to complement and preserve existing buildings, streets and paths and other elements of the built environment, and to assure accessibility for bicyclists, pedestrians, and other users of transportation modes. Buildings are to be designed to be complementary in appearance to adjacent structures of good design with regard to materials, roof lines, height and overall proportions. Buildings are to be designed and located to complement and preserve natural land forms, trees, shrubs and other natural vegetation. The design of the building should be complementary to adjacent buildings of good design, which includes the existing building(s) on the site as well as adjacent structures. Where existing buildings are to remain on site, new development shall be LU 11-0010 Page 9 of 20 designed to either integrate the remaining buildings into an overall design, or provide separate landscaping, remodeling or other treatment which establishes a distinct character and function for the remaining buildings. The specific location of the Belluschi Pavilion was selected due to its relationship with other contemporary mid-20th Century structures on the campus. The original campus buildings were constructed in the 1930s and included the BP John Administration Building, St. Catherine Hall, and Aquinas Hall, all built in the Mediterranean Revival Style and designed by noted local architect Josef Jacobberger. These structures form the historic central core of the campus. In the 1950s and 1960s, new buildings were added to the campus, including Mayer Art Building (1954), Clark Commons (1961) and Villa Maria (1966). These buildings followed the contemporary style of the mid 20th century construction with simple lines, brick and wood siding, low pitched roofs, low profiles and large amounts of glazing. The Belluschi Pavilion (1951) follows this same architectural design with large windows, large eaves, a low-pitched roof line, vertical siding and ventral brick chimney and fireplace. LU 11-0010 Page 10 of 20 The patio area proposed around the perimeter of the building creates an outdoor meeting area. It will have a seating wall, which will provide straight lines that will match with the simple contemporary shape of the structure. The patio and landscaping will create a setting and feel of the original design as a single-family house with outdoor space. This standard is met. Buildings shall be designed and located to complement and preserve existing natural land forms, trees, shrubs and other natural vegetation. Trees and other natural elements shall help define building proportion relationships and to provide scale to the structure as a whole. As shown in Exhibit E5 and the picture below, the site is relatively flat. There are five mature trees in the immediate vicinity that will remain and will provide scale to the Belluschi Pavilion. In addition, the backdrop of the pavilion (to the south) is a protected RP district. This backdrop is in keeping with the principles of organic architecture used extensively at the time of the design of the Belluschi Pavilion, where buildings provided large windows to allow expansive views of the natural landscape. This standard is met. LU 11-0010 Page 11 of 20 Buildings shall be designed to minimize personal security risks of users and to minimize the opportunities for vandalism and theft. Building hardware that discourages forced entry and provides approved egress capability shall be used. The Belluschi Pavilion will be surrounded by a concrete terrace that will provide open views of the structure from other areas of the campus. The doors of the house will be provided with locking hardware that discourages forced entry. This standard is met. Buildings shall be designed and constructed to reduce noise impacts on interior occupied spaces and adjacent property. The Belluschi Pavilion will be located at least 180 feet from the nearest residentially- zoned property, and the densely vegetated RP district along the southern property line will provide buffering from noise emanating from the use. Additionally, the Belluschi Pavilion will not have any exterior mechanical equipment -the structure will be heated with radiant floor heating which was original to the house and is internal. This standard is met. Buildings shall be designed with roof angles, overhangs,flashings and gutters to direct water away from the structure. The shed roof of the Belluschi Pavilion will drain to down spouts and connect to the existing private stormwater system that is treated and piped before discharging to the Willamette River. This standard is met. Buildings shall incorporate features such as arcades, roofs, alcoves, porticoes and awnings to protect pedestrians from the elements. These projections shall maintain vertical clearance of 13 ft. 6 inches where over fire lanes. As shown in the elevations (Exhibit E11), the Belluschi Pavilion has large eaves that extend out from the building on all sides for rain protection. There are no fire lanes or vehicular driveways near the structure. This standard is met. Building orientation shall be designed to encourage pedestrian access from public streets and make the street pedestrian friendly. Buildings shall be located within 30 feet of a public street. The building orientation standard that requires new buildings to be located within 30 feet of a public street is superseded by the CI zone setback standard, which requires a minimum setback of 50 feet along Highway 43. This standard is not applicable Park and Open Space FLOC 50.46.005—50.46.0301 This standard requires that development involving institutional uses provide 15% of the gross land area in open space. The park and open space requirement can be LU 11-0010 Page 12 of 20 met by providing landscaping that meets the requirements of the Landscaping Standard. As analyzed under LU 00-0088, approximately 34 acres, or 64% of the campus, is preserved as open space. The footprint of the Belluschi Pavilion is approximately 3,025 square feet, which will bring the amount of open space down to 63.8%. This standard is met. Landscaping, Screening and Buffering FLOC 50.47.005—50.47.0301 Development involving institutional uses must provide a minimum 15% of the net buildable area in landscaping. As discussed above under the Park and Open Space standard, approximately 63.8% of the site is to remain as open space/landscaping. The applicant has provided a landscaping plan (Exhibit E10) for the area around the Belluschi Pavilion, which is now a lawn area. As shown in the Exhibits E8 and E11, there are five mature trees (cedar and spruce) in the immediate vicinity that will remain and will provide scale to the Belluschi Pavilion, In addition, the backdrop of the pavilion is a protected RP district. This setting is in keeping with the principles of organic architecture used extensively at the time of the design of the Belluschi Pavilion, where large windows allowed expansive views of the natural landscape. The applicant proposes additional landscaping around the pavilion which includes a mix of deciduous trees, shrubs and groundcover (Exhibit E11). Many of the species are native, including madrone, vine maple, evergreen huckleberry, kinnikinnick and sword fern; native plants are concentrated under the spruce trees, which are closest to the RP district. Staff finds that the proposed landscape plan around the Belluschi Pavilion provides a rich texture in terms of variety and plant material. As a condition of approval, the applicant will be required to provide a one-year guarantee (one 12-month growing season from the date of installation) for all landscape materials. As conditioned, this standard is met. Off-Street Parking, Loading and Bicycle Access FLOC 50.55.005 - 5o.55.925j This standard applies to all development which generates a parking need. Based on the analysis of the existing uses and those proposed under the original plan in LU 00-0088, a total of 1,167 parking spaces are needed on the site, and there were 639 parking spaces provided in 2000. This parking deficiency was considered non- conforming, and the approved site plan provided 85 additional spaces, thus lessening the degree of non-conformity as the project is completed. Since the 2002 approval there has been a net increase of one parking space on campus, for a total of 640 spaces today. The Belluschi Pavilion generates a demand for 10 additional parking spaces, and its placement will remove four existing spaces; therefore, 14 new parking spaces must be provided on campus. The applicant has provided a site plan showing where the 14 new spaces will be provided around the campus (Exhibit E13). This standard is met. LU 11-0010 Page 13 of 20 Two new bicycle parking spaces shall be provided for the new pavilion. The site plan (Exhibit E8) does not illustrate the location of these new spaces. As a condition of approval, the applicant must submit a revised site plan showing the location of two bicycle parking spaces, to the satisfaction of staff. As conditioned, this standard is met. Transit [50.56.005-50.56.0251 This standard is applicable to new institutional uses located on a transit street or within one-quarter mile of a transit street and requires that transit facilities and transit-oriented features be provided. A pedestrian path leads to Highway 43 and a bus stop for Tri-Met route 35 is located at the main private road entrance to the campus (Exhibit E15). This standard is met. Access [LOC 50.57.005—50.57.0351 This standard is applicable to the construction of an institutional building and requires every lot to abut a street for a width of at least 25 feet and prescribes standards for the design of access points. The campus abuts Highway 43 for almost a half a mile. The project improvements that have been completed so far on the site include the reconstruction of the Furman Drive access to the university, which was completed between 2006 and 2008; no modifications to Furman Drive are proposed. This standard is met. On Site Circulation— Driveways and Access Roads [LOC 50.58.005-50.58.0351 This standard establishes specific design requirements for driveways and fire access roads. Staff finds that the primary access road, which will not be altered with the construction of the Belluschi Pavilion, satisfies the dimensional standards for fire lanes. The Fire Marshal finds that access is adequate vehicles (Exhibit F2). On-Site Circulation—Bikeways,Walkways and Accessways [LOC 50.59.005- 50.59.0301 This standard is applicable to all minor development involving the construction of a new institutional building and requires that developments of one acre or more provide a pedestrian circulation plan for the site. Walkways shall connect at least one public entrance of each building accessible to the public to the nearest public walkway. As shown in Exhibit E15, the campus provides an extensive system of connecting pathways along the loop roadway. The Belluschi Pavilion will be connected to the nearest sidewalk by a new pathway from the northwest corner of the pavilion (Exhibit E8). This standard is met. Utility Standard [LOC 50.64.005- 50.64.0351 The applicant has reconstructed utilities within the campus, including a new stormwater system, sewer upgrades and a new public waterline. The Belluschi LU 11-0010 Page 14 of 20 Pavilion will connect directly to these utilities. As shown on the site plan (Exhibit ES), the pavilion will be located directly over a 6" sanitary sewer line. As this is a private line and there are no code or regulation prohibitions regarding the placement of the pavilion over the line, this standard is met. (Thus, the placement of the structure over the sewer line is at the applicant's risk). 3. Any additional statutory, regulatory or Lake Oswego Code provisions which may be applicable to the specific major development application; City of Lake Oswego Fence Code FLOC Chapter 451 The Fence Code (LOC Chapter 45.15) requires that fences, walls and retaining walls in non-residential zones cannot exceed eight feet in height, and any fence over six feet in height must be screened by an evergreen hedge. There are no fences proposed with this project. The pavilion will be supported by small retaining walls at its perimeter; these retaining walls are less than four feet in height (Exhibit E8). This standard is met. City of Lake Oswego Sign Code FLOC Chapter 471 Signs are reviewed for compliance with the specific sign standards relating to the zone where the sign is to be placed and design standards applicable to all permanent signs per the Sign Code. No sign permit applications are included as part of this application. All signage shall comply with the provisions of the Sign Code to be compatible with those in the surrounding area [LOC 47.06.200(4)]. Sign permits will be required and each proposed sign will be reviewed for compliance when the sign permit application is received. This standard can be met at the time of sign application. City of Lake Oswego Tree Code FLOC Chapter 551 Tree Removal This code is intended to preserve trees. Only those trees that must be removed in order to site proposed improvements will be granted tree removal permits. No trees are proposed for removal for the construction of the pavilion. This standard is met. Tree Protection Tree protection fencing is required when a tree protection zone or drip line of a tree that is five inches in diameter of greater is within the construction zone, whether on- or off-site. There are several trees in the vicinity of the construction area for the Belluschi Pavilion which will need protection fencing (Exhibit ES). As authorized by 50.08.020, a tree protection application and plan should be submitted for staff review and approval prior to conducting any activities on site, including, but not limited to, clearing, grading, landscaping or excavation. LU 11-0010 Page 15 of 20 A tree protection plan shall be submitted for staff review and inspection prior to commencing any construction activities. Tree protection fencing shall be placed at the tree protection zone, which is the zone required to protect the critical root area necessary for the continued health of the tree. The applicant shall propose the tree protection zone for each tree, for review and approval by staff. As required by LOC 55.08.030(7), no construction, excavation, root pruning or other activity shall occur within the tree protection zone unless directed by an arborist present on site and approved by the City. To assure the long term survival of the remaining trees, including Tree 59 whose protection was not analyzed in the arborist's report (Exhibit F3), the applicant will be required to assure that a consulting arborist will review the final site, grading and landscape plan, and will be available for services as described above if construction activities are proposed within the tree protection zone. All tree protection plans submitted shall clearly illustrate all areas impacted by construction activities on site (including landscaping), the location of temporary fencing around the tree protection zone is within the drip line of a tree, or other tree protection measures as recommended by a certified arborist. In addition, signs should be placed on the fencing and notes added on the construction documents that informs the site contractors about the necessity of preventing damage to the trees, including bark and root zone, and that no materials should be stored nor compaction occur within the root zones of adjacent trees. As conditioned, this standard can be met. City of Lake Oswego Historic Preservation Code Roe Chapter 581 The site contains several historic landmarks as mentioned above. The applicant states that the specific location of the Belluschi Pavilion, which was built in 1951, was selected due to its relationship with other contemporary mid-20th Century structures on the campus. As shown in Exhibits E14 and E15, the structure is proposed to be located near other mid-century structures such as Clark Commons (1961), Mayer Art Building (1954) and Villa Maria (1966), while the historic landmarks structures, built in the 1930s, are located more than 200 feet to the north. However, the Statements of Significance for these historic structures do not identify the campus as a whole as historic, but rather focus on the individual buildings. Due to the distance between the Belluschi Pavilion and the historic landmarks, staff finds that the provisions of Chapter 58 do not apply. The compatibility of the Belluschi Pavilion with other structures on campus is addressed under the Building Design standards above. 4. Any applicable condition of approval imposed pursuant to an approved ODPS or prior development permit affecting the subject property. There are no outstanding conditions of approval that affect the subject property. LU 11-0010 Page 16 of 20 VII. CONCLUSION Based upon the materials submitted by the applicant and findings presented in this report, staff concludes that LU 11-0010 complies with all applicable criteria and standards or can be made to comply through the imposition of conditions. VIII. RECOMMENDATION Staff recommends approval of LU 11-0010, subject to the following conditions: A. The approval of LU 11-0010 shall be valid for a 3-year period from the date of this decision, and shall be void if the construction is not completed within that time period. B. Prior to Issuance of any Building Permit, the Applicant/Owner Shall: 1. Submit final building/site plans for review and approval of staff that are the same or substantially similar to the site plan and elevations illustrated on Exhibits E8 through E12, with the following modifications: a. Submit a revised site plan showing the location of two bicycle parking spaces, to the satisfaction of staff. 2. Submit a tree protection permit application as required by LOC 55.08.020 and 55.08.030 for review and approval by staff, including off-site trees that are within the construction zone. The plan shall include: a. The location of temporary tree protection fencing, consisting of a minimum 6-foot high cyclone fence secured by steel posts around the tree protection zone, or as recommended by the project arborist and approved by the City. b. A note stating that no fill or compaction shall occur within the critical root zones of any of the trees, or that if fill or compaction is unavoidable, measures will be taken as recommended by a certified arborist to reduce or mitigate the impact of the fill or compaction. The note shall also inform contractors that the project arborist shall be on site and oversee all construction activities within the tree protection zone. c. A note that clearly informs all site contractors about the necessity of preventing damage to the trees, including bark and root zone. The applicant and contractor(s) shall be subject to fines, penalties and mitigation for trees that are damaged or destroyed during construction. d. A sign shall be attached to the tree protection fencing which states that inside the fencing is a tree protection zone, not to be disturbed unless prior written approval has been obtained from the City Manager and project arborist. LU 11-0010 Page 17 of 20 3. Provide evidence that the project certified arborist has reviewed and approved the final site, grading and landscape plans, to the satisfaction of staff. C. Prior to any Demolition or Construction Activity on the Site,the Applicant/Owner Shall: 1. Comply with Conditions of Approval B(1)-(3), above. 2. Install all tree protection measures as required by Condition B(2) above. The tree protection fencing shall be inspected and approved by City staff prior to commencing any construction activities. 3. Apply for and obtain an erosion control permit, and install all erosion control measures. D. Prior to Final Building Inspection or Occupancy of the Structure, the Applicant/Owner Shall: 1. Install all landscaping as shown on Exhibit E10. 2. Stripe 14 new parking spaces, as shown on Exhibit E13, and mark any compact spaces as such. 3. Provide a one-year guarantee (one 12-month growing season from the date of installation) for all landscape materials, pursuant to LOC 50.47.020. The guarantee shall consist of a security in the amount of five percent of the total landscaping cost (including labor and cost of landscaping materials). E. Prior to Installation of Any Signs, the Applicant/Owner Shall: 1. Obtain all necessary sign permits. The applicant/owner shall submit sign plans and elevations in accordance with the Sign Code for review and approval by staff. Colors and materials of the signs shall be compatible with the architectural details and colors of the approved building. Neon signs shall be prohibited. [Note: The Condition of Approval regarding sign limitations is not exclusive to the requirements and standards that will be reviewed when a sign permit application is submitted; there are additional compatibility standards in the Sign Code [LOC Chapter 47] for signs relating not only to the building itself but to the surrounding area.] LU 11-0010 Page 18 of 20 Note: 1. Development plans review, permit approval, and inspections by the City of Lake Oswego Development Review Section are limited to compliance with the Lake Oswego Community Development Code, and related code provisions. The applicant is advised to review plans for compliance with applicable state and federal laws and regulations that could relate to the development, i.e., Americans with Disabilities Act, Endangered Species Act. City staff may advise the applicant of issues regarding state and federal laws that the City staff member believes would be helpful to the applicant, but any such advice or comment is not a determination or interpretation of federal or state law or regulation. EXHIBITS A-D. [No current exhibits; reserved for hearing use] E. GRAPHICS/PLANS El. Tax Map E2. Vicinity Map E3. Sensitive Lands Atlas E4. Aerial Map E5. Contour Map E6. Existing Conditions E7. Demolition Plan E8. Site Plan, Grading and Erosion Control E9. Utility Plan E10. Landscape and Irrigation Plan E11. Elevations E12. Floor Plan E13. Parking Plan E14. Master Plan E15. Campus Circulation Map F. WRITTEN MATERIALS Fl. Applicant's Narrative, dated April 21, 2011 F2. Fire Marshal's Memorandum G. LETTERS Neither for nor Against (G1-99) None LU 11-0010 Page 19 of 20 Support (G100-199) None Opposition (G200+) None Date of Application Submittal: April 1, 2011 Date Application Determined to be Complete: June 29, 2011 State Mandated 120-Day Rule: October 27, 2011 LU 11-0010 Page 20 of 20 1 2 3 4 5 6 7 9 10 11 13 14 15 16 17 19 20 21 22 23 24 26 29 30 31 32 33 34 35 36 37 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68