HomeMy WebLinkAbout20-27 RESOLUTION 20-27
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LAKE OSWEGO MODIFYING AND
INCREASING BUILDING DIVISION PERMIT FEES AND PLAN REVIEW FEES IN RESPONSE TO
IMPLEMENTATION OF THE STATE OF OREGON PERMITTING SYSTEM
WHEREAS, in order to use the State of Oregon electronic permitting system, it is necessary for the
City's Building Division to add missing fees and to modify the way fees are calculated in order to
align with the State methodology; and
WHEREAS, it is also necessary to update Building Division fees in order to support the cost of
Building Division services;
WHEREAS, this Resolution amends the Master Fees and Charges for the City. The revision to
fees and charges resulting from this Resolution, shall be incorporated into the City's Master
Fees and Charges schedule.
NOW,THEREFORE, IT IS RESOLVED by the City Council of the City of Lake Oswego that:
Section 1. Fees for the Building Division of the City's Planning and Building Services
Department are hereby adjusted as shown on Exhibit A to this Resolution (new material shown
with underlined type, deleted material shown with strikcthrough typo)
Section 2. Effective Date. This Resolution shall take effect immediately upon adoption.
Considered and enacted at the regular meeting of the City Council of the City of Lake Oswego on
the 6th day of October 2020.
AYES: Mayor Studebaker, LaMotte, Wendland, Manz, Kohlhoff, O'Neill, Nguyen
NOES: None
EXCUSED: None
ABSTAIN: None
Kent Studebaker, Mayor
ATTEST:
Anne-Marie Simpson, City Recorder
APPROVED AS TO FORM:
David Powell, City Attorney
EXHIBIT A
Section 9: Building
Building Division
A 12%surcharge fee as mandated by the State Building Codes Division is applied to all permit fees.
The following fees shall be charged for the Building Division activities of the City (LOC 45.01.040):
Building Permits
Valuation is based on the tables referenced in Oregon Administrative Rule 918-050-0100 and 0110.
1. Total Valuation
$ 1 to$2,000 $ 97 up to and including$2,000
$2,001 to$25,000 $ 97 for the first$2,000 plus$9.40 for each additional$1,000
or fraction thereof, up to and including$25,000
$25,001 to$50,000 $293 313.20 for the first$25,000 plus$6.75 for each additional$1,000
or fraction thereof, up to and including$50,000
$50,001 to$ 100,000 $46-2-481.95 for the first$50,000 plus$4.70 for each additional$1,000
or fraction thereof, up to and including$100,000
$ 100,001 to$500,000 $646-716.95 for the first$100,000 plus$3.00 for each additional$1,000
or fraction thereof, up to and including$500,000
$500,001 to$ 1,000,000 $189G-1,916.95 for first$500,000 plus$2.55 for each additional$1,000
or fraction thereof, up to and including$1,000,000
$ 1,000,001 and up $3,171 191.95 for first$1,000,000 plus$1.65 for each additional$1,000
or fraction thereof
2. Minimum Structural Permit Fee $97
2,3_Plan review fees 65%of structural permit fee
3,4. Fire&life safety review fee 40%of structural permit fee(on commercial only)
4.5. Other inspections-see also Other Inspections and Fees(pg.42)
a. Inspections for which no fee isspecifically indicated $97 per hour
b. Additional plan review required by changes,additions,or revisionsto plans $97 per hour
5,6. Phased permitsPlan Review
Phased permit Plan Review{Plan Review)fees shall be$250 plus 10%of the total project building permit
fee and shall not exceed$1,500 pursuant to the authority of OAR 918-050-0160.This is in addition to
standard plan review fees.
6:7. Deferred submittal Plan Reviews
The fee for processing and Plan Review of deferred submittals shall be 10% of the
building permit fee,using the value of the particular deferred portion or portions of $275 plus plus
the project but not less than $275. This fee is in addition to standard Plan Review plan review
fees
fcc
7, Architects and Engineer's exemption for plan review of"conventional light frame
Page 34 2020 Master Fees and Charges
Section 9: Building
jurisdiction) pursuant to the authority of ORS 455.628
8. Administration fee for processing and facilitating issuance $ 250
2020 Master Fees and Charges Page 35
Section 9: Building
9. Commercial Fire Systems—based on valuation,see Structural Permit Fee Table
9-10.Residential Fire System—Standalone System Stand alone and multi purpose sprinkler system
f lti C tinu u kl ,�+ f incudes plan review
Square footage Permit fee Plan review fee
0 to 2,000 $ $ 9��-^00
440231.00
2,001 to 3,600 $ $ 123.50
190313.50
,00
3,601 to 7,200 $ $ 116.25
226.00372
.25
7,200 and above $ $ 172.25
265.00437
.25
11. Prescriptive Solar Panel Installation Permit—includes plan review(does not include Electrical Permit) * $ 125
40 12.
Non-Prescriptive Solar Panel Installation See Building Permit Fee Valuation Schedule
4413. Change of Occupancy$250
414. Temporary Certificate of
Occupancy $ 125 per month
*Fee is required by Oregon Administrative Rule#918-050-0180
Electrical Permits
1. New residential,single or multi family perone-and two-family dwelling unit
1,000 square feet or less $ 143.10293.60
Each additional 500 square feet or portion thereof $27.0059.80
Each manufactured home, modular dwelling service,or feeder $67.50118.50
Limited energy $54:09100.00
New multi-family largest unit is calculated as per square footage rates
above and each additional unit calculated at 50%of the fee for the largest
unit
2. Service or feeders: installations, alterations,or relocation
200 amps or less $85.05175.05
201 amps to 400 amps $ 101.25231.60
401 amps to 600-599 amps $ 168.75349.05
600 amps $349.05
601 amps to 1,000 amps $220.05524.10
Over 1,000 amps or volts $506.25958.45
Reconnect only $67.50110.00
3. Temporary services or feeders: installations, alterations,or relocation
200 amps or less $67.50102.20
201 amps to 400 amps $93.15217.45
401 amps to 600-599 amps $ 135.00293.60
600 amps $293.60
601 amps to 1,000 amps $22 430.00
Page 36 2020 Master Fees and Charges
Section 9: Building
Over 1,000 amps or volts $506.25814.65
4. Branch circuits: new, alteration,or extension per panel
with purchase of service or feeder,each $6.7513.45
Without purchase of service or feeder
First circuit $62.2597.85
Each additional circuit $6.7513.45
5. Miscellaneous(service or feeder notincluded) $r
Each pump or irrigation circle 67.50118.50
Each sign or outside lighting $§759118.50
Signal circuit(s)or a limited energy panel, alteration, or extension $67.50118.50
Renewable energy for electrical systems-5kva or less $151.15
Renewable energy for electrical systems-5.01kva through 15kva $180.45
Renewable energy for electrical systems-15.01kva through 25kva $293.85
Renewable energy—solar generation over 25kva $293.85+11.74
(permit charge will not increase beyond the calculation for 100kva) per added kva
Renewable energy for wind systems—25.01 through 50kva $587.75
Renewable energy for wind systems—50.01kva through 100kva $1,175.55
Renewable energy for wind systems—misc.fee, hourly rate $ 110.00
Each additional inspection over the allowable in any of the above, perinspection_ $ 110.00
—see also Other Inspections and Fees(pg.42)
7. Special inspections per hour $9-7-110.00per—
8. Master Electrical Permit—on time application fee #ems
9. Master Electrical inspections-per hour $ 100.00
Initial $ 110.00
10. Electrical permit plan review fee is 25%of the electrical permit fee.
11. Addition plan review—electrical—per hour $ 110.00
2020 Master Fees and Charges Page 37
Section 9: Building
Mechanical Permits (Residential)
Unit Fee Schedule
1. For the installation or relocation of each forced air or Gravity type furnace or burner,
including ducts and vents attached to such applianceFurnace
Less than 100,000 BTU input $36
Greater than 100,000 BTU input $36
2 For the installation or relocation of each floor furnace,including vent $2036
2,3. Furnace/burner including duct work/vent/liner $20
3:4. For the installation or relocation of each suspended heater, recessed wall heater,or
floor mounted unit heater $29
4.5_For the installation, relocation,or replacement of each appliance vent or chimney
installed and not included in an appliance permit $20
6. For the repair,alteration,or addition of an Air Handler ogr Heat Exchanger
up to 10,000 cfm $ $2736
10,001 cfm and over $36
7 Wood orstovc Pellet stove, including hearth and wall shield $3650
5:8. Gas or wood fireplace insert $36
9. Fireplace stove, masonry,or factory built fireplaccPool or spa heaters/kilns $5020
10. Flue vent for water heater or gas fireplace $20
6,11. Decorative gas fireplace
$36
7,12. Room heaters,non
portablcoil tank/gas/diesel generators $2921
13. Boilers not exceeding 120 gallons or a water temperature of 210 degrees F or 150 PSI
operating pressure or 200,000 BTU inputlnstallation or relocation of domestic type
incinerator $
2920
8,14. Hyd
ronic hot water system $50
9,15. for each ventilation Ventilation fan connected to a single duct $14
10. For the ilnstallation of hood served by mechanical exhaust,including ducts for hood of ach range
hood which is served by mechanical exhaust,
16. including the ducts for such hood _$22
44,17. Range hood/other kitchen equipment $ $22
18. Heat pumps $50
19. and aAir conditioners $50
20. Mini split system $50
21. Evaporative cooler other than portable $50
22. Water heater includes vent/flue only $21
23. Repair,alteration,ore addition to mechanical appliance including installation of
Controls —$4 21
24. Exhaust ventVentilation system not a portion of heating or air conditioning authorized by permit $21
25. Attic/crawl space fans $14
26. Radon mitigation $ 14
27. Clothes dryer exhaust $ 13
28. Ductwork—no appliance/fixture $20
Page 38 2020 Master Fees and Charges
Section 9: Building
29. Barbecue $21
30. Chimney/line/flue/vent $20
31. Other heating/cooling $21
32. Other fuel appliance $21
33. Other environment exhaust/ventilation $21
4-2,34. Permit fees for fuel gas-piping shall be
For each gas-piping system of one tofour outlets $14
For each gas-piping system of more than four outlets,per outlet $2.20
35. For each appliance or equipment not listed aboveAppliance or equipment regulated by code but not classified in
other appliance
Categories $21
4 36. A minimum charge for
mechanical permits $7-597
37. Each additional inspection over the allowable,per inspection—see also Other Inspections and Fees(pg.42)
$97
4438. Residential Plan Review
25%of total permit fee
Mechanical Permits (Commercial)
Use this section for commercial installation, replacement,or relocation of non-portable mechanical equipment or
mechanical work not covered previously. Indicate the value of all mechanical labor, materials,and equipment.
Value Permit Fee Amount
$ 1 to$ 10,000 Less than 5000 $/10.2597.00
$5,001-$10,000 $97.00 plus$ 1.351.50 for each additional $ 100 over$-5-1,000
$ 10,001 to$ 100,000 $253 172.00, plus$8.3010.20 for each additional$ 1,000 over$10,000
$ 100,001 and above $ 1,5601090.00 plus$5.707.00 for each additional $-1,000 over$ 100,000
Plan review Fees A mechanical plan review shall be paid.The fee is equalto
25%of the total permit fee.
2020 Master Fees and Charges Page 39
Section 9: Building
Plumbing Permits (LOC 46.02) These fees do not apply when solely replacing
fixtures without re-plumbing and/or relocating
them (except for water heaters).
1. A minimum Permit Fee for issuance and first fixture is
4 $7597;
1 for each additional fixture,the fees arc as follows: Fixture fees are as follows—note,there is a minimum
Residential Plumbing permit fee of$97
Roof Drains(commercial) $24
Absorbsion valve $24
Hose bibb $24
Backwater valve $24
Catch basin or area drain $24
Drinking fountain $24
Trench drain, per 100'or any portion thereof $97
Expansion tank $24
Fixture cap off $24
Storm water retention/detention tank/facility $24
Manufactured home utilities, per 100'or any portion thereof $97
Ice maker $24
Rainwater harvesting $24
Alternate potable water heating system $24
Other-plumbing $24
Septic abandonment $24
Interceptor/grease trap $24
Manhole $24
a- Sink/basin/lavatory $24
Swimming pool piping to backflow only per 100'or any portion thereof $2497
Lavatory
F Tub (or tub and shower combination)Tub/shower/shower pan $24
Shower separate from tubUrinal $24
€.7 Water closet $24
f Dishwasher $24
g Garbage disposal $24
Washing machincClothes Washer $ 24
4 Floor drain/floor sink/hub drain $24
f= Sewer,per footper 100'or any portion thereof 6-
0.75$
97
Water heater minimum fee may apply even w/replacement} $24
4 Water service,per 100'or any portion thereofper foot 6-
0.75$_
97
m. Storm drain,per 100'or any portion thereofper foot 6-
0.75$_
97
Sewage ejector pump and sump pump $24
437 Special waste connectionPrimer $24
p- Backflow prevention device or anti-pollution device $24
q Any trap or waste not connected to a fixture $24
Page 40 2020 Master Fees and Charges
Section 9: Building
Any other plumbing installation, not otherwise listed in this schedule, $24
having a sanitary waste or potable water supply
Any othcr plumbing installation, not othcrwisc listed in this schedule,
having a sanitary waste or potable water supply $ 2'F
s: Re-piping of existing fixtures
First fixture $ 17
Each additional fixture $ 10
t Minimum fee for plumbing permits—Commercial/Residential $7-597
2. For NEW one-and two-family dwellings only,the fees are per
bathroom as follows(this fee includes 100 feet for each utility
connection, hose bibbs,icemakers, underfloor low-point drains,
and rain drain packages that include piping,gutters,downspouts,
and perimeter system):
a. One bath $333.50
b. Two baths $362.25
c. Three baths $402.50
d. Each additional bath/kitchen $ 130.80
3. Each additional inspection over the allowable,per inspection—see also Other Inspections and
Fees(pg.42) $97
4. Plumbing Plan Review-Add 30%of feels as calculated above for plan review, if required.
5. Commercial Plumbing- Medical gas fees:
a. Medical gas permit fees shall be based on the value of installation costs and the system
equipment, including but not limited to inlets,outlets,fixtures,and appliances-wok-
completed, Med Gas permits are subject to the Commercial Plumbing minimum permit
fee.
with a minimum fee of$62.50.
aMedical gas plan review—see Commercial Plumbing plan reviewfees shall be 30%of
medical gas permit fees.
15. Residential Fire System—Multipurpose/Continuous Loop system, incudes plan review
Square footage Permit fee
0 to 2,000 $231.00
2,001 to 3,600 $313.50
3,601 to 7,200 $372.25
7,200 and above $437.25
2020 Master Fees and Charges Page 41
Section 9: Building
Grading and fill permit fees
Plan Review $ 125.00
50 to 1000 cubic yards $ 150.00
1,001 to 10,000 cubic yards $250.00
10,001 to 100,000 cubic yards $350.00
100,001 cubic yards or more $450.00
Demo and Deconstruction Permits
Residential one-and two-family structures $300.00
Commercial buildings $400.00
Manufactured Home Permits-installation permit fee includes the concrete slab, runners or foundations
when prescriptive, electrical feeder and plumbing connections and all cross-over connections
Installation Permit Fee $445.00
State Fee $ 30.00
ORS 446.176(1) and OAR 918-5000105 require all local governments providing construction permits or
inspections for manufactured dwelling and cabana installations to collect and remit to the Department of
Consumer and Business Services a $30 fee for each installation permit issued.This fee is to be added to
manufactured dwelling and cabana installation permits only and should not be added to accessory structures or
building, electrical, plumbing, mechanical permits or plan reviews.
Manufactured Dwelling/RV Parks—Area Development Permit (ADP)
The Area Development Permit fee to be calculated based on the valuations shown in Table 2 of OAR
918-600-0030 for Manufactured Dwelling/Mobile Home Parks and Table 2 of OAR 918-650-0030 for
Recreational Park& Organizational Camp—and applying the valuation amount to Table 1 as referenced
for each.
Community Development Code Enforcement Charges
Single family $ 145
Multi-family $ 145 plus$145 per each 12 units
Office/Retail
0—5,000 square feet $ 145
5,001-10,000 square feet $291
10,001-25,000 square feet $434
25,001-50,000 square feet $577
50,001+square feet $723
Industrial/Public/Institutional
0—20,000 square feet $ 145
20,001-30,000 square feet $291
30,001+square feet $434
Page 42 2020 Master Fees and Charges
Section 9: Building
Record Retention and Archiving Fees
For purposes of archiving records per State mandate $25.00 minimum
Additional charge per page of submitted document
8%"x11"or8%"x14" $ 0.25 per page
8%"x17" $ 0.50 per page
18"x24" $ 2.00 per page
24"x 36" $ 3.00 per page
36"x 42" $ 4.00 per page
Other(larger than 36"x 42") $ 5.00 per page
Research and Consultation Fees
Records Research $25 per 15 minutes/request, minimum 15 minutes
Fee Estimates-new residential and commercial projects $ 100 per hour per request, minimum one-hour
Consultation for code review,hypothetical projects $ 100 per hour, minimum 1/2 hour
Supplemental Plan Review $ 100 per hour, minimum 1/2 hour
Other Inspections and Fees
1. Inspections outside of normal business hours(minimum charge=1 hour) $9-7-120.00 per hour
2. Re-inspection fee assessed under provisions Section 305(f) $97 per inspection
3. Inspections for which no fee is specifically indicated $97 per hour
4. Additional plan review required by changes, additions,or revisions to $97 per hour
approved plans(minimum charge= 1 hour)
5. Work commencing before permit issuance
Any person who commences any work on a building or structure before obtaining the necessary
permits shall be subject to an investigation fee of$125 per hour, which is equal to the average
cost of an inspection.
Exception:A one-time exemption shall apply to homeowners applying for their own permits.
Seismic Surcharge-Structural/Mechanical- 1%of building permit fee
review required on all essential structures
2020 Master Fees and Charges Page 43
Section 9: Building
Additional Miscellaneous Fees
1. The fee to a governmental agency shall be determined by the provisions
set forth under ORS 190.003 to 190.110 for the purpose of carrying out the $97 per hour or
respective responsibilities of each agency. portion thereof
2. Re-inspection fee for structural,electrical, mechanical,and plumbing
permits shall be charged for inspection of violations found by the Building $97 per hour
Official after the second violation.
3. The fee to any governmental agency or person for specifically requested $97 per hour or
inspections or surveys. portion thereof
4. Housing moving permit(LOC45.12.510):
Relocating within Lake Oswego $452
Moving out of Lake Oswego $224
Refunds
1. Permit Refunds
a. Where a permit has been issued and no inspections have been completed, 80%of the permit fee will
be refunded.
b. There are no refunds when a permit has been issued and inspections performed.
2. Plan Review Refund
a. Where a permit has not been issued,80%of the plan review fee will be refunded.
b. There are no refunds when a plan review has been started by any department.
Page 44 2020 Master Fees and Charges