Loading...
HomeMy WebLinkAbout2021-09-14_Ockert_(MH) LO stormwater_middle housing_ From: fanfh-carole(aleurooa.com To: randvarthur7Calamail.com Cc: bobandmianonacomcast.net;Olson.Erik Subject: (MH)LO stormwater/middle housing? Date: Tuesday,September 14,2021 5:31:58 PM To:Chair Arthur: Re: Stormwater,Middle Housing Committee Key Issue#3 Memo On the agenda for the upcoming Middle Housing Committee Sept. 15th meeting is Stormwater,Questions and Answers and Deliberations.In order to have substantive deliberations on the details of the amount of impervious surfaces on a lot and the subsequent impacts,the committee needs a functional understanding of how stormwater and development currently works within Lake Oswego's framework. Looking to the Key Issue#3 Stormwater Memo for understanding,I read: "The stormwater code requires that new developments and all development projects over a certain size manage all stormwater on the lot...." I brought this issue forward in my email dated August 17th,2001 that is posted on the MH website. see link: httns://www.ci.osweeo.or.us/WebLink/DocView.asnx?id=1 g60136&dbid=0&reno=CitvOfLakeOsweao The statement that new developments manage all stormwater on the lot does not seem to follow the reality of a new build in FANFH that was examined and approved by staff. Staff has said: "With respect to the specific situation you are referring to,I'll just quickly point out that those pipes are part of the design of stormwater facilities to generally ensure that post-development runoff rates do not exceed pre-development runoff rates;one of these pipes manages stormwater discharge from the lot,and the other is an emergency overflow for when the facility is clogged.The owner is generally responsible for making sure the facility operates correctly and are required to sign a maintenance agreement which runs with the land." I went with the new build's stormwater report in hand to a local soils geologist.What I learned was that the stormwater on this site in FANFH is being treated onsite during a small rain event,but NOT managed onsite.To state that water is being managed onsite requires the water to go back into the soils onsite.In this new build in progress,the water is being treated by being filtered through gravel,sand and plantings in a completely enclosed cement cistern adjacent to the full basement of the home,and then it is discharged into a gully that slopes down into Tryon Creek.For the basic physics,think swimming pool with a drain into a gully that slopes into Tryon Creek.There is no design in the system that allows for the water to infiltrate into the onsite soils.In the event of prolonged heavy rains and the cement cistern having reached capacity,the water directly releases through a pipe into the gully without any stormwater treatment at all,to avoid spilling over the top of the cistern on to the home site. I am not looking for us to rework our stormwater code.What I am saying is,as we look to siting middle housing,duplexes,triplexes,quadplexes, townhomes and cottage clusters on heretofore single family lots,the Middle Housing Committee must have an accurate understanding of how our stormwater regulations currently direct the size of infill development in Lake Oswego and how our city staff interpret and implement those stormwater regulations.If our current stormwater regulations only require stormwater be treated onsite and permit all discharge offsite,then we need to know that because we need to plan for potential impact to surrounding properties.Or we need to write stronger building code, understanding that our stormwater code is not going to hold water. Thank you. Carole Ockert Below is a copy of an email I have sent to Ryan Lentz in the Engineering Dept.to get specific answers. Hi Ryan, I have a 2 very simple questions: 1.I have had a geologist review the system design for stormwater for 977 9th and have been informed that the system does not infiltrate any water into the site at all.Can you confirm that as designed this particular cement cistern system does not infiltrate any stormwater into the site? 2.If this lot had no access to the gully,would you have allowed the same sized development to be built on the site? Thanks, Carole Carole Ockert, FANFH Land Use Liaison and Middle Housing Citizen Advisory Committee representative from the Neighborhood Chairs Committee