Loading...
HomeMy WebLinkAbout3-Presentation PCPH 1-24-22 LU 21-0057 01/24/2022 PLANNING AND O"tiA 0 BUILDING SERVICES V O OREGON.1. LU 21-0057 Planning Commission Public Hearing Annual Code Amendments - 2021 January 24 , 2022 Schedule — In process PCWS#1 PCWS#2 PC Hearing PC Findings CCWS CCPH Oct.11,2021 Nov.22,2021 Jan.24,2022 Feb.14,2022 --- March 15,2022 Concepts Draft Code»» Hearings>>» LU 21-0057 1 01/24/2022 MAINTENANCE AMENDMENTS 1: Building Design Standards for Commercial, Industrial and Multi-family Clarifies that a building is required to be complementary to other structures of similar design / characteristics, such as commercial to commercial or commercial to multi-family, but not to adjacent single-family buildings. 2: 180-day Extension Deletes obsolete 180-day extension reference for code consistency. 3: Existing Dwelling Setback from Access Lane Adds language to expressly state that the five-foot setback is measured from the edge of the 20-foot access easement. 4: Fix Conflicting Minor Variance Standards Inserts language that if the request is necessary to preserve a tree, a variance greater than 20% from yard setbacks or the Oswego Lake setback is allowed if resulting setback is not less than 50%. 5: Definition of Family Removes a maximum occupancy limit from the definition of "Family" to comply with HB 2583 that became effective on January 1. LU 21-0057 2 01/24/2022 POLICY AMENDMENTS 1: Expand Hours for Saturday Market Type Uses on Sunday • Current code permits "Saturday Market" type sales from 8:00 a.m. to 4:00 p.m. on Saturdays and 1:00 p.m. to 5:00 p.m. on Sundays. • Expands hours on Sundays to allow earlier start time at 11:00 a.m. 2: Boathouse Maximum Size and Setbacks • Reduces the maximum size of a boathouse located in the Oswego Lake Setback from 560 to 500 square feet, which would align with the Lake Corp. private standard and also, recent Flood Management Overlay District amendments (LU 20-0005), that includes a ministerial "boathouse variance," if < 500 sq. ft. • Clarifies that side and rear yard setbacks do not apply to boathouses with the Oswego Lake setback (25 ft.) LU 21-0057 3 01/24/2022 BOATHOUSE EXAMPLE #1 nm • Va. 1M OW a• _.. a liry�, r 449.3 sf a X' Coat name. g F _4: i.13 .‘ :,:i 1___ i 21 ...ks.. . • • r 9;i BOATHOUSE EXAMPLE #2 .._, �I� r� — t f e.*eireo.ma. M owmEv... p.t RilM.9F •1.99 sf wi.0 ilkINi a'''''' CO RUM:EMT. L Mi3 � wit oil 11.15..5 IN]NE.ANNO WALL rr .\________...... ....-----. 1HYiiEyteoa LU 21-0057 4 01/24/2022 BOATHOUSE EXAMPLE #3 -,---- -za, la 'CI !4 I i .11 ' 41D6' _g r• .j 3 11 II " 1 de 111 • ., -4kt u . . : 3: Clarify Building Design Standards on Multi-building sites Adds a clarifying sentence to Subsection i to state that a new building on a multi-building site must only comply with Subsection ii in order to integrate with the remaining buildings on site. LU 21-0057 5 01/24/2022 4: Online Neighborhood Meetings Provides the option for an applicant of a land use application to hold a required neighborhood meeting online if approved by the chair of the recognized neighborhood association. 5: Online Public Hearings • The proposed changes would allow"hybrid" hearings to comply with HB 2560. • The changes would also require written submittal of evidence and requesting virtual meeting login information by noon the day of hearing and prohibiting the submission of in-person written materials. Reasons: ➢ Difficult for staff to perform intake of materials at the hearing while also conducting a hybrid meeting and for the Commission to review written materials while they are also listening to testimony.Anyone can request the mandatory continuance of the initial evidentiary hearing to submit additional written materials as necessary. LU 21-0057 6 01/24/2022 QUESTIONS? LU 21-0057 7