HomeMy WebLinkAboutAgenda Item - 2026-05-19 - Number 05.7 - 2026 Pavement Rehabilitation Contract Award 5.7 ..‘'k 0 COUNCIL REPORT V -w 0 GREGO\--" Subject: Award a Public Improvement Contract for the Construction of Work Order 378— 2026 Pavement Rehabilitation. Meeting Date: May 19th, 2026 Staff Member: Stefan Broadus, PE— Director of Special Projects Report Date: May 8th, 2026 Dan Payne— Project Manager Department: Public Works - Engineering Action Required Advisory Board/Commission Recommendation ❑ Motion ❑ Approval ❑ Public Hearing ❑ Denial ❑ Ordinance ❑ None Forwarded ❑ Resolution ❑X Not Applicable ❑ Information Only Comments: ❑ Council Direction ❑X Consent Agenda Staff Recommendation: Award a Public Improvement Contract Recommended Language for Motion: Move to Authorize the City Manager to Sign a Public Improvement Contract with Brix Paving Northwest, Inc. for the Construction of Work Order 378 - 2026 Pavement Rehabilitation in the Amount of$3,132,633. Project/ Issue Relates To: Adopted Capital Improvement Plan (CIP) project Issue before Council (Highlight Policy Question): ❑X Council Goals/Priorities ❑Adopted Master Plan(s) ❑Not Applicable BACKGROUND On October 17, 2017, City Council approved a contract to provide program management, construction management, and inspection services relating to the City's ongoing efforts to improve the pavement condition of its street network. Between 2018 and 2022, this program improved the Pavement Condition Index from 68 to 75, paved 58 lane-miles, slurry sealed 63 lane-miles, and brought nearly 300 curb ramps into ADA compliance. Respect. Fv PI'en e Trust. 503-635-0215 380 A AVENUE PO BOX 369 LAKE OSWEGO, OR 97034 WWW.LAKEOSWEGO.CITY Page 2 After the program was completed, the City performed more limited paving over the summers of 2023, 2024, and 2025. On December 17, 2024, the City Council approved a professional services contract award initiating a return to a programmatic approach with the 2026-2030 Pavement Management Program. City staff intend to return to Council annually to provide an update on the program production as well as to seek current contract approval. The next council update is anticipated in the summer of 2026 to give an overview of the 2026 scope of work that will be in progress and to request authorization to proceed with the 2027 package. DISCUSSION The 2026 Pavement Rehabilitation Project is shown in the FY 2025/26 to 2030/31 Capital Improvement Plan adopted on June 3, 2025. The major road segments included in this year's scope of work are: - Kruse Way from between Bangy Road and Kruse Oaks Drive to Carman Drive - Bangy Road from south of Kruse Way to Burma Road - Kruse Oaks Drive from Kruse Way to Meadows Road - Hallmark Drive from Mercantile Drive to Douglas Way - Collins Way from Hallmark Drive to Boones Ferry Road - Douglas Way from Hallmark Drive to Boones Ferry Road The scope of work also includes major upgrades to the existing signalization at 5 intersections; Kruse Way and Carman Drive, Kruse Way and Westlake Drive, Kruse Way and Kruse Oaks Drive, Bangy Road and Meadows Road, as well as Bangy Road and Bonita Road. Installing radar detection will bring these signalized intersections into current industry standard, are less impactful to the pavement compared to traditional traffic loops, and are far more resilient against future construction in the area. This project will also construct and/or modify about 60 curb ramps bringing them into compliance with current Americans with Disabilities Act (ADA) requirements. Most of these are located at the intersections within the paving limits. About 15 of the ramps are not within the paving limits, but rather high priority ramps identified in Lake Oswego's ADA Self Evaluation and Transition Plan.These ramps were bid with this project to realize savings with staff effort and economies of scale in construction. This project was advertised on March 30th, 2026. Bids were opened on April 215t with five proposals submitted as listed in the table below.This procurement included the City's Good Faith Effort (GFE) Program encouraging participation from disadvantaged businesses. The City's program is closely connected to the State Certification Office for Business Inclusion and Diversity (COBID) whose goal is to "level the playing field by providing certified firms a fair opportunity to compete for government contracts regardless of owner ethnicity,gender,disability, or firm size". Bid results were as follows: Respect. Excellence. Trust. Service 503-635-0215 380 A AVENUE PO BOX 369 LAKE OSWEGO, OR 97034 WWW.LAKEOSWEGO.CITY Page 3 Bid I COBID I GFE Forms I Total Contractor Bid Price Points Certified 1 & 2 Points Rank Brix Paving Northwest $3,132,633.00 90.00 0 2 92.00 1 S-2 Contractors $3,370,893.70 83.15 0 5 88.15 2 Roy Houck Construction $3,316,229.21 84.73 0 3 87.73 3 Knife River Corporation $3,556,697.25 77.82 0 2 79.82 4 KNL Industries $4,934,861.07 38.22 0 2 40.22 5 FISCAL IMPACT The project is primarily paid for by the Street Fund, which is a combination of local street maintenance (utility) fee, State motor vehicle fees (including gas taxes), Clackamas County vehicle registration fees, and a General Fund transfer. Aligned with the City's "Dig Once" approach, included in the project are minor improvements to the City's water and stormwater systems which are paid for from their respective funds. Funding for pavement management is shown in the Capital Improvement Plan and allocated in the Biennium Budget as $4 million each year of the biennium. The 2026 Pavement Rehabilitation project will be delivered within those funds. RECOMMENDATION Authorize the City Manager to sign a public improvement contract with Brix Paving Northwest, Inc. for the Construction of Work Order 378 - 2026 Pavement Rehabilitation in the Amount of $3,132,633. Respect. c . �!e Trust -—1._. 503-635-0215 380 A AVENUE PO BOX 369 LAKE OSWEGO, OR 97034 WWW.LAKEOSWEGO.CITY Conformed to Bid Documents ATTACHMENT 1 CONTRACT DOCUMENTS FOR THE CONSTRUCTION OF WO 378 — 2026 PAVEMENT REHABILITATION PROJECT FOR City of Lake Oswego MARCH 2026 F �A F O City of Lake Oswego 0 --- i, . ,, Engineering Department C. 380 A Avenue P. O. Box 369 V Air o 01 Lake Oswego, Oregon 97034 �OREGO\s\ Conformed to Bid Documents O 21 I Ikeht V �W O OREGO‘.4 CONTRACT DOCUMENTS FOR THE CONSTRUCTION OF WORK ORDER 378 2026-2030 PAVEMENT MANAGEMENT PROGRAM: 2026 PAVEMENT REHABILITATION PROJECTS FOR CITY OF LAKE OSWEGO, OREGON APRIL 2026 PROFESSIONAL OF RECORD CERTIFICATION(S): Signing as the Professional of Record for the divisions and sections listed below: 00210, 00220, 00221, 00222, 00223, 00280, 00290, 00305, 00310, 00320, 00331, 00350, 00405, 00440, 00470, 00490, 00610, 00620, 00641, 00730, 00744, 00748, 00749, 00759, 00850, 00855, 00865, 00867, 00905, 00940, 01030, 01040, 01095, 02030, 02050, 02320, 02450, 02560, 02910. Conformed to Bid Documents `2011111.6% �~ O OREGOr\ CONTRACT DOCUMENTS FOR THE CONSTRUCTION OF WORK ORDER 378 2026-2030 PAVEMENT MANAGEMENT PROGRAM: 2026 PAVEMENT REHABILITATION PROJECTS FOR CITY OF LAKE OSWEGO, OREGON APRIL 2026 PROFESSIONAL OF RECORD CERTIFICATION(S): Signing as the Professional of Record for the <,0 PROFESS/ divisions and sections listed below: I N f F� ��' 4'�� � � 00950, 00960, 00962, 00990 107033 igitally3.2 Signed A ' O G6A026.03 3:52:56 PM Vf/PCH „, ti��P gRIAEk EXPIRES: DEC.31,2026 Conformed to Bid Documents ` Of I I I I kbty �W O OREGOr\ CONTRACT DOCUMENTS FOR THE CONSTRUCTION OF WORK ORDER 378 2026-2030 PAVEMENT MANAGEMENT PROGRAM: 2026 PAVEMENT REHABILITATION PROJECTS FOR CITY OF LAKE OSWEGO, OREGON APRIL 2026 PROFESSIONAL OF RECORD CERTIFICATION(S): Signing as the Professional of Record for the divisions and sections listed below: �Ep PROF 0;t:NG N F `ri0 01140, 01150, 01160, 01170 69367PE DgaaAy s o %• Adam Crar DAM:20:6. r...vD;HO 00' 00 ''y gq ��11.� PQ 4f4pSEPH Gii RFNEWS 12.31.2027 Conformed to Bid Documents dCiati C) V Allr� O OREGOc� CONTRACT DOCUMENTS FOR THE CONSTRUCTION OF WORK ORDER 347 2024 HIGH PRIORITY CURB RAMPS FOR CITY OF LAKE OSWEGO, OREGON APRIL 2026 PROFESSIONAL OF RECORD CERTIFICATION(S): Signing as the Professional of Record for the divisions and sections listed below:00210, 00221, 00270, 00280, 00305, 00310, 00320, 00470, 00490, 00744, 00759, 00865, 00867, 00905, 01070 Conformed to Bid Documents CONTRACT DOCUMENTS FOR THE CONSTRUCTION OF WORK ORDER 378 2026 PAVEMENT REHABILITATION PROJECT FOR CITY OF LAKE OSWEGO, OREGON TABLE OF CONTENTS Pages BID BOOKLET Bidder's Checklist pgs. 1 Invitation for Bids pgs. 2 Bid Form pgs. 11 Bid Bond pgs. 1 First-Tier Subcontractor Disclosure Form pgs. 1 GFE Program: Form 1—Subcontractor & Self-Perform List pgs. 6 GFE Program: Form 2— COBID Subcontractor Contact & Bid Received Log pgs. 1 GFE Program: Form 3— Monthly or Periodic Subcontractor Payment & Utilization Report pgs. 1 CONTRACT BOOKLET Public Improvement Contract pgs. 4 Performance Bond pgs. 3 Payment Bond pgs. 3 Prevailing Wage Rates pgs. 1 CONDITIONS OF THE CONTRACT General Conditions for Construction for the City of Lake Oswego pgs. 145 Special Provisions pgs. 66 SUPPLEMENTAL INFORMATION Addendums 1 & 2 pgs. 9 SUPPLEMENTAL INFORMATION (BOUND SEPARATELY) Appendix A— Pavement Evaluation Report pgs.169 SUPPLEMENTAL DRAWINGS (BOUND SEPARATELY) Volume 2—WO 378 2026 Pavement Rehabilitation Project Final Plans pgs. 143 Volume 3—WO 347 2024 High Priority ADA Curb Ramps Final Plans pgs. 24 2026/WO 378 Table of Contents- 1 Conformed to Bid Documents BID BOOKLET Conformed to Bid Documents BIDDER'S CHECKLIST FORMS TO EXECUTE FOR SUBMISSION OF BID The Bidder's attention is especially called to the following forms which must be executed in full before Bid is submitted: ❑ Bid Form ❑ First-Tier subcontractor Disclosure Form: within 2 hours of Bid Closing (if City's estimate of contract value or Bidder's Bid is over $100,000) ❑ Good Faith Effort Equity Contracting Program (GFE) — o Form 1 —Subcontractor and Self-Perform List o Form 2— Contact and Bids Received Log and Solicitation Letter. ❑ Bid Bond FORMS TO EXECUTE AFTER AWARD OF BID ❑ Public Improvement Contract ❑ Performance Bond ❑ Payment Bond ❑ Public Works Bond for PW Projects over $100,000.00. See General Conditions 00170.20. ❑ Certificate of Insurance including Additional Insured Provision in accordance with the General Conditions. ❑ GFE Form 3 — Monthly or Periodic Subcontractor Payment and Utilization Report— Due monthly or periodically after award of Contract 2026/WO 378 Bidders Checklist- 1 Conformed to Bid Documents INVITATION FOR BIDS FOR WORK ORDER 378 2026 PAVEMENT REHABILITATION PROJECT FOR CITY OF LAKE OSWEGO LAKE OSWEGO, OREGON Bid Closing Time: 2:00 p.m., local time, April 21, 2026 SCOPE OF WORK: The scope of work consists of pavement rehabilitation on various streets within Lake Oswego as well as major upgrades to the existing signalization at five (5) intersections: Kruse Way and Carman Drive, Kruse Way and Westlake Drive, Kruse Way and Kruse Oaks Drive, Bangy Road and Meadows Road, as well as Bangy Road and Bonita Road. These improvements will bring these signalized intersections into current industry standards for detection. This project will also construct about 60 curb ramps bringing them into compliance with current Americans with Disabilities Act (ADA) requirements. Most of these are located at the intersections within the paving limits. Work will consist of: 1. Temporary signage for pedestrian and traffic control 2. Replacement of several stormwater catch basins 3. Removal of asphalt concrete (grinding) 4. Construction of asphaltic concrete pavement inlays and overlays 5. Installation of pavement markings 6. Installation and replacement of some water lines 7. Performance of additional and incidental work as called for by the specifications and plans. COMPLETION: Project Substantial Completion shall be September 26, 2026, and Project Final Completion shall be October 16, 2026. MANDATORY PRE-BID MEETING: 2:00 p.m., local time, April 8, 2026. Interested bidders may attend via: • In-person only: City Hall 380 A Ave, Lake Oswego, OR 97034— Ponderosa conference room. If a bidder has accessibility concerns, please contact the Project Manager at least four (4) business days prior to the meeting. HOW TO REVIEW CONTRACT TERMS, CONDITIONS, AND SPECIFICATIONS: The Contract Documents may be reviewed: • Electronically: To download the Contract Documents, receive all notifications and addenda, and view the Planholder List, a person or company must create an account and add their name or company to the Planholder List at www.ci.oswego.or.us/bids/. For website assistance regarding this invitation, contact Cindy Waggener at 503.635.0289. 2026/WO 378 1 Conformed to Bid Documents PUBLIC WORKS/PUBLIC IMPROVEMENT PROJECT. This project is subject to Oregon minimum wage rate requirements of ORS 279C.800 through 279C.870. HOW TO SUBMIT A BID: Bids shall be submitted electronically only and must be received before the Bid Closing Time. To submit electronic (PDF) bids, bidders must complete all required fields and upload bid forms at: http://www.ci.oswego.or.us/formslf/BIDupload?BME=sbroadus@lakeoswego.city&BCD=04/21/2026 Once submitted, the Bidder will receive an automated email confirmation. Bidder may also verify receipt by phone: 503.635.0267. Bids will not be accepted after the Bid closing time. Bidders are encouraged to submit bids early. Bidders must submit a Bid Security to the City, along with their Bid, in an amount of 10%. BID OPENING: Bids will be publicly opened at 2:30 p.m., local time,April 21, 2026. The Bid Opening will be accessible online and by telephone conference. Interested parties may attend via: • Video: Online streaming at https://Iakeoswego.webex.com/join/sbroadus • Telephone Conference: 408-418-9388, meeting number 2484 961 0167. If a Bidder wishes to be personally present at the Bid Opening or if you have accessibility concerns, please contact the Project Manager at least four (4) business days prior to the Bid Opening. The City will investigate and determine the qualification of the apparent successful Bidder as part of its evaluation of the responsive Bid with the highest points. See Special Provisions Section 00120— Bidding Requirements and Procedures. Because the City's estimate of the contract value is $100,000 or greater, bidders must submit a First Tier Subcontractor Disclosure Form (provided in the Bid Documents) to the City no later than 4:00 p.m., local time, on the date for receipt of bids. The First Tier Subcontractor Disclosure Form shall be submitted electronically to the same link as the Bid. QUESTIONS/CLARIFICATION: Questions about meaning or intent of the Bid Documents shall be submitted through the project bid site no later than seven (7) days prior to Bid Closing Time. Clarifications to the Bidding Documents will be made by addenda only. Oral statements may not be relied upon and will not be binding or legally effective. Published in the Daily Journal of Commerce on March 30 and April 1, 2026. 2026/WO 378 2 Conformed to Bid Documents BID FORM (A) PROJECT IDENTIFICATION: 2026 PAVEMENT REHABILITATION PROJECT (B) CONTRACT IDENTIFICATION AND NUMBER: WORK ORDER 378 THIS BID IS SUBMITTED TO: The Honorable Mayor and City Council City of Lake Oswego 380 A Avenue Lake Oswego, Oregon 97034 1. The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an agreement with Owner in the form included in the Contract Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within the Contract Times indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. 2. Bidder accepts all of the terms and conditions of the Advertisement or Invitation for Bids and Solicitation Documents, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for sixty days after the day of Bid opening. Bidder will sign and deliver the required number of counterparts of the Agreement with the Bonds and other documents required by the Solicitation Documents within fourteen (14) days after the date of Owner's Notice of Award. 3. In submitting this Bid, Bidder represents, as more fully set forth in the Agreement, that: (a) Bidder has examined and carefully studied the Solicitation Documents and the following Addenda receipt of all which is hereby acknowledged: (List Addenda by Addendum Number and Date) Addendum No. 1 Date 04/15/2026 Addendum No. 2 Date 4/17/2026 Addendum No. Date Addendum No. Date (b) Bidder has visited the site and become familiar with and is satisfied as to the general, local and site conditions that may affect cost, progress, performance and furnishing of the Work; (c) Bidder is familiar with and is satisfied as to all federal, state and local Laws and Regulations that may affect cost, progress, performance and furnishing of the Work. 2026/WO 378 Bid Form - 1 Conformed to Bid Documents (d) Bidder has carefully studied all reports of subsurface or geologic investigations conducted at or contiguous to the site, if any, in accordance with General Conditions 00120.25—Subsurface Investigations and related Special Provisions if any. Bidder accepts the determination set forth in General Conditions 00120.25 of the extent of the technical data contained in such reports upon which Bidder is entitled to reasonably rely. (e) Bidder is aware of the general nature of Work to be performed by Owner and others at the site that relates to Work for which this Bid is submitted as indicated in the Contract Documents. (f) Bidder has correlated the information known to Bidder, information and observations obtained from visits to the site, reports and drawings identified in the Contract Documents and all additional examinations, investigations, explorations, tests, studies and data with the Contract Documents. (g) Bidder has given Engineer written notice of all conflicts, errors, ambiguities or discrepancies that Bidder has discovered in the Contract Documents and the written resolution thereof by Engineer is acceptable to Bidder, and the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work for which this Bid is submitted. (h) This Bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid; Bidder has not solicited or induced any person, firm or corporation to refrain from bidding; and Bidder has not sought by collusion to obtain for itself any advantage over any other Bidder or over Owner. (I) Bidder has not discriminated against minority business enterprises, woman business enterprises, or emerging small business enterprises in obtaining any required subcontracts, in accordance with ORS 279A.110(4). (j) The Bidder acknowledges whether he is/is not registered with the Oregon Construction Contractors Board by placing his initials on the appropriate line: The undersigned as a Bidder, IS registered with the Oregon Construction Contractor's Board. X The undersigned as a Bidder, IS NOT registered with the Oregon Construction Contractor's Board. The Bidder is NOT on a list created by the Construction Contractors Board under ORS 701.227 for Bidders who are not qualified to hold a contract for public improvement. 2026/WO 378 Bid Form -2 Conformed to Bid Documents (k) The Bidder acknowledges whether he is/is not licensed by the State Landscape Contractors Board as required by ORS 671.530 and ORS 701.005, by placing his initials on the appropriate line. The undersigned as a Bidder IS licensed by the State Landscape Contractors Board. The undersigned as Bidder IS NOT licensed by the State Landscape Contractors Board. x (I) The Bidder acknowledges whether he is/is not a resident Bidder in the State of Oregon by placing his initials on the appropriate line: The undersigned as a Bidder IS a resident Bidder in the State of Oregon. x The undersigned as Bidder IS NOT a resident Bidder in the State of Oregon. (m) Bidder certifies that all subcontractors performing Work described in ORS 701.005(2) (i.e., construction Work) will be registered with Construction Contractors Board or licensed by the State Landscape Contractors Board in accordance with ORS 701.035 to 701.055 before the subcontractors commence Work under the Contract. (n) That the provisions required by ORS 279C.838 and ORS 279C.840, and if applicable, Davis-Bacon Act (40 U.S.C. 3141 to 3148) relating to prevailing wage rates shall be included in this Contract. (o) The undersigned agrees that if awarded the Contract, and after the date of receipt of written Notice to Proceed, he/she will diligently pursue and complete the work within the time limits specified in the Contract. (p) Bidder does hereby represent that the unit prices submitted are those at which Bidder will perform the Work involved. Bidder acknowledges that quantities are not guaranteed and final payment will be based on actual quantities determined as provided in the Contract Documents. (q) Bidder does hereby propose to furnish all labor, materials, equipment, and services necessary to construct and complete the project entitled: WO 378 2026 Pavement Rehabilitation Project, for the sums set forth in the following Bid Schedule, and Measurement and Payment Provisions. (r) The Bidder acknowledges whether he is/is not a COBID-certified firm in the State of Oregon by placing his initials on the appropriate line: The undersigned as Bidder IS a COBID-certified firm. The undersigned as Bidder IS NOT a COBID-certified firm. x 2026/WO 378 Bid Form - 3 Conformed to Bid Documents 4. Bidder agrees that the Work will be substantially completed and completed and ready for final payment on or before the dates or within the number of calendar days indicated in the Contract. Bidder accepts the provisions of the Contract as to liquidated damages in the event of failure to complete the Work within the times specified in the Contract. 5. The following documents are attached to and made a condition of this Bid: (a) Required Bid Security in the form of Bid Bond in the amount of which is ten percent (10%) of the total bid amount. (b) List of first-tier subcontractors (see form for filing deadline). (c) Good Faith Effort Equity Contracting Program [Optional, for points in scoring]: i. Inclusion of Good Faith Efforts for usage of COBID-certified contractors and/or subcontractors across different phases of the project. (GFE Forms 1 and 2). ii. Documentation showing the percentage of COBID-certified subcontractors employed and/or the dollar value of goods purchased from COBID-certified suppliers during past 6 months. 6. Communications concerning this Bid shall be addressed to Bidder indicated below. 7. Terms used in this Bid which are defined in the General Conditions will have the meanings indicated in the General Conditions. SUBMITTED on April 21st , 20 26 . State Contractor License No. 193102 Complete the information below. If BIDDER is: An Individual Signature N/A (Individual's Name, Typed or Printed) doing business as Business address Phone No. 2026/WO 378 Bid Form -4 Conformed to Bid Documents A Partnership Firm Name N/A Signature (Name and Title of Partner, Typed or Printed) Business address Phone No. State in which Partnership was Formed A Corporation Corporation Name Brix Paving Northwest, Inc. Signature v� --r (Officer's Name, Typed or Printed) (Title) Oregon n (State of Incorporation) Attest /`"aA/e4A (Secretary's Signature) Business address Physical: 11277 SW Clay St. Suite C, Sherwood, OR 97140 Mailing: P.O. Box 2388, Tualatin, OR 97062 Phone No. 503-570-9355 Date of Qualification to do Business 12/15/2010 2026/WO 378 Bid Form - 5 Conformed to Bid Documents A Joint Venture N/A Joint Venture Name Signature (Name of Person Signing, Typed or Printed) (Title) (Address for Official Business) (Phone Number for Official Business) (State in which Joint Venture was Formed) (Each joint venturer must sign. The manner of signing for each individual, partnership and corporation that is a party to the joint venture should be in the manner indicated above). A Limited Liability Company (LLC) N/A LLC Name By (Signature of Member/Manager) Name (typed or printed) Business Address State in which company was formed Phone No. 2026/WO 378 Bid Form -6 Conformed to Bid Documents Bid Schedule WO 378—2026 Pavement Rehabilitation Project Item Spec Description Unit Qty Price Total TEMPORARY FEATURES AND APPURTENANCES(00200) 1 0210 Mobilization LS 1 $120,000.00 $120,000.00 Temporary Work Zone Traffic Control, 2 0225 Complete LS 1 $280,000.00 $280,000.00 3 0280 Erosion Control LS 1 $8,122.63 $8,122.63 ROADWORK(00300) 4 0305 As-Built Survey Work LS 1 $16,900.00 $16,900.00 5 0310 Removal of Surfacings SQYD 1,800 $27.00 $48,600.00 6 0331 12 Inch Subgrade Stabilization SQYD 110 $46.20 $5,082.00 7 0350 Subgrade Geotextile SQYD 110 $1.25 $137.50 8 0350 Subgrade Reinforcement Geogrid SQYD 110 $10.10 $1,111.00 DRAINAGE AND SEWERS(00400) 9 0470 Concrete Inlets,Type CG-2 EA 2 $4,480.00 $8,960.00 10 0470 Concrete Inlets,Type G-2 EA 18 $3,630.00 $65,340.00 11 0470 Snout Oil and Debris Stop EA 20 $749.00 $14,980.00 12 0490 Replace Concrete Water Meter Box EA 2 $845.00 $1,690.00 13 0490 Adjusting Boxes EA 6 $225.00 $1,350.00 14 0490 Minor Adjustment of Manholes EA 6 $2,650.00 $15,900.00 15 0490 Remove and Replace Valve Boxes EA 33 $451.00 $14,883.00 BASES(00600) 16 0610 Recondition Existing Roadway SQYD 1500 $2.20 $3,300.00 Cold Plane Pavement Removal, 0-2 17 0620 Inches Deep SQYD 1,548 $3.40 $5,263.20 Cold Plane Pavement Removal, 2 18 0620 Inches Deep SQYD 37,010 $3.40 $125,834.00 Cold Plane Pavement Removal, 2-3 19 I 0620 Inches Deep SQYD 3,070 $3.40 $10,438.00 2026/WO 378 Bid Form -7 Conformed to Bid Documents Cold Plane Pavement Removal, 3 20 0620 Inches Deep SQYD 22,070 $3.40 $75,038.00 Cold Plane Pavement Removal,4 21 0620 Inches Deep SQYD 5,760 $3.40 $19,584.00 22 0640 3/4"-0 Aggregate Base TON 350 $108.00 $37,800.00 WEARING SURFACES(00700) 23 0730 Emulsified Asphalt in Tack Coat TON 27 $0.01 $0.27 24 0744 Level 3, 1/2 Inch ACP Mixture TON 9,600 $100.00 $960,000.00 Level 3, 1/2 Inch ACP Mixture with 25 0744 Fibers TON 364 $125.00 $45,500.00 12 Inch Asphalt Concrete Pavement 26 0748 Repair SQYD 177 $88.60 $15,682.20 20 Inch Asphalt Concrete Pavement 27 0748 Repair SQYD 67 $182.00 $12,194.00 28 0749 Extra for Spot Grind and Inlays SQYD 8,713 $1.50 $13,069.50 29 0749 Extra for Asphalt Approaches EA 13 $1,390.00 $18,070.00 30 0749 Extra for Asphalt Walks SQFT 556 $8.80 $4,892.80 31 0749 Concrete Driveways SQFT 415 $18.40 $7,636.00 32 0759 Concrete Curbs, Curb and Gutter LF 1,306 $59.00 $77,054.00 33 0759 Concrete Curbs, Grade Correction LF 436 $40.40 $17,614.40 34 0759 Concrete Walks SQFT 13,950 $17.00 $237,150.00 PERMANENT TRAFFIC SAFETY AND GUIDANCE DEVICES(00800) 35 0855 Bi-Directional Blue Type 1AR Markers EA 13 $22.50 $292.50 Bi-Directional Yellow Type 1AR 36 0855 Markers EA 208 $8.75 $1,820.00 Mono Directional White Type 1AR 37 0855 Markers EA 298 $8.75 $2,607.50 Thermoplastic, Extruded, Surface, 38 0865 Profiled LF 9,799 $1.73 $16,952.27 Thermoplastic, Extruded, Surface, 39 0865 Non-Profiled LF 41,357 $1.35 $55,831.95 40 0867 Pavement Legend TYPE B-HS: Arrows EA 67 $479.00 $32,093.00 Pavement Legend TYPE B-HS: Bicycle 41 0867 Lane Stencil EA 4 $422.00 $1,688.00 42 0867 Pavement Legend TYPE B-HS: Only EA 14 $620.00 $8,680.00 2026/WO 378 Bid Form -8 Conformed to Bid Documents 43 0867 Pavement Legend Type D: B-HS SQFT 4,628 $13.67 $63,264.76 PERMANENT TRAFFIC CONTROL AND ILLUMINATION SYSTEMS(00900) 44 0905 Remove and Reinstall Existing Signs LS 1 $120,000.00 $225.00 Signs, Standard Sheeting, Extruded 45 0940 Aluminum LS 1 $280,000.00 $203.00 Traffic Signal Modification, Bangy 46 0990 Road at Bonita Road LS 1 $8,122.63 $55,000.00 Traffic Signal Modification, Bangy 47 0990 Road at Meadows Road LS 1 $16,900.00 $52,100.00 Traffic Signal Modification, Kruse Way 48 0990 at Kruse Oaks Drive LS 1 $22,400.00 $22,400.00 Traffic Signal Modification, Kruse Way 49 0990 at Westlake Drive LS 1 $41,400.00 $41,400.00 Traffic Signal Modification, Kruse Way 50 0990 at Carman Drive LS 1 $57,900.00 $57,900.00 RIGHT-OF-WAY DEVELOPMENT AND CONTROL(01000) 51 1095 Bicycle Racks EA 2 $4,480.00 $2,920.00 WATER SUPPLY SYSTEMS(01100) 8 Inch Ductile Iron Pipe with $197.00 $34,475.00 52 1140 Restrained Joints and Class B Backfill LF 175 6 Inch Ductile Iron Pipe with $234.00 $5,616.00 53 1140 Restrained Joints and Class B Backfill LF 24 4 Inch Ductile Iron Pipe with $749.00 $5,400.00 54 1140 Restrained Joints and Class B Backfill LF 20 55 1140 Ductile Iron Pipe Tees, 8 Inch EA 5 $1,320.00 $6,600.00 56 1140 Ductile Iron Pipe Bend, 8 Inch EA 2 $845.00 $1,408.00 57 1140 Ductile Iron Pipe Reducer,4 Inch EA 1 $422.00 $422.00 58 1140 Ductile Iron Pipe Reducer, 6 Inch EA 1 $490.00 $490.00 59 1140 Blowoff Assembly, 2 Inch EA 1 $3,180.00 $3,180.00 Temporary Line Stop with Thrust 60 1140 Straddle Block EA 1 $22,500.00 $22,500.00 8 Inch Connection to Existing 8 Inch 61 1140 Main EA 3 $2,840.00 $8,520.00 62 1150 8 Inch Gate Valve EA 2 $3,040.00 $6,080.00 63 1150 6 Inch Gate Valve EA 1 $2,160.00 $2,160.00 64 1150 4 Inch Gate Valve EA 1 $1,710.00 $1,710.00 65 1150 2 Inch Gate Valve EA 2 $1,030.00 $2,060.00 2026/WO 378 Bid Form -9 Conformed to Bid Documents 66 1160 Hydrant Assemblies EA 2 $4,480.00 $12,840.00 Reconnecting Existing Water Services, 67 1170 1.5 Inch EA 1 $120,000.00 $1,460.00 68 i 1170 1.5 Inch Water Meter Assembly EA 1 $280,000.00 $1,070.00 69 1170 2 Inch Water Meter Assembly EA 1 $8,122.63 $1,070.00 1.5 Inch Water Service Connection 70 1170 Piping LF 15 $268.00 $4,020.00 2 Inch Water Service Connection 71 1170 Piping LF 19 $215.00 $4,085.00 Corrected Bid Total $2,829,720.48 Rid Total S 2,830,220.48 Bid Total (Written Out) Two Million Eight Hundred Thirty Thousand Dollars Two Hundred Twenty Dollars Forty Eight Cents Bid Schedule WO 347—2024 High Priority Ramps Item Spec Description Unit Qty Price Total TEMPORARY FEATURES AND APPURTENANCES(00200) 1 0210 Mobilization LS 1 $16,900.00 $120,000.00 Temporary Work Zone Traffic Control, 2 0221 Complete LS 1 $22,400.00 $63,600.00 Temporary Type Tree Protection 3 0270 Fence LF 200 $9.20 $1,840.00 4 0280 Erosion Control LS 1 $41,400.00 $1,480.00 ROADWORK(00300) 5 0310 Removal of Surfacings SQYD 845 $33.00 $27,885.00 6 0320 Clearing and Grubbing LS 1 $57,900.00 $7,550.00 DRAINAGE AND SEWERS(00400) 7 0470 Concrete Monument Boxes EA 2 $845.00 $2,200.00 8 0490 Adjusting Boxes EA 1 $422.00 $225.00 9 0490 Adjusting Catch Basins EA 7 $1,970.00 $13,790.00 WEARING SURFACES(00700) 10 0744 Level 3, 1/2 Inch ACP Mixture TON 66 $195.00 $12,870.00 11 0759 Concrete Curbs, Curb and Gutter LF 747 $67.40 $50,347.80 12 0759 Concrete Curbs, Grade Correction LF 243 $49.44 $12,013.92 13 0759 Concrete Driveways SQFT 200 $23.58 $4,716.00 2026/WO 378 Bid Form - 10 Conformed to Bid Documents 14 0759 Concrete Walks SQFT 3,314 $21.20 $70,256.80 PERMANENT TRAFFIC SAFETY AND GUIDANCE DEVICES(00800) Thermoplastic, Extruded or Sprayed, 15 0865 Surface, Non-Profiled LF 200 $9'20 $1,920.00 16 0867 Pavement Legend,TYPE B-HS: Arrows EA 1 $120,000.00 $422.00 Pavement Legend,Type B-HS: Bicycle 17 0867 Lane Stencil EA 5 $1,320.00 $2,110.00 18 0867 Pavement Bar TYPE B-HS SQFT 40 $20.80 $832.00 PERMANENT TRAFFIC CONTROL AND ILLUMINATION SYSTEMS(00900) 19 0905 Remove and Reinstall Existing Signs LS 1 $280,000.00 $124.00 Perforated Steel Square Tube Anchor 20 0930 Sign Supports . EA 7 $1,970.00 $9,520.00 RIGHT-OF-WAY DEVELOPMENT AND CONTROL(01000) 21 1070 Mailbox Relocation EA 1 $8,122.63 $1,410.00 Bid Total $ 302,912.52 Bid Total (Written Out) Two Million Eight Hundred Thirty Thousand Dollars Two Hundred Twenty Dollars Forty Eight Cents End Revised 02-04-22 2026/WO 378 Bid Form - 11 PENAL SUM FORM Conformed to Bid Documents BID BOND Any singular reference to Bidder, Surety, Owner, or other party shall be considered plural where applicable. BIDDER (Name and Address): Brix Paving Northwest, Inc. PO Box 2388 Tualatin, OR 97062 SURETY(Name and Address of Principal Place of Business): Old Republic Surety Company PO Box 1635 Milwaukee, WI 53201-1635 OWNER (Name and Address): City of Lake Oswego PO Box 369 Lake Oswego, OR 97034 BID Bid Due Date: 04/21/2026 Project (Brief Description Including Location): Work Order 378 - 2026 - 2030 Pavement Management Program: 2026 Pavement Rehabilitation Projects Lake Oswego, OR BOND Bond Number: Bid Bond Date (Not later than Bid due date): 04/14/2026 Penal sum Ten (10%) Percent of the Total Amount Bid 10%of Bid Amount (Words) (Figures) Surety and Bidder, intending to be legally bound hereby, subject to the terms printed on the reverse side hereof, do each cause this Bid Bond to be duly executed on its behalf by its authorized officer, agent, or representative. \\\\111111111111/1l�! BIDDER SURETY ;°�0oo Sv�FT� igi /oP►ol4r O: Brix Paving Northwest, Inc. Old Republic Surety Company = 1 SEAL Bidder's Name Surety' Name = ,,,, , By: 'f"c-SI 4--- By: .2N) Signatur an e Signature and Title Sandra Stewart, Attorney-In-Fact (Attach Power of Attorney) Attest: Attest: C'1 L 1 SIaiL Signatur d Title Signature and Title Lori D. Andrews, Witness Note: Above addresses are to be used for giving required notice. 2026/WO 378 Bid Bond - 1 PENAL SUM FORM Conformed to Bid Documents 1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, 7. Any suit or action under this Bond shall be successors and assigns to pay to Owner upon default commenced only in a court of competent jurisdiction of Bidder the penal sum set forth on the face of this located in the state in which the Project is located. Bond. Payment of the penal sum is the extent of Surety's liability. 8. Notices required hereunder shall be in writing and sent to Bidder and Surety at their respective addresses 2. Default of Bidder shall occur upon the failure of shown on the face of this Bond. Such notices may be Bidder to deliver within the time required by the sent by personal delivery, commercial courier, or by Bidding Documents (or any extension thereof agreed United States Registered or Certified Mail, return to in writing by Owner) the executed Agreement receipt requested, postage pre-paid, and shall be required by the Bidding Documents and any deemed to be effective upon receipt by the party performance and payment bonds required by the concerned. Bidding Documents. 9. Surety shall cause to be attached to this Bond a 3. This obligation shall be null and void if: current and effective Power of Attorney evidencing 3.1. Owner accepts Bidder's Bid and Bidder the authority of the officer, agent, or representative delivers within the time required by the who executed this Bond on behalf of Surety to Bidding Documents (or any extension execute, seal, and deliver such Bond and bind the thereof agreed to in writing by Owner) the Surety thereby. executed Agreement required by the Bidding Documents and any performance and 10. This Bond is intended to conform to all applicable payment bonds required by the Bidding statutory requirements. Any applicable requirement Documents, or of any applicable statute that has been omitted from 3.2. All Bids are rejected by Owner, or this Bond shall be deemed to be included herein as if 3.3. Owner fails to issue a Notice of Award to set forth at length. If any provision of this Bond Bidder within the time specified in the conflicts with any applicable statute, then the Bidding Documents (or any extension provision of said statute shall govern and the thereof agreed to in writing by Bidder and, if remainder of this Bond that is not in conflict therewith applicable, consented to by Surety when shall continue in full force and effect. required by Paragraph 5 hereof). 11. The term "Bid" as used herein includes a Bid, offer, 4. Payment under this Bond will be due and payable or proposal as applicable. upon default by Bidder and within 30 calendar days after receipt by Bidder and Surety of written notice of default from Owner, which notice will be given with reasonable promptness, identifying this Bond and the Project and including a statement of the amount due. 5. Surety waives notice of any and all defenses based on or arising out of any time extension to issue Notice of Award agreed to in writing by Owner and Bidder, provided that the total time for issuing Notice of Award including extensions shall not in the aggregate exceed 120 days from Bid due date without Surety's written consent. 6. No suit or action shall be commenced under this Bond prior to 30 calendar days after the notice of default required in Paragraph 4 above is received by Bidder and Surety and in no case later than one year after Bid due date. 2026/WO 378 Bid Bond-2 **** * * Conformed to Bid Documents * OLD REPUBLIC SURETI COMPANY *** POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That OLD REPUBLIC SURETY COMPANY,a Wisconsin stock insurance corporation, does make, constitute and appoint: Sandra Stewart, Lon D.Andrews,Jamie L.Armfield, Roxana Palacios, Kristine Santamana. Mamma blatyunin, Eli Biondine of Portland, DR its true and lawful Attorney(s)-in-Fact, with full power and authority for and on behalf of the company as surety. to execute and deliver and affix the seal of the company thereto (if a seal is required), bonds, undertakings. recognizances or other written obligations in the nature thereof, (other than bail bonds, bank depository bonds, mortgage deficiency bonds, mortgage guaranty bonds, guarantees of installment paper and note guaranty bonds, self-insurance workers compensation bonds guaranteeing payment of benefits, or black lung bonds),as follows. ALL WRITTEN INSTRUMENTS and to bind OLD REPUBLIC SURETY COMPANY thereby, and ail of the acts of said Attorneys-in-Fact, pursuant to these presents, are ratified and confirmed. This appointment is made under and by authority of the board of directors at a special meeting neld on February 18, 1982. This Power of Attorney is signed and sealed by facsimile under and by the authority of the following resolutions adopted by the board of directors of the OLD REPUBLIC SURETY COMPANY on February 18,1982. RESOLVED that, the president. any vice-president or assistant vice president. in conjunction with the secretary or any assistant secretary, may appoint attorneys-in-fact or agents with authority as defined or limited in the instrument evidencing the appointment in each case,for and on behalf of the company to execute and deliver and affix the seal of the company to bonds, undertakings, recognizances, and suretyship obiigations of all kinds, and said officers may remove any such attorney-in-fact or agent and revoke any Power of Attorney previously granted to such person RESOLVED FURTHER,that any bond, undertaking, recognizance.or suretyship obligation shall be valid and binding upon the Company (i) when signed by the president,any vice president or assistant vice president,and attested and sealed (if a seal be required)by any secretary or assistant secretary:or (ii) when signed by the president any vice president or assistant vice president, secretary or assistant secretary. and countersigned and sealed (if a seal be required)by a duly authorized attorney-in-fact or agent.or (iii) when duly executed and sealed (if a seal be required) by one or more attorneys-in-fact or agents pursuant to and within the limits of the authority evidenced by the Power of Attomey issued by the company to such person or persons. RESOLVED FURTHER that the signature of any authorized officer and the seal of the company may be affixed by facsimile to any Power of Attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the company: and such signature and seal when so used shall have the same force and effect as though manually affixed. IN WITNESS WHEREOF. OLD REPUBLIC SURETY COMPANY has caused these presents to be signed by its proper officer,and its corporate seai to be affixed this 1st day of July 2025 y�'S�RFI`. OLD REPUBLIC SURETY COMPANY G oft n oOn�rf S_1.1 SEAL 4 /4.,yaa•- .Ass'start Secretary * President STATE OF WISCONSIN,COUNTY OF WAUKESHA-SS On this 1st day of July 2025 ,personally came before me, Alan Pavlic and Kevin J. Abitz ,to me known to be the individuals and officers of the OLD REPUBLIC SURETY COMPANY who executed the above instrument, and they each acknowledged the execution of the same. and being by me duly sworn, did severally depose and say' that they are the said officers of the corporation aforesaid.and that the seal affixed to the above instrument is the seal of the corporation,and that said corporate seal and their signatures as such officers were duly affixed and subscribed to the said instrument by the authority of the board of directors of said corporation. PRI • Q.p ,E0.44,017.1Aq //A . • Boixsovt. ny;..pie 11G Notary PC r YI\b. My Commission Expires. September 28, 2026 CERTIFICATE (Expiration of notary's commission does not invalidate this instrument) I, the undersigned assistant secretary of the OLD REPUBLIC SURETY COMPANY, a Wisconsin corporation. CERTIFY that the foregoing and attached Power of Attorney remains in full force and has not been revoked: and furthermore, that the Resolutions of the board of directors set forth in the Power of Attorney, are now in force. ``G Si1fp, Y 0 c0•M••,, 77 1340 - ; SEAL ►_ Signed and sealed at the City of Brookfield,WI this 1 4th day of April 2026 = ORSC 22262(3-061 Ass.sta Sccrc 410 USI Insurance Services, NW Conformed to Bid Documents FIRST-TIER SUBCONTRACTOR DISCLOSURE FORM (OAR 137-049-0360) Bids which are submitted by Bid Closing, but for which a required disclosure submittal has not been made by the specified Disclosure Deadline, are not responsive and shall not be considered for Contract award AGENCY SUPPLIED INFORMATION: PROJECT NAME: 2026 Pavement Rehabilitation Project WORK ORDER# 378 BID CLOSING: Date 4/21/26 Time: 2:00 DAM 0PM REQUIRED DISCLOSURE DEADLINE: Date: 4/21/26 Time: 4:00 DAM OPM Deliver Form to(Agency) City of Lake Oswego(via bid submittal link) Designated Recipient(Person): Stefan Broadus Phone#: 503-635-0267 Agency's Address: 380 A Avenue, P.O. Box 369 Lake Oswego,Oregon 97034 INSTRUCTIONS: If the contracting agency's estimate of contract value or Bidder's Bid is greater than$100,000,this form must be submitted. This form must be submitted either with the bid or within two (2)working hours after the advertised bid closing date and time; but no later than the DISCLOSURE DEADLINE stated above. Unless otherwise stated in the solicitation,this document shall not be submitted by facsimile. It is the responsibility of bidders to submit this disclosure form and any additional sheets,with the bid number and project name clearly marked,at the location indicated by the specified disclosure deadline. List below the Name,Category of Work and Dollar Value for each first-tier subcontractor that would be furnishing labor,or labor and material,for which disclosure is required. Enter the word "NONE" if there are no first-tier subcontractors subject to disclosure. ATTACH ADDITIONAL SHEETS IF NECESSARY. BIDDER DISCLOSURE: SUBCONTRACTOR NAME CATEGORY OF WORK DOLLAR VALUE 1 Roger Langeliers Concrete Work $334, 124 . 00 2. Turney Excavation Excavation $459, 120 . 25 3. D&H Flagging, INC Traffic Control $155, 000 . 00 4. Aaken Corporation Electrical $218, 505 . 00 5 SPM Stripe $167, 229 . 21 6. Robotics Survey $15, 000 . 00 The above listed first-tier subcontractor(s)are providing labor,or labor and material,with a Dollar Value equal to or greater than: a) 5%of the total Contract Price, but at least$15,000. [If the Dollar Value is less than $15,000 do not list the subcontractor above.] or b) $350,000 regardless of the percentage of the total Contract Price. Form Submitted By(Bidder Name): Brix Paving Northwest Inc Contact Name: Austin Cooksey Phone#: 503-341-4508 2026/WO 378 First Tier Disclosure Form - 1 Conformed to Bid Documents GFE PROGRAM: FORM 1 SUBCONTRACTOR AND SELF-PERFORM LIST Bidder Name: Brix Paving Northwest, INC City Project#/ Name: WO# 378 _ 2026 Pavement Rehabilitation Project Bidders must identify all Divisions of Work (DOWs)to be self-performed and subcontracted. DOWs not self-performed are subject to the GFE Program requirements. Before submitting, check to ensure all listed DOWs for this project appear in at least one of the two tables below. NOTE: DOWs that will not be self-performed will be itemized on the next page. DIVISIONS OF WORK TO BE SELF-PERFORMED (GFE NOT REQUIRED) Asphalt Paving Asphalt Grinding Saw Cutting Erosion Control Conformed to Bid Documents GFE PROGRAM: FORM 1 (CONTINUED) DIVISIONS OF WORK NOT TO BE SELF-PERFORMED (List ALL subcontractors—COBID certified and non-certified) ALL SUBCONTRACTORS DIVISIONS OF WORK DOLLAR VALUE OF COBID CERTIFIED? (Use the Subcontractor's complete legal name) (Provide Description) SUBCONTRACT LIST ALL CERTIFICATIONS* (ESB,MBE,WBE,SDV,DBE,ACDBE) Name Roger Langeliers $334,124.00 COBID certified: Yes 0 No O Address 7145 NE Progress Ct Concrete Ramps Certifications: City/St/Zip Hillsboro, OR 97124 Phone 503 . 570 . 9355 CCB# 106364 $459,120.25 Name Turney Excavation Yes O Noified0 Address PO Box 21597 Certifications: City/St/Zip Keizer, OR 97307 Excavation Phone 503-856-1207 CCB# 214481 INC Flagging/Traffic Control $155,000.00 COBID certified: Name D&H Flagging, Yes OX No O Address 1621SE Paradee St Certifications: City/St/Zip Portland, OR 97202-4733 DBE / WBE Phone 503-232-2488 CCB# 216371 * ESB:Emerging Small Business;MBE: Minority-owned Business;WBE: Women-owned Business;SDV:Service-Disabled Veteran-Owned Business;DBE or ACDBE: Disadvantaged Business Enterprise List Continued on Next Page? Yes 0 No 0 Number of Additional Pages? 2 Conformed to Bid Documents GFE PROGRAM: FORM 1 (CONTINUED) DIVISIONS OF WORK NOT TO BE SELF-PERFORMED (List ALL subcontractors—COBID certified and non-certified) ALL SUBCONTRACTORS DIVISIONS OF WORK DOLLAR VALUE OF COBID CERTIFIED? (Use the Subcontractor's complete legal name) (Provide Description) SUBCONTRACT LIST ALL CERTIFICATIONS* (ESB,MBE,WBE,SDV,DBE,ACDBE) Name $334,124.00 COBID certified: Yes No O Address Certifications: City/St/Zip Phone CCB# Name $459,120.25 COBID certified: Yes No X Address Certifications: City/St/Zip Phone CCB# Name D&H Flagging, INC Flagging/Traffic Control $155,000.00 COBID certified: gg g, Yes No X Address 1621SE Paradee St Certifications: City/St/Zip Portland, OR 97202-4733 Phone 503-232-2488 CCB# 216371 * ESB:Emerging Small Business;MBE: Minority-owned Business;WBE: Women-owned Business;SDV:Service-Disabled Veteran-Owned Business;DBE or ACDBE: Disadvantaged Business Enterprise List Continued on Next Page? Yes 0 No 0 Conformed to Bid Documents GFE PROGRAM: FORM 1 (CONTINUED) DIVISIONS OF WORK NOT TO BE SELF-PERFORMED (List ALL subcontractors—COBID certified and non-certified) ALL SUBCONTRACTORS DIVISIONS OF WORK DOLLAR VALUE OF COBID CERTIFIED? (Use the Subcontractor's complete legal name) (Provide Description) SUBCONTRACT LIST ALL CERTIFICATIONS* (ESB,MBE,WBE,SDV,DBE,ACDBE) Name $334,124.00 COBID certified: Yes O No O Address Certifications: City/St/Zip Phone CCB# Name $459,120.25 COBID certified: Yes O No O Address Certifications: City/St/Zip Phone CCB# Flagging/Traffic Control $155,000.00 COBID certified: Name D&H Flagging, INC Yes O No 0 Address 1621SE Paradee St Certifications: City/St/Zip Portland, OR 97202-4733 Phone 503-232-2488 CCB# 216371 * ESB:Emerging Small Business;MBE: Minority-owned Business;WBE: Women-owned Business;SDV:Service-Disabled Veteran-Owned Business;DBE or ACDBE: Disadvantaged Business Enterprise List Continued on Next Page? Yes 0 No 0 Conformed to Bid Documents GFE PROGRAM: FORM 2 COBID SUBCONTRACTOR CONTACT & BIDS RECEIVED LOG Bidder Name: Brix Paving Northwest, INC Date: 4/13 b i1/2026 City Project#/ Name: WO# 78 - 2026 Pavement Rehabilitation Project Contact Person: Austin Cooksey DIVISIONS OF BID ACTIVITY REJECTED BIDS COBID CERTIFIED DATE CONTACT NAME& WORK (YES NO) SUBCONTRACTOR SOLICITATION DATE OF CONTACT PROVIDE WILL BID BID BID REASON NOT USED BUSINESS NAME WAS SENT DESCRIPTION* BID REC'D USED AMOUNT (If"Other,"please explain) x $79.50 per Price Scope,just A+ Flagging Chris - 4/10/26 Flagging 4/10/2026 x hour Scope quoted flagging Other Price HLigh CQualityTrafficControl Shelly - 4/10/26 Flagging 4/10/2026 x x $74 per hour Scope Scope,just quotec Other x x $155,000.00 Price x D & H Flagging, Inc. Randy - 4/10/26 Flagging / 4/10/2026 Scope Traffic Control Other Price All-Ways Aaron - 4/10/26 Excavation 4/10/2026 N/A Scope NO Bid Excavation Other Elk Horn 4/10/2026 Price Shani - 4/10/2026 Excavation No Answer N/A Scope No Bid Received Construction Left Voicemail Other Advanced Tribal N/A Price No Bid Received Leon - 4/10/2026 Excavation 4/10/2026 x Scope LLC Other 0'Bunco 4/10/2026 Price Engineering Sam - 4/10/2026 Survey No Answer N/A Scope No Bid Received Left Voicemail Other PTS Surveying Price Tyler - 4/10/2026 Survey 4/10/2026 x N/A scope No Bid Received INC Other N/A Price No Bid Received Recorp, LLC Justin - 4/10/2026 Survey 4/10/2026 x Scope Other *When possible,subcontractors contacted for the same or similar DOW should be grouped together. *No Qualified electrician' s on COBID' s website for this scope of work *No Qualified Stripe Contractors on COBID' s website for this scope of work Conformed to Bid Documents GFE PROGRAM: FORM 2 COBID SUBCONTRACTOR CONTACT & BIDS RECEIVED LOG Bidder Name: Brix Paving Northwest, INC Date: 4/0-42,62:61/2026 City Project#/ Name: WO#378 - 2026 Pavement Rehabilitation Project Contact Person: Austin Cooksey DIVISIONS OF BID ACTIVITY REJECTED BIDS COBID CERTIFIED DATE CONTACT NAME& WORK (YES NO) SUBCONTRACTOR SOLICITATION DATE OF CONTACT PROVIDE WILL BID BID BID REASON NOT USED BUSINESS NAME WAS SENT DESCRIPTION* BID REC'D USED AMOUNT (If"Other,"please explain) Price Civil West Arnold — 4/10/26 Concrete 4/10/2026 x $79.50 per Not hour Scope Construction Other Bidding Faison Price Not Construction James - 4/10/2026 Concrete 4/10/2026 $74 per hour Scope Bidding other C&L Price Noemi - 4/10/2026 Concrete 4/10/2026 $155,000.00 Scope Not Innovations Other Bidding Cartello Construction, Tara-4/10/2026 Signs 4/10/2026 X Price N/A Scope Scope,just INC Other quoted flagging Price Gageit Construction Brian-4/10/2026 Signs 4/10/2026 N/A Scope Scope,just quote Other Coral Sales Company Rachel-4/10/2026 Supplying Sign 4/10/2026 x x N/A Price Materials Scope Other Price N/A Scope Other Price N/A Scope No Bid Received Other N/A Price No Bid Received Scope Other *When possible,subcontractors contacted for the same or similar DOW should be grouped together. *No Qualified electrician' s on COBID' s website for this scope of work *No Qualified Stripe Contractors on COBID' s website for this scope of work Conformed to Bid Documents To Whom It May Concern, Brix Paving Northwest is soliciting bids from qualified subcontractors and suppliers for the following project: Project: City of Lake Oswego 2026 Pavement Rehabilitation Project No.:WO 378/WO 347 Bid Date: 04/21/2026 @ 2:00 PM Location: Lake Oswego, Oregon Work scopes may include, but are not limited to: traffic control, excavation, stripe, survey. We encourage all interested DBE, MBE,WBE, and ESB firms to respond. Plans and specifications are available through the City of Lake Oswego or upon request. Please submit your quote to: Brix Paving Northwest Attn: Austin Cooksey Phone: 503-341-4508 Email: acooksey@brixpaving.com Quotes needed by: 04/20/2026 131R1 PAVING NORTHWEST. INC. Conformed to Bid Documents CONTRACT BOOKLET Conformed to Bid Documents lA F� CITY OF LAKE OSWEGO sn` PUBLIC WORKS/ PUBLIC IMPROVEMENT/ V �— O SERVICE CONTRACT FOR PUBLIC IMPROVEMENT (Greater than $50,000/with General and Supplementary Conditions) Contractor: Brix Paving Northwest, Inc. Date of Contract: May 19, 2026 Mailing PO Box 2388 Date of Substantial September 26, 2026 Address: Tualatin, OR 97062 Completion: Date of Final Completion October 16,2026 Work: _ WO 378 Contract Amount: $3,132,633.00 Project: 2026 Pavement Rehabilitation Engineer(if applicable) Consor North Project America, Inc. &Wallis Engineering PLLC WITNESSETH: Contractor and the City of Lake Oswego, a municipal corporation, ("Owner") mutually covenant and agree to and with each other as follows: 1. WORK/ PROJECT 1.1 General Description of Work. The Work is generally described as follows: The scope of work consists of pavement rehabilitation on various streets within Lake Oswego as well as major upgrades to the existing signalization at five (5) intersections: Kruse Way and Carman Drive, Kruse Way and Westlake Drive, Kruse Way and Kruse Oaks Drive, Bangy Road and Meadows Road, as well as Bangy Road and Bonita Road. These improvements will bring these signalized intersections into current industry standards for detection. This project will also construct about 60 curb ramps bringing them into compliance with current Americans with Disabilities Act (ADA) requirements. Most of these are located at the intersections within the paving limits. Work will consist of: 1. Temporary signage for pedestrian and traffic control 2. Replacement of several stormwater catch basins 3. Removal of asphalt concrete (grinding) 4. Construction of asphaltic concrete pavement inlays and overlays 5. Installation of pavement markings 6. Installation and replacement of some water lines 7. Performance of additional and incidental work as called for by the specifications and plans. Page 1— PUBLIC WORKS CONTRACT—WO 378 Conformed to Bid Documents See Bid Form, Contact Plans, and Specifications for all work. The Work is part of the above named "Project", if stated above. 1.2 Project. The project for which the Work under the Contract Documents may be a part is referenced above. 2. CLASSIFICATION OF WORK/CONTRACT DOCUMENTS 2.1 Classification of Work. This Work is classified as: Applicable Classification Description of Classification classification(s) Public Work Construction-includes the initial building of structures and roads. X Reconstruction-includes the restoration of existing buildings and the restoration,rebuilding or resurfacing of existing roads(includes (Note: Public Work and emergency work). Public Improvement are Major Renovation-includes any remodeling or alteration of not mutually exclusive; existing structures or roads(includes emergency work). a public impvt contract Painting of structure or building. is frequently also a General Maintenance/Demolition—Only if part of construction or public works contract). major renovation project Public Improvement Construction,reconstruction or major renovation on real property, X not including emergency work, or ordinary repair or maintenance necessary to preserve a public improvement. Service Contract Relating General Maintenance necessary to preserve a public improvement to Public Improvement (not part of construction or renovation). Project Demolition—Only if not part of construction or renovation). 2.2 Contract Documents. See General Conditions 00110.20 and 00150.10 for listing of Contract Documents and the order of precedence for resolving discrepancies among the documents. Note: Submittals reviewed pursuant to subsection 00150.35 of the General Conditions and Reference Documents, if any, referred to in the Special Provisions are not Contract Documents. 3. CONTRACT TIMES/ LIQUIDATED DAMAGES 3.1 Dates of Substantial and Final Completion. The Work will be substantially completed on or before the Date of Substantial Completion stated above, and completed and ready for final payment in accordance with subsection 00195.90 of the General Conditions on or before the Date of Final Completion stated above. 3.2 Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the essence of this Contract and OWNER will suffer financial loss if the Work is not completed within the times specified above, plus any extensions thereof allowed in accordance with Section 00180 of the General Conditions. They also recognize the delays, expense and difficulties involved in proving the actual loss suffered by OWNER if the Work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages Page 2— PUBLIC WORKS CONTRACT—WO 378 Conformed to Bid Documents for delay (but not as a penalty) CONTRACTOR shall pay OWNER Five Hundred Dollars ($500/calendar day.)for each day that expires after the time specified for Substantial Completion until the Work is substantially complete. After Substantial Completion, if CONTRACTOR shall neglect, refuse or fail to complete the remaining Work within the time specified for completion and readiness for final payment or any proper extension thereof granted by OWNER, CONTRACTOR shall pay OWNER Fifteen Hundred Dollars ($1500 Calendar/day.) for each day that expires after the time specified for Final Completion. 4. CONTRACT AMOUNT. No payment shall be due to the Contractor until the Contractor has completed and submitted to the City's Finance Department the IRS Form W-9 Request for Taxpayer Identification and Certification (http://www.irs.gov/pub/irs-pdf/fw9.pdf). The City prefers to pay contractors by electronic fund transfer;the contractor may submit the EFT agreement (http://tinyurl.com/LO-EFT)to the City's Finance Department. OWNER agrees to pay, and CONTRACTOR agrees to accept, in full payment for completion of the Work in accordance with the Contract Documents, the Contract Amount stated above, as defined in subsection 00110.20 of the General Conditions; provided however, estimated quantities are not guaranteed, and determinations of actual quantities and classification are to be made by ENGINEER named above, if applicable, or Owner's Project Manager, as provided in subsection 00195.50 of the General Conditions. Unit prices have been computed as provided in subsection 00195.00 of the General Conditions. 5. WORKERS COMPENSATION INSURANCE: Per GC 00170.70(d), the Contractor certifies to the City that it is complying with ORS 656.017 and the requirements for Worker's Compensation Insurance as follows: Initial One Representation to City Insurance Obtained (submit Certificate of Insurance) Self-Insured Employer (submit evidence of compliance with Worker Compensation Division requirements) Exempt Employer — contractor does not employ any persons that would require contractor to provide workers compensation insurance benefits Independent Contractor—no employees ////Signatures on next page Page 3— PUBLIC WORKS CONTRACT—WO 378 Conformed to Bid Documents BRIX PAVING NORTHWEST, INC. CITY OF LAKE OSWEGO By: Name: Lynn Peterson, City Manager pro tern Title: Date: Date: Public Contracting Officer 380 A Avenue Check one: P.O. Box 369 Sole Proprietor Lake Oswego, OR 97034 Partnership Corporation X Limited Liability Company Date Authorized by Council, if applicable: Limited Liability Partnership May 19, 2026. Other: Domicile, if other than Oregon: APPROVED AS TO FORM: Ver.1412 City Attorney's Office Page 4— PUBLIC WORKS CONTRACT—WO 378 Conformed to Bid Documents PERFORMANCE BOND Any singular reference to Contractor,Surety, Owner, or other party shall be considered plural where applicable. CONTRACTOR (Name and Address): SURETY(Name and Address of Principal Place of Business): OWNER(Name and Address): City of Lake Oswego PO Box 369 Lake Oswego,OR 97034 CONTRACT Date: Amount: Description (Name and Location): BOND Bond Number: Date (Not earlier than Contract Date): Amount: Modifications to this Bond Form: Surety and Contractor, intending to be legally bound hereby, subject to the terms printed on the reverse side hereof, do each cause this Performance Bond to be duly executed on its behalf by its authorized officer, agent, or representative. CONTRACTOR AS PRINCIPAL SURETY Company: Signature: Name and Title: Surety's Name By: Signature and Title (Attach Power of Attorney) Attest: (Space is provided below for signatures of additional Signature and Title parties, if required.) CONTRACTOR AS PRINCIPAL SURETY Company: Signature: Name and Title: Surety's Name By: Signature and Title (Attach Power of Attorney) Attest: Signature and Title: 2026/WO 378 Performance Bond - 1 Conformed to Bid Documents 1. Contractor and Surety, jointly and severally, bind 4.3. Obtain bids or negotiated proposals from qualified themselves, their heirs, executors, administrators, contractors acceptable to Owner for a contract for successors, and assigns to Owner for the performance of performance and completion of the Contract, the Contract, which is incorporated herein by reference. arrange for a contract to be prepared for execution by Owner and Contractor selected with Owner's 2. If Contractor performs the Contract, Surety and concurrence, to be secured with performance and Contractor have no obligation under this Bond, except to payment bonds executed by a qualified surety participate in conferences as provided in Paragraph 3.1. equivalent to the bonds issued on the Contract, and pay to Owner the amount of damages as 3. If there is no Owner Default, Surety's obligation under described in Paragraph 6 in excess of the Balance this Bond shall arise after: of the Contract Price incurred by Owner resulting from Contractor Default; or 3.1. Owner has notified Contractor and Surety, at the addresses described in Paragraph 10 below, that 4.4. Waive its right to perform and complete, arrange Owner is considering declaring a Contractor for completion, or obtain a new contractor and Default and has requested and attempted to with reasonable promptness under the arrange a conference with Contractor and Surety circumstances: to be held not later than 10 days after receipt of such notice to discuss methods of performing the 1.After investigation, determine the amount for Contract. If Owner, Contractor and Surety agree, which it may be liable to Owner and, as soon as Contractor shall be allowed a reasonable time to practicable after the amount is determined, perform the Contract, but such an agreement shall tender payment therefor to Owner; or not waive Owner's right, if any, subsequently to declare a Contractor Default; and 2.Deny liability in whole or in part and notify Owner citing reasons therefor. 3.2. Owner has declared a Contractor Default and formally terminated Contractor's right to complete 5. If Surety does not proceed as provided in Paragraph 4 the Contract. Such Contractor Default shall not be with reasonable promptness,Surety shall be deemed to be declared earlier than 20 days after Contractor and in default on this Bond 15 days after receipt of an Surety have received notice as provided in additional written notice from Owner to Surety demanding Paragraph 3.1; and that Surety perform its obligations under this Bond, and Owner shall be entitled to enforce any remedy available to 3.3. Owner has agreed to pay the Balance of the Owner. If Surety proceeds as provided in Paragraph 4.4, Contract Price to: and Owner refuses the payment tendered or Surety has denied liability, in whole or in 1. Surety in accordance with the terms of the part, without further notice Owner shall be entitled to Contract; enforce any remedy available to Owner. 2.Another contractor selected pursuant to 6. After Owner has terminated Contractor's right to Paragraph 4.3 to perform the Contract. complete the Contract, and if Surety elects to act under Paragraph 4.1, 4.2, or 4.3 above, then the responsibilities 4. When Owner has satisfied the conditions of Paragraph of Surety to Owner shall not be greater than those of 3, Surety shall promptly and at Surety's expense take one Contractor under the Contract, and the responsibilities of of the following actions: Owner to Surety shall not be greater than those of Owner under the Contract. To a limit of the amount of this Bond, 4.1. Arrange for Contractor, with consent of Owner,to but subject to commitment by Owner of the Balance of the perform and complete the Contract; or Contract Price to mitigation of costs and damages on the Contract, Surety is obligated without duplication for: 4.2. Undertake to perform and complete the Contract itself, through its agents or through independent 6.1. The responsibilities of Contractor for correction of contractors; or defective Work and completion of the Contract; 2026/WO 378 Performance Bond -2 Conformed to Bid Documents 6.2. Additional legal, design professional, and delay 11. When this Bond has been furnished to comply with a costs resulting from Contractor's Default, and statutory requirement in the location where the Contract resulting from the actions or failure to act of Surety was to be performed, any provision in this Bond conflicting under Paragraph 4; and with said statutory requirement shall be deemed deleted herefrom and provisions conforming to such statutory 6.3. Liquidated damages, or if no liquidated damages requirement shall be deemed incorporated herein. The are specified in the Contract, actual damages intent is that this Bond shall be construed as a statutory caused by delayed performance or non- bond and not as a common law bond. performance of Contractor. 12. Definitions. 7. Surety shall not be liable to Owner or others for obligations of Contractor that are unrelated to the 12.1 Balance of the Contract Price: The total amount Contract, and the Balance of the Contract Price shall not be payable by Owner to Contractor under the reduced or set off on account of any such unrelated Contract after all proper adjustments have been obligations. No right of action shall accrue on this Bond to made, including allowance to Contractor of any any person or entity other than Owner or its heirs, amounts received or to be received by Owner in executors, administrators, or successors. settlement of insurance or other Claims for damages to which Contractor is entitled, reduced 8. Surety hereby waives notice of any change, including by all valid and proper payments made to or on changes of time, to Contract or to related subcontracts, behalf of Contractor under the Contract. purchase orders, and other obligations. 12.2.Contract: The agreement between Owner and 9. Any proceeding, legal or equitable, under this Bond may Contractor identified on the signature page, be instituted in any court of competent jurisdiction in the including all Contract Documents and changes location in which the Work or part of the Work is located thereto. and shall be instituted within two years after Contractor Default or within two years after Contractor ceased 12.3.Contractor Default: Failure of Contractor, which working or within two years after Surety refuses or fails to has neither been remedied nor waived,to perform perform its obligations under this Bond, whichever occurs or otherwise to comply with the terms of the first. If the provisions of this paragraph are void or Contract. prohibited by law, the minimum period of limitation available to sureties as a defense in the jurisdiction of the 12.4.Owner Default: Failure of Owner, which has suit shall be applicable. neither been remedied nor waived, to pay Contractor as required by the Contract or to 10. Notice to Surety, Owner, or Contractor shall be mailed perform and complete or comply with the other or delivered to the address shown on the signature page. terms thereof. FOR INFORMATION ONLY—Name,Address and Telephone Surety Agency or Broker Owner's Representative (engineer or other party) 2026/WO 378 Performance Bond -3 Conformed to Bid Documents PAYMENT BOND Any singular reference to Contractor,Surety, Owner, or other party shall be considered plural where applicable. CONTRACTOR (Name and Address): SURETY(Name and Address of Principal Place of Business): OWNER(Name and Address): CONTRACT Date: Amount: Description (Name and Location): BOND Bond Number: Date (Not earlier than Contract Date): Amount: Modifications to this Bond Form: Surety and Contractor, intending to be legally bound hereby, subject to the terms printed on the reverse side hereof, do each cause this Payment Bond to be duly executed on its behalf by its authorized officer, agent, or representative. CONTRACTOR AS PRINCIPAL SURETY Company: Signature: Name and Title: Surety's Name By: Signature and Title (Attach Power of Attorney) Attest: (Space is provided below for signatures of additional Signature and Title parties, if required.) CONTRACTOR AS PRINCIPAL SURETY Company: Signature: Name and Title: Surety's Name By: Signature and Title (Attach Power of Attorney) Attest: Signature and Title: 2026/WO 378 Payment Bond - 1 Conformed to Bid Documents 1. Contractor and Surety, jointly and severally, bind 2. Have either received a rejection in whole or in themselves, their heirs, executors, administrators, part from Contractor, or not received within 30 successors, and assigns to Owner to pay for labor, days of furnishing the above notice any materials,and equipment furnished by Claimants for use in communication from Contractor by which the performance of the Contract, which is incorporated Contractor had indicated the claim will be paid herein by reference. directly or indirectly; and 2. With respect to Owner,this obligation shall be null and 3. Not having been paid within the above 30 days, void if Contractor: have sent a written notice to Surety and sent a 2.1. Promptly makes payment, directly or indirectly, for copy, or notice thereof, to Owner, stating that a all sums due Claimants, and claim is being made under this Bond and enclosing a copy of the previous written notice 2.2. Defends, indemnifies, and holds harmless Owner furnished to Contractor. from all claims, demands, liens, or suits alleging non-payment by Contractor by any person or entity 5. If a notice by a Claimant required by Paragraph 4 is who furnished labor, materials, or equipment for provided by Owner to Contractor or to Surety, that is use in the performance of the Contract, provided sufficient compliance. Owner has promptly notified Contractor and Surety (at the addresses described in Paragraph 12) of any 6. When a Claimant has satisfied the conditions of claims, demands, liens, or suits and tendered Paragraph 4, the Surety shall promptly and at Surety's defense of such claims, demands, liens, or suits to expense take the following actions: Contractor and Surety, and provided there is no Owner Default. 6.1. Send an answer to that Claimant, with a copy to Owner, within 45 days after receipt of the claim, 3. With respect to Claimants, this obligation shall be null stating the amounts that are undisputed and the and void if Contractor promptly makes payment, directly basis for challenging any amounts that are disputed. or indirectly, for all sums due. 6.2. Pay or arrange for payment of any undisputed 4. Surety shall have no obligation to Claimants under this amounts. Bond until: 7. Surety's total obligation shall not exceed the amount of 4.1. Claimants who are employed by or have a direct this Bond, and the amount of this Bond shall be credited contract with Contractor have given notice to Surety for any payments made in good faith by Surety. (at the addresses described in Paragraph 12) and sent a copy,or notice thereof,to Owner,stating that 8. Amounts owed by Owner to Contractor under the a claim is being made under this Bond and, with Contract shall be used for the performance of the Contract substantial accuracy,the amount of the claim. and to satisfy claims, if any, under any performance bond. By Contractor furnishing and Owner accepting this Bond, 4.2. Claimants who do not have a direct contract with they agree that all funds earned by Contractor in the Contractor: performance of the Contract are dedicated to satisfy obligations of Contractor and Surety under this Bond, 1.Have furnished written notice to Contractor and subject to Owner's priority to use the funds for the sent a copy, or notice thereof, to Owner, within completion of the Work. 90 days after having last performed labor or last furnished materials or equipment included in the 9. Surety shall not be liable to Owner, Claimants, or others claim stating, with substantial accuracy, the for obligations of Contractor that are unrelated to the amount of the claim and the name of the party to Contract. Owner shall not be liable for payment of any whom the materials or equipment were furnished costs or expenses of any Claimant under this Bond, and or supplied, or for whom the labor was done or shall have under this Bond no obligations to make performed; and payments to, give notices on behalf of, or otherwise have obligations to Claimants under this Bond. 2026/WO 378 Payment Bond -2 Conformed to Bid Documents 14. Upon request of any person or entity appearing to be 10. Surety hereby waives notice of any change, including a potential beneficiary of this Bond, Contractor shall changes of time,to the Contract or to related Subcontracts, promptly furnish a copy of this Bond or shall permit a copy purchase orders and other obligations. to be made. 11. No suit or action shall be commenced by a Claimant 15. DEFINITIONS under this Bond other than in a court of competent jurisdiction in the location in which the Work or part of the 15.1. Claimant: An individual or entity having a direct Work is located or after the expiration of one year from the contract with Contractor, or with a first-tier date (1) on which the Claimant gave the notice required by subcontractor of Contractor, to furnish labor, Paragraph 4.1 or Paragraph 4.2.3, or (2) on which the last materials, or equipment for use in the performance labor or service was performed by anyone or the last of the Contract. The intent of this Bond shall be to materials or equipment were furnished by anyone under include without limitation in the terms "labor, the Construction Contract, whichever of (1) or (2) first materials or equipment" that part of water, gas, occurs. If the provisions of this paragraph are void or power, light, heat, oil, gasoline, telephone service, prohibited by law, the minimum period of limitation or rental equipment used in the Contract, available to sureties as a defense in the jurisdiction of the architectural and engineering services required for suit shall be applicable. performance of the Work of Contractor and Contractor's Subcontractors, and all other items for 12. Notice to Surety, Owner, or Contractor shall be mailed which a mechanic's lien may be asserted in the or delivered to the addresses shown on the signature page. jurisdiction where the labor, materials, or Actual receipt of notice by Surety, Owner, or Contractor, equipment were furnished. however accomplished,shall be sufficient compliance as of the date received at the address shown on the signature 15.2. Contract: The agreement between Owner and page. Contractor identified on the signature page, including all Contract Documents and changes 13. When this Bond has been furnished to comply with a thereto. statutory requirement in the location where the Contract was to be performed, any provision in this Bond conflicting 15.3. Owner Default: Failure of Owner, which has with said statutory requirement shall be deemed deleted neither been remedied nor waived, to pay herefrom and provisions conforming to such statutory Contractor as required by the Contract or to requirement shall be deemed incorporated herein. The perform and complete or comply with the other intent is that this Bond shall be construed as a statutory terms thereof.. Bond and not as a common law bond. FOR INFORMATION ONLY—Name,Address and Telephone Surety Agency or Broker: Owner's Representative (engineer or other party): 2026/WO 378 Payment Bond -3 PREVAILING WAGE RATES The applicable prevailing wage rates for this project are those established by BOLT effective as of January 5, 2026, including amendments thereto effective prior to the initial publication date of the Invitation for Bids. The applicable apprenticeship rates for this project are those established by BOLT effective February 18, 2026, including any amendments thereto effective prior to the initial publication date of the Invitation for Bids The web address for BOLT is https://www.oregon.gov/boli/employers/Pages/prevailing-wage- rates.aspx. Revised 04-29-26 2026-WO 378 Prevailing Wage Rates- 1 Conformed to Bid Documents CONDITIONS OF THE CONTRACT Conformed to Bid Documents General Conditions for Construction for the City of Lake Oswego (based on the 2024 Oregon Standard Specifications for Construction) TABLE OF CONTENTS [2022-COBID added] PART 00100 -GENERAL CONDITIONS Section 00110 -Organization, Conventions,Abbreviations,and Definitions 00110.00 Organization of Specifications 5 00110.05 Conventions Used Throughout the Specifications Include 5 00110.10 Abbreviations 6 00110.20 Definitions 10 Section 00120 -Bidding Requirements and Procedures 20 00120.01 Receipt of Bids; Opening 20 00120.02 Prequalification of Bidders 20 00120.03 Request for Solicitation Documents 20 00120.04 Pre-Bid Meeting 20 00120.10 Bid Booklet 20 00120.15 Examination of Work Site and Solicitation Documents; Consideration of Conditions to be Encountered 21 00120.16 Material, Equipment, and Method Substitutions 21 00120.17 Use of Agency-Owned Land for Staging or Storage Areas 22 00120.20 Interpretation of Quantities in Bid Schedule 22 00120.25 Subsurface Investigations 23 00120.40 Preparation of Bids 23 00120.45 Submittal of Bids 25 00120.60 Modification or Withdrawal of Bids 26 00120.65 Opening and Comparing Bids 26 00120.70 Rejection of Nonresponsive Bids 26 00120.80 Reciprocal Preference for Oregon Resident Bidders 27 00120.90 Disqualification of Bidders 28 Section 00125-Good Faith Effort Equity Contracting Program 29 00125.00 Program Description 29 00125.10 Pre-Bid Requirements 29 00125.20 General Bid Requirements 30 00125.30 Delivery Method 31 00125.40 Subcontractor Changes 31 00125.50 Audit 31 00125.60 Enforcement 31 Section 00130 -Award and Execution of Contract 00130.00 Consideration of Bids 33 00130.12 Subcontractor or Supplier Identification 34 00130.15 Right to Protest Award 35 00130.20 Cancellation of Award 35 00130.30 Contract Booklet 35 00130.40 Contract Submittals 35 00130.50 Execution of Contract and Bonds 36 00130.50 Execution of Contract and Bonds 36 TOC- 1 General Conditions Revised 01/27/2026 Conformed to Bid Documents 00130.60 Failure to Execute Contract and Bonds 37 00130.70 Release of Bid Guaranties 37 00130.80 Project Site Restrictions 37 00130.85 Lake Oswego Business License 37 00130.90 Notice to Proceed 37 Section 00140 -Scope of Work 00140.00 Purpose of Contract 38 00140.10 Typical Sections 38 00140.20 Thickness 38 00140.30 Agency-Required Changes in the Work 38 00140.40 Differing Site Conditions 39 00140.50 Environmental Pollution Changes 39 00140.60 Extra Work 39 00140.65 Disputed Work 39 00140.70 Cost Reduction Proposals 39 00140.80 Use of Publicly Owned Equipment 41 00140.90 Final Trimming and Cleanup 41 00140.95"AS-BUILT" Drawings 41 00150.00 Authority of the Engineer 43 00150.02 Inspector's Authority and Duties 43 00150.10 Coordination of Contract Documents 44 00150.15 Construction Stakes, Lines, and Grades 44 00150.25 Acceptability of Materials and Work 46 00150.30 Delivery of Notices 46 00150.35 Submittals 48 00150.37 Equipment Lists and Other Submittals 52 00150.53 Utilities and Existing Improvements 55 00150.55 Cooperation with Other Contractors 56 00150.70 Detrimental Operations 57 00150.75 Protection and Maintenance of Work During Construction 58 00150.80 Removal of Unacceptable and Unauthorized Work 58 00150.91 Post-Construction Review 59 00150.95 Final Acceptance 59 00150.96 Maintenance Warranties and Guarantees 59 00150.97 Responsibility for Materials and Workmanship 59 Section 00160 -Source of Materials 00160.00 Definitions 59 00160.05 Qualified Products List(QPL) 60 00160.10 Ordering, Producing, and Furnishing Materials 61 00160.20 Preferences for Materials 61 00160.50 Agency-Controlled Land; Limitations and Requirements 64 00160.70 Requirements for Plant Operations 65 00160.80 Requirements for Sources of Borrow and Aggregate 65 00165.00 General 67 00165.01 Rejected Materials 67 00165.03 Testing by Agency 67 00165.04 Costs of Testing 67 00165.10 Materials Acceptance Guides 67 00165.20 Materials Specifications and Test Method References 68 00165.30 Field-Tested Materials 68 00165.70 Use of Materials without Engineer's Acceptance 70 00165.75 Storage and Handling of Materials 70 00165.80 Measurement 70 00165.90 Incidental Basis 71 TOC-2 General Conditions Revised 01/27/2026 Conformed to Bid Documents Section 00170 -Legal Relations and Responsibilities 00170.00 General 72 00170.01 Other Agencies Affecting Agency Contracts 73 00170.02 Permits, Licenses, and Taxes 75 00170.03 Furnishing Right-of-Way and Permits 75 00170.04 Patents, Copyrights, and Trademarks 75 00170.05 Assignment of Antitrust Rights 75 00170.07 Record Requirements 76 00170.07 Record Requirements 76 00170.10 Required Payments by Contractors 79 00170.20 Public Works Bond 80 00170.32 Protection of Navigable Waters 80 00170.60 Safety, Health, and Sanitation Provisions 80 00170.61 Industrial Accident Protection 80 00170.62 Labor Nondiscrimination 80 00170.63 Payment for Medical Care 80 00170.70 Insurance 83 00170.71 Independent Contractor Status 88 00170.72 Indemnity/Hold Harmless 88 00170.74 Employee Drug Testing Program 89 00170.75 Oregon Tax Laws 89 00170.76 Subcontractors Nondiscrimination 89 00170.78 Conflict of Interest 89 00170.79 Third Party Beneficiary 89 00170.80 Responsibility for Damage to Work 89 00170.82 Responsibility for Damage to Property and Facilities 90 00170.85 Responsibility for Defective Work 91 00170.92 Fencing, Protecting Stock, and Safeguarding Excavations 93 00170.93 Trespass 93 00170.94 Use of Explosives 93 Section 00180 -Prosecution and Progress 00180.00 Scope 94 00180.05 Assignment/Delegation of Contract 94 00180.06 Assignment of Funds Due under the Contract 94 00180.10 Responsibility for Contract 94 00180.15 Agency's Right to Do Work at Contractor's Expense 94 00180.21 Subcontracting 96 00180.22 Payments to Subcontractors and Agents of the Contractor 99 00180.30 Materials, Equipment, and Work Force 99 00180.31 Required Materials, Equipment, and Methods 99 00180.40 Limitation of Operations 100 00180.41 Project Work Schedules 101 00180.42 Preconstruction Conference 109 00180.43 Commencement and Performance of Work 109 00180.44 Project Meetings 109 00180.50 Contract Time to Complete Work 111 00180.60 Notice of Delay 112 00180.65 Right-of-Way and Access Delays 112 00180.87 Failure to Comply with COBID Good Faith Requirement Plan 116 00180.90 Termination of Contract and Substituted Performance 116 Section 00190 -Measurement of Pay Quantities 00190.00 Scope 119 00190.10 Measurement Guidelines 119 00190.10 Measurement Guidelines 119 TOC-3 General Conditions Revised 01/27/2026 Conformed to Bid Documents 00190.20 Contractor to Provide Vehicle Weigh Scales 120 00190.30 Plant Scales 123 Section 00195-Payment 00195.10 Payment For Changes in Materials Costs 124 00195.12 Steel Material Price Escalation/De-Escalation Clause 124 00195.13 Asphalt Cement Material Price Escalation/De-Escalation Clause 126 00195.20 Changes to Plans or Character of Work 126 00195.30 Differing Site Conditions 127 00195.40 Unreasonable Delay by the Agency 127 00195.50 Progress Payments and Retained Amounts 128 00195.55 Monthly or Periodic Subcontractor Payment and Utilization Report(GFE Report Form 3) 131 00195.70 Payment under Terminated Contract 132 00195.80 Allowance for Materials Left on Hand 133 00195.96 Waiver of Claims 135 Section 00196-Payment for Extra Work 00196.00 General 136 00196.10 Negotiated Price 136 00196.20 Force Account 136 00197.00 Scope 137 00197.01 Extra Work on a Force Account Basis 137 00197.10 Materials 138 00197.20 Equipment 138 00197.30 Labor 140 00197.80 Percentage Allowances 140 00197.90 Billings 141 Section 00199 -Disagreements, Protests and Claims 00199.00 General 142 00199.10 Engineer's Decision Required 142 00199.20 Notices 142 00199.30 Engineer's Action 142 00199.40 Engineer's Inaction 142 00199.50 Engineer's Decision 142 00199.60 Dispute Resolution 142 TOC-4 General Conditions Revised 01/27/2026 00110 Conformed to Bid Documents PART 00100-GENERAL CONDITIONS Section 00110-Organization, Conventions,Abbreviations,and Definitions Organization 00110.00 Organization of Specifications-The Specifications are comprised of the following: • The"General Conditions for Construction for the City of Lake Oswego," published by the Agency, which contain Part 00100"General Conditions",which deal with the solicitation process and contractual relationships; • The"2024 Oregon Standard Specifications for Construction,"which contain Parts 00200 through 03000, published by the Oregon Department of Transportation which contain the detailed "Technical Specifications"involved in prosecution of the Work, organized by subject matter;and • The Special Provisions. In addition,throughout the Specifications: • Each Part is divided into Sections and Subsections. • Reference to a Section includes all applicable requirements of the Section. • When referring to a Subsection, only the number of the Subsection is used; the word "Subsection" is implied. • Where Section and Subsection numbers are not consecutive,the interval has been reserved for use in the Special Provisions or future expansion of the Standard Specifications. Conventions 00110.05 Conventions Used Throughout the Specifications Include: (a) Grammar—The"General Conditions for Construction for the City of Lake Oswego", part 00100"General Conditions", is written in the indicative mood, in which the subject is expressed. The"2024 Oregon Standard Specifications for Construction", published by the Oregon Department of Transportation, which contain parts 00200 through 03000,the detailed"Technical Specifications",are generally written in the imperative mood, in which the subject is implied. Therefore,throughout Parts 00200 through 03000, and on the Plans: • The subject, "the Contractor", is implied. • "Shall" refers to action required of the Contractor, and is implied. • "Will"refers to decisions or actions of the Agency and/or the Engineer. • The following words, or words of equivalent meaning, refer to the actions of the Agency and/or the Engineer, unless otherwise stated: "allowed", "directed", "established", "permitted", "ordered", "designated", "prescribed", "required", "determined". • The words "approved", "acceptable", "authorized", "satisfactory", "suitable", "considered", and "rejected","denied","disapproved",or words of equivalent meaning,mean by or to the Agency and/or the Engineer, subject in each case to Section 00150 of the General Conditions. • The words"as shown", "shown", "as indicated", or"indicated" mean "as indicated on the Plans". • Certain Subsections labeled"Payment"contain statements to the effect that"payment will be made at the Contract unit price, per unit of measurement, amounts for the following items" (followed by a list of items). In such cases, the Agency will pay for only those Pay Items listed in the Schedule of Items. 5 General Conditions Revised 01/27/2026 00110 Conformed to Bid Documents (b) Capitalization of Terms-Capitalized terms, other than titles, abbreviations, and grammatical usage, indicate that they have been given a defined meaning in the Standard Specifications. Refer to Section 00110.20"Definitions". Defined terms will always be capitalized in Part 00100; in Parts 00200 through 03000, defined terms will generally not be capitalized, with the notable exception of"the Contractor", "the Agency", and "the Engineer". (c) Punctuation- In this publication the "outside method" of punctuation is employed for placement of the comma and the period with respect to quotation marks. Only punctuation that is part of the quoted matter is placed within quotation marks. (d) References to Laws, Acts, Regulations, Rules, Ordinances, Statutes, Orders, and Permits-References are made in the text of the Specifications to "laws", "acts", "rules", "statutes", "regulations", "ordinances", etc. (collectively referred to for purposes of this Subsection as "Law"), and to "orders" and "permits" (issued by a governmental authority, whether local, State, or federal, and collectively referred to for purposes of this Subsection as "Permits"). Reference is also made to "applicable laws and regulations". The following conventions apply in interpreting these terms, as used in the Specifications. • Statutes and Rules-Oregon Revised Statutes (ORS) and Oregon Administrative Rules (OAR) referenced in the Specifications are accessible on line, including through the Oregon Legislative Counsel Committee web site and through the Oregon Secretary of State Archives Division web site. • Law- In each case, unless otherwise expressly stated therein, the Law is to be understood to be the current version in effect. This also applies where a specific Law is referenced or cited,regardless of whether the text of the Law has been included in the Specifications or not, and regardless of whether the text of the Law has been summarized or paraphrased. In each case,the current version of the Law is applicable under any Contract. The reader is therefore cautioned to check the actual text of the Law to confirm that the text included in the Specifications has not been modified or superseded. • Permits—Orders and Permits issued by a Government agency may be modified during the course of performing the Work under a Contract. Therefore, wherever the term "Order" or "Permit" is used in the Specifications, it is intended to refer to the then-current version. That version may be embodied in a modified,superseding order or permit,or it may consist of all terms and conditions of prior orders or permits that have not been superseded, as well as the additional terms added by amendment or supplement. In certain cases, the orders and/or permits are identified by name in the Specifications; in other cases, the terms are used in the generic sense. The reader is cautioned to check the text(s)of each order and permit identified either by name or by generic reference. Applicable Laws and Regulations- Where phrases such as "applicable law," "applicable laws and regulations,""applicable legal requirements,"or similar language appear,they shall be understood to include all applicable laws, acts, regulations, administrative rules, ordinances, statutes, orders, and permits issued by any governmental or regulatory authority. The words "law"and "laws" may or may not be capitalized in such phrases. (e) Reference to Websites- For Specifications that reference this Subsection, the Agency will identify the website addresses in the Special Provisions. Abbreviations 00110.10 Abbreviations - Following are meanings of abbreviations used in the Standard Specifications, in the Special Provisions, on the Plans, and in other Contract Documents. Other abbreviations and meanings of abbreviations may be used in the individual Sections of the Standard Specifications to which they apply, in the Special Provisions,and in OAR 731-005 and OAR 731-007. AAR - Association of American Railroads AASHTO - American Association of State Highway and Transportation Officials 6 General Conditions Revised 01/27/2026 00110 Conformed to Bid Documents ABC - Associated Builders and Contractors, Inc. AC - Asphalt Concrete ACI - American Concrete Institute ACP - Asphalt Concrete Pavement ACWS - Asphalt Concrete Wearing Surface ADA - Americans with Disabilities Act ADT - Average Daily Traffic AGC - Associated General Contractors of America AIA - American Institute of Architects AISC - American Institute of Steel Construction AISI - American Iron and Steel Institute AITC - American Institute of Timber Construction ANSI - American National Standards Institute APA - Engineered Wood Association APWA - American Public Works Association AREMA - American Railway Engineering and Maintenance of Right-of-Way Association ASCE - American Society of Civil Engineers ASME - American Society of Mechanical Engineers ASTM - American Society for Testing and Materials ATPB - Asphalt Treated Permeable Base ASTV - Actual Strength Test Value AWG - American Wire Gauge AWPA - American Wood Protection Association AWS - American Welding Society AWWA - American Water Works Association CAgT - Certified Aggregate Technician CAT-I - Certified Asphalt Technician I CAT-II - Certified Asphalt Technician II CBM - Certified Ballast Manufacturers CCO - Contract Change Order CCT - Concrete Control Technician CDT - Certified Density Technician CEBT - Certified Embankment and Base Technician CFR - Code of Federal Regulations CLSM - Controlled Low-Strength Materials CIPP - Cured In Place Pipe CMDT - Certified Mixture Design Technician COBID Certification Office of Business Inclusion and Diversity CPF - Composite Pay Factor CRSI - Concrete Reinforcing Steel Institute CFR - Code of Federal Regulations CS - Commercial Standard, Commodity Standards Division, U.S. Department of Commerce CSTT - Concrete Strength Testing Technician D1.1 - Structural Welding Code-Steel,American Welding Society,current edition D1.5 - Bridge Welding Code,American Welding Society, current edition DBE - Disadvantaged Business Enterprise DEQ - Department of Environmental Quality, State of Oregon DOGAMI - Department of Geology and Mineral Industries, State of Oregon DSL - Department of State Lands, State of Oregon EAC - Emulsified Asphalt Concrete EPA - U.S. Environmental Protection Agency 7 General Conditions Revised 01/27/2026 00110 Conformed to Bid Documents ESCP - Erosion and Sediment Control Plan FHWA - Federal Highway Administration, U.S. Department of Transportation FSS - Federal Specifications and Standards, General Services Administration GSA - General Services Administration HDPE - High Density Polyethylene ICEA - Insulated Cable Engineers Association (formerly IPCEA) IES - Illuminating Engineering Society IMSA - International Municipal Signal Association ISO - International Standards Organization ISSA - International Slurry Surfacing Association ITE - Institute of Transportation Engineers JMF - Job Mix Formula MFTP - Manual of Field Test Procedures (ODOT) MIL - Military Specifications MSC - Minor Structure Concrete MUTCD - Manual on Uniform Traffic Control Devices for Streets and Highways, FHWA, U.S. Department of Transportation NEC - National Electrical Code NEMA - National Electrical Manufacturer's Association NESC - National Electrical Safety Code NIST - National Institute of Standards and Technology NPDES - National Pollutant Discharge Elimination System NPS - Nominal Pipe Size(dimensionless) OAR - Oregon Administrative Rules ODA - Oregon Department of Agriculture ODOT - Oregon Department of Transportation ORS - Oregon Revised Statutes OR-OSHA - Oregon Occupational Safety and Health Division of the Department of Consumer and Business Services OSHA - Occupational Safety and Health Administration, U.S. Department of Labor OSSC - Oregon Standard Specifications for Construction,2024 Edition PCA - Portland Cement Association PCC - Portland Cement Concrete PCI - Precast/Prestressed Concrete Institute PCP - Pollution Control Plan PF - Pay Factor of a constituent PLS - Professional Land Surveyor PMBB - Plant Mixed Bituminous Base PROWAG - Public Rights-of-Way Access Guidelines PTI - Post-Tensioning Institute PUC - Public Utility Commission, State of Oregon PVC - Polyvinyl Chloride QA - Quality Assurance QC - Quality Control QCT - Quality Control Technician QL - Quality Level QPL - Qualified Products List RAP - Reclaimed Asphalt Pavement REA - Rural Electrification Administration, U.S. Department of Agriculture RMA - Radio Manufacturers Association or Rubber Manufacturers Association SAE - Society of Automotive Engineers 8 General Conditions Revised 01/27/2026 00110 Conformed to Bid Documents SI - International System of Units(Systeme Internationale) SRCM - Soil and Rock Classification Manual (ODOT) SSPC - Society for Protective Coatings T - Tolerances,AASHTO Test Method TCD - Traffic Control Devices TCP - Traffic Control Plan TCM - Traffic Control Measures TM - Test Method (ODOT) TPAR - Temporary Pedestrian Accessible Route TV - Target Value UBC - Uniform Building Code (as adopted by the State of Oregon) UL - Underwriters Laboratory, Inc. UPC - Uniform Plumbing Code (as adopted by the State of Oregon) USC - United States Code WAQTC - Western Alliance for Quality Transportation Construction WCLIB - West Coast Lumber Inspection Bureau WWPA - Western Wood Products Association 9 General Conditions Revised 01/27/2026 00110 Conformed to Bid Documents Definitions 00110.20 Definitions- Following are definitions of words and phrases used in the Standard Specifications, in the Special Provisions, on the Plans, and in other Contract Documents. Other definitions may be in the individual Sections of the Standard Specifications to which they apply, in the Special Provisions, and in OAR 731-005 and OAR 731-007. 3D Engineered Model-The Agency-prepared electronic file(s)that identify northing, easting, and elevation to represent the Work to be performed. The 3D Engineered Model may include the surface model(s)or other designed Work elements and is an electronic representation of the line, grade, and Cross Section applicable to the Project. 3D Construction Model-Supplemental unstamped 3D model, not furnished by the Agency, that the Contractor is required to submit to the Engineer. Act of God or Nature-A natural phenomenon of such catastrophic proportions or intensity as would reasonably prevent performance. Actual Strength Test Value(ASTV)-The ASTV at 28 Days is the average compressive strength of the three cylinders tested. All specimens that show definite evidence, other than low strength, of improper sampling, molding, handling,curing,or testing shall be discarded. The average strength of the remaining cylinders shall then be considered the test result. Addendum -A written or graphic modification, issued before the opening of Bids, which revises, adds to, or deletes information in the Solicitation Documents or previously issued Addenda. Additional Work- Increased quantities of any Pay Item, within the scope of the Contract, for which a unit price has been established. Advertisement-The public announcement (Notice to Contractors, Invitation for Bids or Advertisement for Bids)inviting Bids for Work to be performed or Materials to be furnished. Agency(Owner)-The City of Lake Oswego, a municipal corporation of the State of Oregon, Lake Oswego Redevelopment Agency(LORA), or as applicable,which has entered into a Contract with the Contractor. Agency-Controlled Lands-Lands owned by the Agency, or controlled by the Agency under lease or agreement, or under the jurisdiction and control of the Agency for the purposes of the Contract. Aggregate- Rock of specified quality and gradation. Attorney-in -Fact-An Entity appointed by another to act in its place, either for some particular purpose, or for the transaction of business in general. Award -Written notification to the Bidder that the Bidder has been awarded a Contract. Base-A Course of specified material of specified thickness placed below the Pavement. Bid-A competitive offer, binding on the Bidder and submitted in response to an invitation to bid. Bid Bond -The Surety bond for Bid guarantee. Bid Booklet-The bound paper version information included in the Solicitation Documents, or the electronic version that is available to be downloaded from the Agency's website that contain the information identified in 00120.10, (see 00110.05(e)) 10 General Conditions Revised 01/27/2026 00110 Conformed to Bid Documents Bid Closing-The date and time after which Bids, Bid modifications, and Bid withdrawals will no longer be accepted. Bid Documents-See under Solicitation Documents. Bid Opening-The date and time Bids are opened. Bid Schedule-The list of Pay Items,their units of measurement,and estimated quantities. (When a Contract is awarded,the Bid Schedule becomes the Schedule of Items.) Bid Section-The portion of the Bid Booklet containing all pages after the Bidder's checklist and before the appendix. Bidder-An Entity that submits a Bid in response to an invitation to bid. Bike Lane-A lane in the Traveled Way, designated by striping and Pavement markings for the preferential or exclusive use of bicyclists. Borrow- Material lying outside of planned or required Roadbed excavation used to complete Project earthwork. Boulders-Particles of rock that will not pass a 12-inch square opening. Bridge-A single or multiple span Structure, including supports, that carries motorized and non-motorized vehicles, pedestrians,or utilities on a Roadway,walk,or track over a watercourse, highway, railroad,or other feature. Buttress-A rock fill placed at the toe of a landslide or potential landslide in order to resist slide movement. Calendar Day-Any day shown on the calendar, beginning and ending at midnight. Camber-A slight arch in a surface or Structure to compensate for loading. Change Order-A written order issued by the Engineer to the Contractor modifying Work required by the Contract,or adding Work within the scope of the Contract,and,if applicable,establishing the basis of payment for the modified Work, or otherwise modifying the Contract. Changed Work-Work included in a Pay Item and within the scope of the Contract that is different from that reflected in the Contract Documents. (see 00140.30) Class of Project-A designation based on a Project's funding source, (i.e., State or Federal-Aid). Class of Work-A designation referring to the type of Work in which Bidders must be pre-qualified, if prequalification is required. Clay-Soil passing a No. 200 sieve that can be made to exhibit plasticity(putty-like properties)within a range of water contents. Clear Zone- The roadside area,beginning at the edge of the traveled way,available for the safe use of errant vehicles. This area may include a shoulder, recoverable or non-recoverable slopes, and/or a clear run-out area. Rigid objects and other hazards within the clear zone shall be relocated,shielded,or designed to break away to ensure safe traversability. Close Conformance-Where working tolerances are given on the Plans or in the Specifications, Close Conformance means compliance with those tolerances. Where working tolerances are not given, Close 11 General Conditions Revised 01/27/2026 00110 Conformed to Bid Documents Conformance means compliance, in the Engineer's judgment,with reasonable and customary manufacturing and construction tolerances. Coarse Aggregate-Crushed Rock or crushed Gravel retained on a 1/4 inch sieve,with allowable undersize. Cobbles- Particles of Rock, rounded or not, that will pass a 12 inch square opening and be retained on a 3-inch sieve. Commercial Grade Concrete-Concrete furnished according to Contractor proportioning, placed in minor Structures and finished as specified. Conduct Disqualification—A disqualification under ORS 279C.440. Contract (Agreement)-The written agreement between the Agency and the Contractor, including without limitation all Contract Documents,describing the Work to be completed and defining the rights and obligations of the Agency and the Contractor. Contract Amount (Contract Price)-Sum of the Pay Item amounts computed by multiplying the Pay Item quantities by the unit prices in the Schedule of Items. Contract Day-A day counted for purposes of charging Contract Time. Contract Documents-Solicitation Documents,Specifications, Plans,Standard and Supplemental Drawings, Contract Booklet Agency's Contract booklet, Change Orders, Force Account Work orders, pay documents issued by the Agency, Materials certifications, Project Work schedules, final estimate, written orders and authorizations issued by the Agency,Material source development and reclamation plans,and permits,orders and authorizations obtained by the Contractor or Agency applicable to the Project, as well as all documents incorporated by reference therein. Contract Time-The amount of time allowed to complete the Work under the Contract. Contractor-The Entity awarded the Contract according to the solicitation. Correction Period -Period from Third Notification to Final Acceptance as per subsection 00170.85(b). Course-A specified Surfacing Material placed in one or more Lifts to a specified thickness. Coverage-One Pass by a piece of Equipment over an entire designated area. Cross Section-The exact image formed by a plane cutting through an object, usually at right angles to a central axis, to determine area. Day-A Calendar Day including weekdays,weekends, and holidays, unless otherwise specified. Defective-An adjective which when modifying the word"Work"refers to work that: (1)is unsatisfactory,faulty or deficient; (2) does not conform to the Contract Documents; (3) does not meet the requirements of any inspection, test for approval referred to in the Contract Documents; or (4) has been damaged prior to Engineer's issuance of Third Notification (Final Completion). Design Engineer—The individual or entity named in the Special Provisions who designed part or all of the Project and who, by contract, has been assigned duties and responsibilities to assist Agency and Project Manager in administration of the Contract. Digital Signature:A form of electronic signature that is registered with a certification authority, e.g.,VeriSign or similar digital signature software company, which requires a password to be entered in order to generate 12 General Conditions Revised 01/27/2026 00110 Conformed to Bid Documents the digital signature upon the electronic document. Once the digital signature is applied, any alteration of the document results in the elimination of the digital signature on the document. Disqualification—The preclusion of a Person from contracting with a Contracting Agency fora period of time in accordance with OAR 137-049-0370. Durable Rock- Rock that has a slake durability index of at least 90% based on a two-cycle slake durability test, according to ASTM D4644. In the absence of test results, the Engineer may evaluate the durability visually. Emulsified Asphalt-Emulsified asphalt cement. Emulsified Asphalt Concrete-A mixture of Emulsified Asphalt and graded Aggregate. Engineer(Project Manager)- See Project Manager. Entity-A natural person capable of being legally bound, sole proprietorship, limited liability company, corporation, partnership, limited liability partnership, limited partnership, for-profit or nonprofit unincorporated association, business trust, two or more persons having a joint or common economic interest, or any other person with legal capacity to contract, or a government or governmental subdivision. Equipment-All machinery, tools, manufactured products, and fabricated items needed to complete the Contract or specified for incorporation into the Work. Establishment Period -The time specified to assure satisfactory establishment and growth of planted Materials. Existing Surfacing- Pavements,slabs,curbs, gutters,walks,driveways, and similar constructions of bricks, blocks, Portland cement concrete, bituminous treated materials, and granular surfacing materials on existing Highways. Extra Work-Work not included in the Contract, but deemed by the Engineer to be necessary to complete the Project. Field Order—A written order issued by the Engineer which requires minor changes in the Work but which may not involve a change in the Contract Amount or the Contract Times. Final Acceptance-Written confirmation by the Agency that the Project has been completed according to the Contract including all corrective work identified by the Agency during the Correction Period,with the exception of latent defects and Warranty obligations, if any, and has been accepted. Final Inspection-The inspection conducted by the Engineer to determine that the Project has been completed according to the Contract. Fine Aggregate-Crushed Rock, crushed Gravel, or Sand that passes a 1/4 inch sieve, with allowable oversize. First Notification-Written Notice to Proceed issued to the Contractor by the Engineer. Force Account Work- Items of Extra Work ordered by the Engineer that are to be paid according to Section 00197. Foreign Contractor—A Contractor that is not domiciled in or registered to do business in the State of Oregon. See OAR 137-049-0480. 13 General Conditions Revised 01/27/2026 00110 Conformed to Bid Documents Granular Material-Graded and selected free-draining material composed of particles of Rock, Sand, and Gravel. Gravel- Particles of Rock, rounded or not,that will pass a 3 inch sieve and be retained on a No. 4 sieve. Highway- Every road, street,thoroughfare and place, including bridges,viaducts and other structures within the boundaries of the State, open, used or intended for use by vehicular traffic. Incidental-A term identifying those acts, services, transactions, property, Equipment, labor, Materials, or other items for which the Agency will make no separate or additional payment. Inspector-The representative of the Engineer authorized to inspect and report on Contract performance. Leveling- Placing a variable-thickness Course of Materials to restore horizontal and vertical uniformity to existing Pavements, normally continuous throughout the Project. Lift-The compacted thickness of material placed by Equipment in a single Pass. Local Contracting Review Board—The governing council or board of the Agency. Mandatory Source-A material source provided by the Agency from which the Contractor is required to obtain Materials. (see 00160.00(b)and 00160.40) Materials-Any natural or manmade substance specified for use in the construction of the Project or for incorporation into the Work. Median-The portion of a divided Highway separating traffic traveling in opposite directions. Milestone - A principal event or activity specified in the Contract Documents relating to an intermediate completion date or time prior to Substantial Completion of all the Work. Multiple Course Construction -Two or more Courses, exclusive of Patching or Leveling, placed over the entire Roadway width. Multi-Use Path-That portion of the Highway Right-of-Way or a separate Right-of-Way, physically separated from motor vehicle traffic and designated for use by pedestrians, bicyclists and other non-motorized users. Neat Line-Theoretical lines specified or indicated on the Plans for measurement of quantities. Nondurable Rock- Rock that has a slake durability index of less than 90% based on a two-cycle slake durability test, as tested by ASTM D4644, or Rock that is observed to readily degrade by air, water, and mechanical influence. Notice to Contractors-The public announcement inviting Bids for Work to be performed or Materials to be provided. Notice to Proceed-Written notice authorizing the Contractor to begin performance of the Work. On-Site Work-Any Work taking place on the Project Site, including designated staging areas adjacent to the Project Site, except for installation of covered temporary signs according to Section 00222 Organic Soil-A Soil with sufficient organic content to influence the Soil properties. Panel-The width of specified Material being placed by Equipment in a single Pass. Pass-One movement of a piece of Equipment over a particular location. 14 General Conditions Revised 01/27/2026 00110 Conformed to Bid Documents Patching-Placing a variable-thickness Course of Materials to correct sags,dips,and/or bumps to the existing grade and Cross Section, normally intermittent throughout the Project. Pavement-Asphalt concrete or Portland cement concrete placed for the use of motor vehicles, bicycles, or pedestrians on Roadways, Shoulders, Multi-Use Paths and parking areas. Pay Item (Contract Item)-A specific unit of Work for which a price is provided in the Contract. Payment Bond-The approved security furnished by the Contractor's Surety as a guaranty of the Contractor's performance of its obligation to pay promptly in full all sums due for Materials, Equipment,and labor furnished to complete the Work. Peat-A Soil composed primarily of vegetative matter in various stages of decomposition, usually with an organic odor, dark brown to black color, and a spongy consistency. Performance Bond-The approved security furnished by the Contractor's Surety as a guaranty of the Contractor's performance of the Contract. Plans (Drawings)-Standard and Supplemental Drawings, and reviewed unstamped and stamped Shop Drawings and Deferred Submittals. (see 00150.10 and 00150.35) Project-The sum of all Work to be performed under the Contract. Project Manager (Engineer)-The Agency's representative assigned by the Agency to administer the Contract and who assumes the responsibilities, duties and authorities of the Project Manager(Engineer)as indicated throughout the Contract Documents. Project Site-The geographical dimensions of the real property on which the Work is to be performed, including designated contiguous staging areas. Prospective Source-A Material source provided by the Agency, from which the Contractor has the option of obtaining Materials. (see 00160.00(a)and 00160.40) Publicly-Owned Equipment- Equipment acquired by a state, county, municipality or political subdivision primarily for use in its own operations. Public Traffic-Vehicular or pedestrian movement, not associated with the Contract Work, on a public way. Quality Assurance Program-A program included in section 2 of the MFTP defined as planned and systematic actions necessary to provide confidence that a product or service will satisfy given requirements for quality. Railroad- Publicly or privately owned rail carriers, including passenger, freight, and commuter rail carriers, their tenants, and licensees. Also, Utilities that jointly own or use such facilities. Right-of-Way- Land, property,or property interest, usually in a strip,acquired for or devoted to transportation or other public works purposes. Roadbed -Completed excavations and embankments for the Subgrade, including ditches, side slopes, and slope rounding, if any. Roadside-The area between the outside edges of the Shoulders and the Right-of-Way boundaries. Unpaved median areas between inside Shoulders of divided Highways and infield areas of interchanges are included. 15 General Conditions Revised 01/27/2026 00110 Conformed to Bid Documents Roadway-That portion of a Highway improved,designed, or ordinarily used for vehicular travel, exclusive of the berm or Shoulder. If a Highway includes two or more separate Roadways, the term "Roadway" refers to any such Roadway separately, but not to all such Roadways collectively. (see Traveled Way) Rock-Natural deposit of solid material composed of one or more minerals occurring in large masses or fragments. Sand-Particles of Rock that will pass a No. 4 sieve and be retained on a No. 200 sieve. Schedule of Items-The list of Pay Items,their units of measurement, estimated quantities, and prices. Schedule of Values-The breakdown of the values of the component elements comprising a lump sum Pay Item. Second Notification -Written acknowledgment by the Engineer of Substantial Completion of a Milestone or of the Work according to 00180.50(g). Shoulder-The part of a Roadbed contiguous to the Traveled Way or Roadway, whether paved or unpaved, for accommodating stopped vehicles,for emergency use and for lateral support of Base and surface Courses. Silt-Soil passing a No. 200 sieve that is nonplastic or exhibits very low plasticity. Single Course Construction-A wearing Course only, not including patching or leveling Courses or partial width Base Course. Slope-Vertical distance to horizontal distance, unless otherwise specified. Soil -Accumulations of particles produced by the disintegration of Rock, which sometimes contains organic matter. Particles may vary in size from Clay to Boulders. Solicitation Documents- Documents which define the procurement of a public improvement Project, including, but not limited to, the Bid Booklet, Contract Booklet, Agency-provided Plans, Standard Specifications, Special Provisions, Addenda, and which includes all documents incorporated by reference. May also be called Bid Documents. Special Provisions-The special directions, provisions, and requirements specific to a Project that supplement or modify the Standard Specifications. Permits and orders governing the Project that are issued directly to the Agency by a governmental or regulatory authority are considered to be part of the Special Provisions, to the extent and under the conditions stipulated in the Special Provisions. This includes any amended or supplemental permits or orders issued during the performance of the Work under the Contract. Special Services-Services that the Contractor and Engineer agree cannot be satisfactorily performed by the Contractor's or Subcontractors'forces (e.g., fabrication or machining work that is most effectively performed off-site, or rental of operated Equipment as defined in 00180.20(c)). Specifications-The Standard Specifications and Special Provisions, together with all provisions of other documents incorporated therein by reference. Standard Drawings-The Agency-prepared detailed drawings for Work or methods of construction that normally do not change from project to project. Standard Specifications—The"General Conditions for Construction for the City of Lake Oswego"published by the Agency, and the"2024 Oregon Standard Specifications for Construction", Parts 00200 through 03000, "Technical Specifications", published by the Oregon Department of Transportation as amended by the 16 General Conditions Revised 01/27/2026 00110 Conformed to Bid Documents Agency. It provides directions, provisions, and requirements necessary for performing public improvement projects. State-The State of Oregon. Structures-Bridges, retaining walls, endwalls, cribbing, buildings, culverts, manholes, catch basins, drop inlets, sewers, service pipes, underdrains, foundation drains, and other similar features which may be encountered in the Work. Subbase-A Course of specified material of specified thickness between the Subgrade and a Base. Subcontractor-An Entity having a direct contract with the Contractor or another Subcontractor, at any tier, to perform a portion of the Work. Subgrade-The top surface of completed earthwork on which Subbase, Base, Surfacing, Pavement, or a Course of other Material is to be placed. Substantial Completion — The time at which the Work (or a specified part thereof) has progressed to the point where, in the opinion of the Engineer, the Work (or specified part thereof) is sufficiently complete, in accordance with the Contract Documents,so that the Work(or a specified part thereof)can be utilized for the purposes for which it is intended. Substructure-Those parts of a Structure which support the Superstructure, including bents, piers, abutments,and integrally built wingwalls, up to the surfaces on which bearing devices rest. Substructure also includes portions above bearing surfaces when those portions are built integrally with a Substructure unit(e.g., backwalls of abutments). When Substructure and Superstructure elements are built integrally, the division between Substructure and Superstructure is considered to be at the bottom soffit of the longitudinal or transverse beam,whichever is lower. Culverts and rigid frames are considered to be entirely Substructure. Superstructure-Those parts of a Structure above the Substructure, including bearing devices. Supplemental Drawings-The Agency-prepared detailed drawings for Work or methods of construction that are Project specific, and are denoted by title in the Project title block. Supplier-The Entity that furnishes goods to be incorporated into the Work. Surety-The Entity that issues the bond. Surfacing-The course or courses of material placed on the traveled way, auxiliary lanes, shoulders, or parking areas for pedestrian, bicycle, or vehicular use. Temporary Pedestrian Accessible Route (TPAR)-An area within a Work Zone, marked by signing, delineation and TCD, for the use of pedestrians to navigate through or around the work area. The TPAR is included as part of the Traffic Control Plan. Temporary Pedestrian Accessible Route Plan-A written and drawn plan within the TCP that identifies requirements for providing safe, effective and accessible routes for pedestrians through or around the Work Zone including TPAR details,advance public notification;and, construction and maintenance responsibilities. Third Notification -Written acknowledgment by the Engineer,subject to Final Acceptance,that as of the date of the notification the Contractor has achieved Final Completion of the Project according to the Contract, including without limitation completion of all minor corrective work, Equipment and plant removal, site clean- up, and submittal of all certifications, bills,forms and documents required under the Contract. Ton -One short ton of 2,000 pounds (Ton,ton,Tn, or T). Topsoil-Soil ready for use in a planting bed. 17 General Conditions Revised 01/27/2026 00110 Conformed to Bid Documents Traffic Control Devices (TCD)-Signs, signals, markings, and other devices placed on, over, or adjacent to a Roadway used to regulate, warn, or guide Public Traffic by authority of a public body or official having jurisdiction. Traffic Control Measures- Elements of the TCP including, but not limited to,TCD, personnel, Materials and Equipment used to control Public Traffic through a Work Zone. Traffic Control Plan(TCP)-A written and drawn plan for providing the safe and efficient movement of Public Traffic through or around a Work Zone, while providing protection for workers, incident responders, and Equipment. Traffic Lane-That part of the Traveled Way marked for moving a single line of vehicles. Traveled Way-That part of the Highway for moving vehicles, exclusive of berms and Shoulders. Typical Section -That Cross Section established by the Plans or the 3D Engineered Model which represents in general the lines to which the Contractor shall work in the performance of the Contract. Unsuitable Material- Frozen material, or material that contains organic matter, muck, humus, peat, sticks, debris,chemicals, toxic matter, or other deleterious materials not normally suitable for use in earthwork. Utility-A line,facility,or system for producing,transmitting,or distributing communications,power,electricity, heat, gas, oil, water, steam, waste, stormwater not connected with highway drainage, or any other similar commodity which directly or indirectly serves the public. The term may also mean the utility company,district, or cooperative owning and operating such facilities, including any wholly-owned or controlled subsidiary. Warranty Bond-The approved security furnished by the Contractor's, Subcontractor's, Manufacturer's, Installer's or Supplier's Surety as a guaranty of performance of their respective warranty obligations. Wetlands-Areas inundated or saturated by surface or groundwater at a frequency and duration sufficient to support, and that under normal circumstances do support, vegetation typically adapted to saturated soil conditions.Wetlands generally include swamps, marshes, bogs, and similar areas. Work-The furnishing of all Materials, Equipment, labor, and Incidentals necessary to successfully complete any individual Pay Item or the entire Contract, and the discharge of duties and obligations imposed by the Contract. Work Zone-An area within Highway construction, maintenance,or Utility Work activities which extends from the first road Work, Bridge Work, or Utility Work warning sign to the last sign or the last TCD. Work Change Directive—A written statement to Contractor issued on or after the Date of the Agreement and signed by Agency and recommended by the Engineer ordering an addition, deletion, or revision in the Work, or responding to differing or unforeseen subsurface or physical conditions under which the Work is to be performed or to emergencies. A Work Change Directive will not change the Contract Amount or the Contract Times but is evidence that the parties expect the change ordered or documented by a Work Change Directive will be incorporated in a subsequently issued Change Order following negotiations by the parties as to its effect, if any, on the Contract Amount or Contract Times. Work Day- Every Calendar day excluding Saturdays, Sundays and legal holidays as listed in ORS187.010. Worker-Any person performing work under the contract, including employees of the Contractor or subcontractor,and persons having full or partial ownership of the Contractor or subcontractor. (This definition is not intended to nor does it alter the definition or meaning of the term "worker" as used in any applicable laws or regulations, including but not limited to for purposes of paying prevailing wage rates.) 18 General Conditions Revised 01/27/2026 00110 Conformed to Bid Documents Working(Shop)Drawings-Supplemental Plans,not furnished by the Agency,that the Contractor is required to submit to the Engineer. (see 00150.35) Workplace Violence-Any act of physical, verbal or written aggression by an individual in or related to the work place and/or project sites. This includes, but is not limited to, verbal abuse, threats or intimidation and physical intimidation, assault or battery by a worker or former worker. Work place violence may also include destruction or abuse of property. 19 General Conditions Revised 01/27/2026 00120 Conformed to Bid Documents Section 00120-Bidding Requirements and Procedures 00120.01 Receipt of Bids; Opening —See Special Provisions 00120.02 Prequalification of Bidders—See Special Provisions. 00120.03 Request for Solicitation Documents—Special Provisions. 00120.04 Pre-Bid Meeting—See Special Provisions. 00120.10 Bid Booklet-The Bid Booklet may include, but is not limited to: • Invitation for Bids • Bidder's checklist • Bid Section • Appendix, which includes required time-sensitive forms, DBE information, sample forms, and other informational pages The Bid Section includes all pages after the Bidder's checklist and before the appendix. The Bid Section may include, but is not limited to: • Description and location of the proposed Project • Time, date, and location for opening Bids • Project completion time • Class of Project(i.e., Federal-Aid or State) • Class of Work • Bid statement • Certificate of non-collusion • Certificate of Nondiscrimination • Certificate of noninvolvement in any debarment or suspension (for Federal-Aid Projects) • Certificate regarding lobbying activities(for Federal-Aid Projects) • Certificate of residency(for State Projects) • Certificate of compliance with Oregon tax laws • Bid Schedule • Acknowledgement of Addenda • Identification of Bidder(s)and Sureties • Limiting statements(See 00120.50.) • Bid signature page • Bid Bond form • First-tier Subcontractor Disclosure form • Good Faith Effort Equity Contracting Program o GFE Form 1 —Subcontractor and Self-Perform List 20 General Conditions Revised 01/27/2026 00120 Conformed to Bid Documents o GFE Form 2—Contract and Bids Received Log (the Bidder shall, within two working hours of the time Bids are due to be submitted, submit to the Agency if not submitted with bid package.) o GFE Form 3—Monthly or Periodic Subcontractor Payment and Utilization Report Depending on the Class of Project, other certificates or statements may be included within the Bid Section. Plans, Specifications,and other documents referred to in the Bid Section will be considered part of the Bid. 00120.15 Examination of Work Site and Solicitation Documents; Consideration of Conditions to be Encountered - Before submitting a Bid, Bidders shall make a careful visual examination of the site of the proposed Work, the Bid Booklet, Plans, and Specifications. Bidders shall also contact utility owners to verify all utilities' anticipated involvement on the Project Site. Bidders are further encouraged to review any subsurface investigation materials referenced in 00120.25 that may be available and to conduct additional investigations of any unusual conditions apparent during the visual site examination. As soon as reasonably practicable after noting any such unusual condition, Bidder shall notify Agency, in writing,of any such unusual condition and the additional investigation undertaken by Bidder. Submission of a Bid will constitute confirmation that the Bidder has examined the Project Site and Solicitation Documents, finds the Plans and Specifications to be sufficiently detailed and accurate to enable Bidder to properly perform the Work, and understands the conditions to be encountered in performing the Work and all requirements of the Contract. The Bidder is responsible for loss or unanticipated costs suffered by the Bidder because of the Bidder's failure to fully examine the site and become fully informed about all conditions of the Work, or failure to request clarification of Plans and Specifications Bidder believes to be erroneous or incomplete. Any requests for clarification of or changes to the Plans and Specifications required by the Bidder shall be requested in writing via e-mail through the Engineer at least seven (7) days prior to bid opening. Requests concerning erroneous or incomplete Plans or Specifications shall also be made in sufficient time for the Agency's response to reach all registered Bidders before submission to the Engineer. The Agency will make any necessary modifications and issue Addenda to Bidders prior to Bid Closing. Unless the procurement period is shorter than one week, notifications and requests for changes or clarification shall be submitted at least ten Days prior to the date of Bid Closing. The Agency will respond to each request at least 72 hours prior to the date of Bid Closing. If the Procurement period is less than seven Days,requests shall be submitted within one Day after the Procurement is issued and the Agency will issue its response to each such request at least 24 hours prior to Bid Closing. Failure to timely request clarifications or changes shall be deemed acceptance of all of the terms and conditions of the Procurement. Oral explanations or interpretations given before receiving Bids for a Project will not be binding. To be binding, interpretation of the Plans and Specifications by the Agency must be made by written Addendum furnished to all Holders of Bidding Plans according to 00120.30. Bidder protests to the Specifications or Contract terms and conditions shall be submitted in accordance with the Lake Oswego Public Contracting Rules. The time specified for submission of protests of Specifications or Contract terms and conditions specified in OAR 137-049-0260(3)(a)is changed to seven days. 00120.16 Material,Equipment,and Method Substitutions- When the Contract specifies certain Materials, Equipment, Products, and/or Methods, the Bidder shall include those specified items in the Bid unless the Engineer has issued an Addendum granting approval for substitution. Unless the Engineer has approved substitutions prior to Bid Opening, the Bidder shall furnish the items specified in the Contract. Substitution after Contract Award is addressed in 00180.31(b), 00180.31(c), and 00180.31(d). The procedure for requesting approval is as follows: (a)Written Request—Unless exempt under ORS 279C.345, if a Bidder proposes to use Materials, Equipment, Products, and/or Methods other than those specified,the Bidder shall submit a written request to 21 General Conditions Revised 01/27/2026 00120 Conformed to Bid Documents the Engineer at least seven (7)calendar days prior to Bid Opening. The request shall include complete descriptive and technical information on the proposed substitution. (b) Functional Similarity—Proposed Materials, Products, and Equipment shall be similar in design, and equal or superior in quality and function to those specified. (c) Manufacturer's Information—If manufacturers' brochures or other information are required, the Bidder shall submit three(3)copies of each,with all pertinent information clearly marked. (d) Differences—The Bidder shall specifically identify all differences between the specified Materials, Equipment, Products, and/or Methods and the proposed substitutions. (e)Cost—If a proposed substitution requires alterations to the design, space requirements, or any other modifications to the Plans,the Bidder shall include in the request all associated costs for the revised design and construction. (f) Notification of Holders of Bidding Plans—If the Engineer approves a proposed substitution,such approval and any modifications necessitated by the substitution shall be issued to all Bidders by Addendum. 00120.17 Use of Agency-Owned Land for Staging or Storage Areas The Contractor may use Agency-owned property for staging or storage areas, subject to the following limitations: (a) Within Normal Right-of-Way Limits- If approved by the Engineer, the Contractor may use available property within the normal Right-of-Way limits for the purpose of constructing improvements under the Contract as long as such use does not unduly impede other legitimate users of the Right-of-Way or adjacent properties. Where the Agency owns, or has rights to, other adjacent properties in the Project area, "normal Right-of-Way" is limited to a line drawn across that property connecting the normal Right-of-Way limits on either side of the property. (b) Outside Normal Right-of-Way Limits-The Contractor may not use Agency-owned property outside of normal Right-of-Way limits for the Project without the approval of the Engineer. If a Bidder obtains approval before submitting a Bid, use of the property will be at no cost to the Contractor, or at a cost stated by the Engineer upon granting approval, as confirmed by Addendum. If approval is not obtained before submitting a Bid,and the Contractor proposes to use Agency-owned property outside the normal Right-of-Way limits, then use of the property may be approved by the Engineer, but the Contractor will be assessed fair market value, as determined by the Engineer,for use of the property. (c) Restrictions on Use-Contractors shall comply with all applicable laws, ordinances, and regulations pertaining to use of Agency-owned property, and shall: • Not cause unreasonable impacts on traffic and other facility users. • Clean up all hazardous materials deposited by,or resulting from, Contractor operations. • Be responsible for all costs associated with use of the property. 00120.20 Interpretation of Quantities in Bid Schedule-Quantities appearing in the Bid Schedule are approximate and are provided only for comparison of Bids. The Agency does not warrant that the actual individual items,amount of Work, or quantities will correspond to those shown in the Bid Schedule. Payment to the Contractor will be made only for actual quantities of Work performed and accepted or Materials furnished and accepted, as required by the Contract. Quantities of Work to be performed and Materials to be furnished may each be increased, decreased, or omitted as provided in 00120.30 and 00140.30. 22 General Conditions Revised 01/27/2026 00120 Conformed to Bid Documents 00120.25 Subsurface Investigations - If the Agency has conducted subsurface or geologic investigations of the proposed Project Site or contiguous to the Project Site,the results of the investigations may be included in written geotechnical data reports. If geotechnical data reports have been prepared, such reports shall be included in the Solicitation Documents(see Special Provisions)and shall be considered as part of the Contract Documents to the extent that the Contractor may reasonably rely upon the accuracy of the technical data contained in such reports. If the Agency has retained subsurface samples, they will also be available for inspection. Bidders and the Contractor may make arrangements for viewing the samples through the Engineer's office. The availability of subsurface information from the Agency is solely for the convenience of the Bidder and shall not relieve the Bidder or the Contractor of any risk, duty to make examinations and investigations as required by 00120.15,or other responsibility under the Contract Documents. It is mutually agreed to by all parties that: • The written report(s)are reference documents and not part of the Contract Documents. • The subsurface investigations made by the Agency are for the purpose of obtaining data for planning and design of the Project. • The data for individual test boring logs apply only to that particular boring and is not intended to be conclusive as to the character of any material between or around test borings. • If Bidders use this information in preparing a Bid,it is used at their own risk,and Bidders are responsible for all conclusions, deductions,and inferences drawn from this information. • Contractor may not rely upon or make any claim against Owner, including its Engineer, or Design Engineer or any of their officers, directors, members, partners, employees, consultants, or subcontractors with respect to any Contractor interpretation of or conclusion drawn from any technical data or any such other data, interpretations,opinions, or information. 00120.30 Changes to Plans, Specifications, or Quantities before Opening of Bids -The Agency reserves the right to issue Addenda making changes or corrections to the Plans, Specifications,or quantities. Only holders of Solicitation Documents obtained from the Agency's office who have been identified by the Agency as Holders of Bidding Plans will be notified of these Addenda by e-mail, or delivery service,or sent to the Bidder's address as it appears in the Agency's files. The Agency may extend Bid Closing if Agency determines prospective Bidders need additional time to review and respond to Addenda. Agency will not, except to the extent required by a countervailing public interest, issue Addenda less than 72 hours before Bid Closing unless the Addendum also extends Bid Closing. Bidders shall acknowledge Addenda by listing Addenda on the Bid Form. The Agency will not be responsible for failure of Bidders to receive Addenda sent as described in the preceding paragraph. Bids shall incorporate all Addenda. Bids may be rejected if opened and found by the Agency to not be based on all Addenda issued before Bid Closing. 00120.40 Preparation of Bids: Bids not in compliance with the requirements of this Subsection may be considered non-responsive. (a) General: (1) Bids-The Bidders shall not alter, in any manner, the documents within the Bid Section. Bidders shall complete the certifications and statements included in the Bid Section of the Bid Booklet according to the instructions. Signature of the Bidder's authorized representative thereon constitutes the Bidder's confirmation of and agreement to all certifications and statements contained in the Bid Booklet. Entries on the documents in the Bid Section shall be in black or blue ink or typed. Signatures and initials shall be in black or blue ink. 23 General Conditions Revised 01/27/2026 00120 Conformed to Bid Documents The Bidder shall properly complete and bind all the documents in the Bid Section, as specified in 00120.10, between the front and back covers of the Bid Booklet, except that the Bid Bond is not required if another permissible type of Bid guaranty is provided. (see 00120.40(d)) (b) Bid Schedule Entries: (1) Bid Schedule Entries- Using figures, Bidders shall fill in all blank spaces in the Bid Schedule. For each item in the Bid Schedule,Bidders shall enter the unit price and the product of the unit price multiplied by the quantity given. The unit price shall be greater than zero, shall contain no more than two decimal places to the right of the decimal point, and shall be expressed in U.S. dollars and cents (for example, $150.25 or$0.37). Unit prices submitted which contain more than two decimal places,will be truncated by the Agency at the second decimal place to determine the product of the unit price and quantity. No rounding will be considered or paid. Bidders Bid shall also enter the total amount of the Bid obtained by adding amounts for all items in the Bid Schedule. Corrections or changes of item entries shall be in ink, with incorrect entry lined out and correct entry entered and initialed in ink by the person signing the Bid. (c) Bidder's Address and Signature Pages-Bidders shall include in the Bid the address to which all communications concerning the Bid and Contract should be sent. The Bid must be signed by a duly authorized representative of the Bidder. (d) Bid Guaranty-All Bids shall be accompanied by a Bid guaranty in the amount of 10%of the total amount of the Bid. (1) Bid Guaranty- The Bid guaranty shall be either a Surety bond, irrevocable letter of credit issued by an insured institution as defined in ORS 706.008 or security in the form of a cashier's check or certified check made payable to the Agency. (see ORS 279C.365(4)) If a Surety bond is submitted, Bidders shall use the Agency's standard Bid Bond form included with the Bid Booklet or an alternative Bid Bond form, including terms of the Agency's standard Bid Bond, acceptable to the Agency. Bidders shall submit the bond with original signatures and the Surety's seal affixed. The Bid guaranty shall be submitted by mail, delivery service, or hand delivered to the offices and addresses,and at the times given in the Bid Booklet. • Acceptable Surety companies are limited to those authorized to do business in the State of Oregon. • Forfeiture of Bid guaranties is covered by 00130.60, and return of guaranties is covered by 00130.70. (e) Disclosure of First-Tier Subcontractors- If the Bidder's Bid exceeds$100,000 or without regard to the amount of a Bidder's Bid, if the Agency's cost estimate for a public improvement project as indicated in the Invitation for Bids exceeds$100,000,the Bidder shall,within two working hours of the time Bids are due to be submitted, submit to the Agency, on a form provided by the Agency, a disclosure identifying any first-tier Subcontractors that will furnish labor or labor and Materials, and whose contract value is equal to or greater than: • 5%of the total Project Bid, but at least$15,000; or • $350,000, regardless of the percentage of the total Project Bid. For each Subcontractor listed, Bidders shall state: • The name of the Subcontractor; • The dollar amount of the subcontract; and • The category of Work that the Subcontractor would be performing. 24 General Conditions Revised 01/27/2026 00120 Conformed to Bid Documents If no subcontracts subject to the above disclosure requirements are anticipated, a Bidder shall so indicate by entering"NONE"or by filling in the appropriate check box. For each Subcontractor listed,Bidders shall provide all requested information. An incomplete form will be cause for rejection of the Bid. The Subcontractor Disclosure Form may be submitted for a Bid either: • By filling out the Subcontractor Disclosure Form included in the Bid Booklet and submitting it together with the Bid at the time and place designated for receipt of Bids; • By removing it from the Bid Booklet, filling it out and submitting it separately to the Agency at the address given in the Bid Booklet. Subcontractor Disclosure Forms submitted by any method will be considered late if not received by the Agency within two working hours of the time designated for receiving Bids. In the event that multiple Subcontractor Disclosure Forms are submitted,the last version received prior to the deadline will be considered to be the intended version. THE AGENCY MUST REJECT A BID IF THE BIDDER FAILS TO SUBMIT THE DISCLOSURE FORM WITH THIS INFORMATION BY THE STATED DEADLINE (see OAR 137-049-0360). (f). COBID Certification or Subcontractor Utilization: The City of Lake Oswego is supportive of the regional economy,and is committed to solicit and achieve racial,gender,veteran,and emerging small business equity in City procurements.This strategy will be implemented by either utilizing firms certified by the State of Oregon Certification Office for Business Inclusion and Diversity (COBID)1 or firms that will plan and/or have used COBID subcontractors or purchased from COBID suppliers. If your firm or quote is eligible for points to be awarded based on COBID certification or utilization, please include one of the following: • Firm's COBID certification • Inclusion of Good Faith Effort Requirements for usage of COBID-certified contractors and/or subcontractors across different phases of the project. • Documentation showing the percentage of COBID-certified subcontractors employed and/or the dollar value of goods purchased from COBID-certified suppliers during past 6 months. 00120.45 Submittal of Bids: (a) Bids shall be submitted by mail, parcel delivery service, or hand delivery to the Agency, in the manner and at the times given in the Special Provisions. Submit Bids in a sealed envelope. If a delivery or courier service is used, the Bidder shall place the sealed envelope containing the Bid inside the delivery or courier service's envelope. Bids submitted after Bid Closing time will not be opened or considered. The Agency assumes no responsibility for the receipt and return of late Bids. Preparation and submission of Bids is at the sole risk and expense of the Bidder and is not a cost of Contract performance. (b) All Bid material submitted by Bidder shall become the property of the Agency and is subject to disclosure under the Oregon Public Records Law. A Bid that contains any information that is considered trade secret under ORS 192.501(2) should be segregated and clearly identified as such. This information will be kept 1 COBID certifies firms based on rules promulgated in OAR 123-200-1000 et seq. COBID Webpage: https://www.oreqon.qov/biz/proqrams/COBID/Paqes/default.aspx 25 General Conditions Revised 01/27/2026 00120 Conformed to Bid Documents confidential and shall not be disclosed except in accordance with the Oregon Public Records Law, ORS 192.311 et seq. Cost or price information is not considered confidential information; it must be open to public inspection. 00120.60 Modification or Withdrawal of Bids: (a) Modification — Bids once submitted may be modified in writing prior to the time and date set for Bid Closing and submitted to the place designated for receipt of Bids. Any modifications shall be prepared on the company letterhead,signed by an authorized representative,and state that the new document supersedes or modifies the prior Bid. The Bid modification shall be delivered in a sealed envelope and shall be marked as follows: BID MODIFICATION Bid Title and Closing Date and Time (b) Withdrawal- Bids may be withdrawn by written notification on company letterhead signed by an authorized representative and received prior to the time and date set for Bid Closing and submitted to the place designated for receipt of Bids. Bids also may be withdrawn in person prior to the scheduled Bid Closing upon presentation of appropriate identification. Requests to withdraw Bids shall be marked as follows: BID WITHDRAWAL Bid Title and Closing Date and Time No Bid can be withdrawn after having been opened. 00120.65 Opening and Comparing Bids-Bids will be opened and the total price for each Bid will be read publicly at the time and place indicated in the Invitation to Bids. Bidders and other interested parties are invited to be present. Bids for each Project will be compared on the basis of the total amount of each Bid. The total amount of the Bid will be the total sum computed from quantities listed in the Bid Schedule and unit prices entered by the Bidder. In case of conflict between the unit price and the corresponding extended amount,the unit price shall govern, and the Agency may make arithmetic corrections on extension amounts. Error(s)discovered after Bid opening cannot be corrected by the Bidder and the contractor will be required to perform work at the unit price if its Bid is accepted. 00120.70 Rejection of Nonresponsive Bids-A Bid will be considered irregular and will be rejected if the irregularity is deemed by the Agency to render the Bid non-responsive. Examples of irregularities include, without limitation: • The Bid Section documents provided are not properly used or contain unauthorized alterations. • The Bid is incomplete or incorrectly completed. • The Bid contains improper additions,deletions,alternate Bids, or conditions. • The Bid is submitted on documents not obtained directly from the Agency,or is submitted by a Bidder who has not been identified by the Agency as a Holder of Bidding Plans, as required by 00120.05. • The Bid or Bid modifications are not signed by a person authorized to submit Bids or modify Bids, as required by 00120.040 and 00120.60. 26 General Conditions Revised 01/27/2026 00120 Conformed to Bid Documents • A member of a joint venture and the joint venture submit Bids for the same Project. Both Bids may be rejected. • The Bid has entries not typed or in ink, or has signatures or initials not in ink. • Each change or correction is not individually initialed. • White-out tape or white-out liquid is used to correct item entries. • The price per unit cannot be determined. • The Bid guaranty is insufficient or improper. • The original Bid Bond form is not used or is altered. • The Oregon Construction Contractors Board registration number and expiration date are not shown on the Bid if required in the Solicitation Document. This requirement applies to Agency and State-funded Projects, with the exception of Aggregate production and landscape Projects. (not required on Federal-Aid Projects) • A disclosure of qualified first-tier Subcontractors, if required under 00120.40(f), is not received within two working hours of the time Bids are due to be submitted, or the disclosure form is not complete. • The Bidder has not complied with the GFE Equity Program requirements of the solicitation. • The Bid does not acknowledge all issued Addenda. • The Bid contains entries that are not greater than zero. • The Bid entries are not expressed in U.S. dollars and cents. • The Agency determines that any Pay Item is significantly unbalanced to the potential detriment of the Agency. In addition,the Agency may reject all Bids and suspend the project in the event all Bids exceed the funds the Agency has appropriated for the project or for good cause upon its finding that it is in the public interest to do so. The Agency may also waive minor informalities or irregularities. 00120.80 Reciprocal Preference for Oregon Resident Bidders-This Subsection applies only to Contracts for Projects financed without federal funds. Bidders shall complete the certificate of residency provided by the Agency in the Bid Booklet. Failure to properly complete the form will be cause to reject the Bid. As used in the certificate of residency and this Subsection, "Resident Bidder"means a Bidder who has: • Paid unemployment taxes or income taxes in the State of Oregon during any of the 12 calendar months immediately preceding submission of the Bid; • A business address in the State of Oregon;and • Certified in the Bid that the Bidder qualifies as a Resident Bidder. "Nonresident Bidder" means a Bidder who is not a Resident Bidder as defined above. In determining the lowest Bid, the Agency will, for the purpose of awarding the Contract, add a percentage increase to the Bid of a Nonresident Bidder equal to the percentage, if any, of the preference given to that Bidder in the state in which the Bidder resides (ORS 279A.120). The percentage preference applied in each state will be published on or before January 1 of each year by the Oregon Department of Administrative Services. The Agency may rely on these percentages without incurring liability to any Bidder(ORS 279A.120). This increase will only be applied to determine the lowest Bid, and will not cause an increase in payment to the Contractor after Award of the Contract. 27 General Conditions Revised 01/27/2026 00120 Conformed to Bid Documents 00120.90 Disqualification of Bidders-The Bid(s) of a disqualified Bidder will be rejected. Any of the following reasons is sufficient to disqualify a Bidder: • More than one Bid is submitted for the same Work by an Entity under the same or different name(s). • Evidence of collusion among Bidders. Participants in collusion will be found not responsible, and may be subject to criminal prosecution. • Any of the grounds for disqualification cited in ORS 279C.440. A Bidder will be disqualified if the Bidder has: • Not been prequalified if required by 00120.02; • Been declared ineligible by the Commissioner of the Bureau of Labor and Industries under ORS 279C.860; • Not been registered(licensed)by the Oregon Construction Contractors Board(CCB)or has not been licensed by the State Landscape Contractors Board before submitting a Bid (ORS 279C.365(1)(k), ORS 701.021, ORS 701.026, and ORS 671.530). The Bidder's registration number and expiration date shall be shown in the Bid form, if requested. Failure to furnish the registration number, if requested,will render the Bid non-responsive and subject to rejection. (not required on Federal-Aid projects.); or • Been determined by the CCB under ORS 701.227 not to be qualified to hold or participate in a public contract for a public improvement. 00120.91 Rejection of Bid on Grounds of Nonresponsibility of Bidder-The Bid of a Bidder who is found to be nonresponsible according to the criteria listed in 00130.10 or ORS 279C.375(3)will be rejected. 28 General Conditions Revised 01/27/2026 00130 Conformed to Bid Documents Section 00125—Good Faith Effort Equity Contracting Program 00125.00 Program Description The City of Lake Oswego is committed to a procurement strategy that is supportive of the regional economy, and is designed to solicit from and achieve racial,gender,veteran,and emerging small business equity in City procurements. The City desires to encourage and provide opportunities for firms certified by the State of Oregon Certification Office for Business Inclusion and Diversity(COBID). Compliance with this Good-Faith Effort("GFE") Program does the following: • Helps the City determine whether bidders meet the required GFE to open subcontracting opportunities to firms certified by COBID. • Assists the City with tracking subcontractor utilization on its projects. • Requires Prime Contractors to provide evidence of a GFE on ALL of their subcontracting opportunities, regardless of value. General Contractors must submit documentation showing that a GFE has been made to contact and contract with firms certified by COBID. Failure to comply with all of the requirements of the GFE Program may result in the bidder not being awarded COBID points in the selection process or a finding that a Contractor has materially breached the contract,which may result in a claim for damages. 00125.10 Pre-Bid Requirements 1. Contract Requirements. The Specifications identify Divisions of Work("DOW")or areas where the City's Project Manager has determined that subcontracting opportunities may exist. For identified DOW, bidders must meet a GFE to contract with subcontractors certified by COBID for each DOW identified in the solicitation document. a. A bidder may not use a subcontractor to perform any DOW unless the bidder has made met the GFE per these requirements. b. A bidder is not required to contact subcontractors certified by COBID for any DOW that will be performed by the bidder. If the bidder indicates that it will self-perform work for a particular DOW, it may still add a subcontractor in that DOW as long as bidder submits the required documentation as provided in the Post-Bid Requirements subsection. Please go to the State's website to locate potential subcontractors certified by COBID for each DOW. Search the codes for each DOW you intend to subcontract (e.g. NIGP Code 91038 for Asbestos Removal). The state COBID Certification Directory is located at https://oregon4biz.diversitysoftware.com/FrontEnd/SearchCertified Directory.asp?XI D=2315&TN=oregon4biz If you have difficulty identifying potential subcontractors certified by COBID please contact the City's Project Manager. When searching for potential subcontractors, you are encouraged to contact subcontractors from Clackamas, Multnomah or Washington counties. 2. Who to Contact. For EACH DOW that will be performed by a subcontractor, bidders must contact: a. Each subcontractor certified by COBID that attended the pre-bid meeting (if one was held)that identified itself as a subcontractor in one or more specific DOW that the bidder will subcontract. The Pre-Bid Attendance List will be available to bidders on the City's Bids page located at: https://www.ci.osweqo.or.us/bids/ 29 General Conditions Revised 01/27/2026 00125 Conformed to Bid Documents b. A minimum of five subcontractors certified by COBID for each DOW that will be subcontracted. If there are fewer than five subcontractors listed on the State's website for a particular DOW, then bidders shall contact ALL of the subcontractors listed on the website for that DOW. 3. When to Contact. Bidders shall make first contact with subcontractors certified by COBID at least seven (7) calendar days before the bid opening. For example, if the bid opening date is on Thursday, then the first contact shall be on or before the Thursday of the preceding week. 4. How to Contact. a. Bidders shall first contact subcontractors certified by COBID by letter,fax,or email to advise them of potential subcontracting opportunities; b. Bidders shall then follow up the first contact with telephone calls to each subcontractor certified by COBID to determine if a bid will be submitted or if further information is required. Bidders are not required to follow up with the first contact if the subcontractor responds to the first contact with a statement that the subcontractor will not bid on this project or if the subcontractor has already submitted a sub-bid. 5. Provide Same Information. Bidders shall ensure that each subcontractor certified by COBID have an equal opportunity to compete for work by having the same information as other subcontractors. Bidders shall inform subcontractors certified by COBID of the date and time that sub-bids are due. 6. OPTIONAL. Although not required as part of the City's GFE Program, bidders should also consider the following: a. Advertising in community-based newspapers(i.e., Skanner,Asian Reporter, El Hispanic, etc.). b. Providing letters to minority and women community organizations. c. Using alternative methods of participations with COBID certified firms through arrangements such as joint ventures, negotiated subcontract agreements, and competitive bids. d. Purchasing construction materials and equipment from COBID certified suppliers. 00125.20 General Bid Requirements Bidders shall also submit the following required forms. A checklist has been provided near the beginning of the Solicitation Document to allow bidders to check and confirm that they have enclosed the required forms. Form 1. Subcontractor and Self-Perform List DUE WITH BID FROM ALL BIDDERS a. All bidders shall submit Form 1 with their bid. Failure to submit Form 1 will result in the City deeming the bid non-responsive and rejecting the bid. b. Form 1 shall list all subcontractors to be used on the contract regardless of the dollar amount. This is more than what is required by the State's First-Tier Subcontractor Disclosure Form. If this bid includes bid alternates, then bidders shall list all first-tier subcontractors who will be used if the City elects to do the additional work. c. Bidders shall list all DOW they intend to self-perform and separately list any DOW where the identity of the subcontractor who will perform the work is undetermined at bid time. Form 2. Contact and Bids Received Log and Solicitation Letter DUE WITH BID FROM ALL BIDDERS 30 General Conditions Revised 01/27/2026 00130 Conformed to Bid Documents a. Form 2. Submit Form 2 (or equivalent)with the bid. Failure to timely submit Form 2 may result in the City deeming the bid non-responsive and rejecting the bid. The Bidder shall, within two working hours of the time Bids are due to be submitted, submit to the Agency if not submitted with bid package. b. Solicitation Letter.Also submit a copy of the letter,fax, or email sent to subcontractors certified by COBID to solicit bids for this project. If bidder sent more than one communication, then bidder shall submit a copy of each communication. Form 3. Monthly Subcontractor Payment and Utilization Report DUE MONTHLY OR PERIODICALLY FROM THE AWARDED CONTRACTOR Contractor shall list the contract amounts and payment amounts to ALL SUBCONTRACTORS (including subcontractors certified by COBID) and second-tier subcontractors on Form 3. All first-tier subcontractors with second-tier subcontractors shall also submit Form 3 on a monthly basis. Contractor shall complete and submit a Monthly Subcontractor Payment and Utilization Reports by the 15th of each month once work has commenced, unless otherwise directed by the City's Project Manager. 00125.30 Delivery Method Bidders may submit Forms 1 and 2 for the GFE in the same manner as submission of the bid. 00125.40 Subcontractor Changes 1. Contractor is prohibited from adding or replacing a subcontractor certified by COBID after the bid is opened unless Contractor receives written authorization from the City's Project Manager. The City's Project Manager must be immediately notified in writing once Contractor has the need to substitute a firm certified by COBID acting as a subcontractor. 2. No subcontractor may be added or replaced after the bid is due unless Contractor complies with the requirements of ORS 279C.585 and meets the GFE to contract with a firm certified by COBID for the work to be performed. Contractor must create and provide documentation of a GFE to the City's Project Manager before adding or replacing a subcontractor. 00125.50 Audit If City reasonably believes that Contractor has not met the Good Faith Effort Equity Contracting Program(GFE Program), then City has the right to inspect and copy the books and records of Contractor and any subcontractor employed on the project to determine whether a violation has occurred. If Contractor or any subcontractor fails to provide the books and records for inspection and copying when requested, Contractor's failure shall constitute a material breach of this contract and City may pursue the imposition of any remedies provided in the Enforcement subsection, including withholding progress payments. 00125.60 Enforcement Contractor's failure to meet the GFE Program constitutes a material breach of the contract. If Contractor materially breaches the contract, City may take one or more of the following actions: 1. Withhold Progress Payments or Final Payment. City may withhold progress payments or Final Payment until Contractor has remedied the action causing the material breach of contract. If progress payments are withheld, then Contractor shall not be entitled to interest on the progress payments. If a subcontractor is responsible for the action causing the material breach of contract,then City may choose to withhold only that portion of the progress payment. 2. Liquidated Damages. 31 General Conditions Revised 01/27/2026 00125 Conformed to Bid Documents a. Noncompliance. The parties agree that it would be difficult to assess the actual damage incurred by the City for Contractor's failure to comply with the GFE Program. The parties further agree that it is difficult to determine the cost to the City when contracting opportunities are not provided. Therefore, if Contractor fails to comply with the GFE requirements of the GFE Program, then Contactor agrees to pay $1,000 for each violation. These damages are independent of any liquidated damages that may be assessed due to any delay in the project caused by Contractor's failure to comply with this or other provisions of the contract. b. Delay. Contractor agrees that any delay due to the specified contract time as a result of Contractor's failure to comply with the requirements of this section subjects Contractor to liquidated damages. 3. Other Remedies. The remedies provided above do not limit any other remedies available to City in the event Contractor fails to meet the terms and conditions of the GFE Program. Questions about the GFE Program may be directed to the City's Project Manager 32 General Conditions Revised 01/27/2026 00130 Conformed to Bid Documents Section 00130 -Award and Execution of Contract 00130.00 Consideration of Bids- After opening and reading Bids, the Agency will check them for correct extensions of unit prices and totals. (see 00120.65) The total of extensions, corrected where necessary,will be used by the Agency for Award purposes. Discrepancies between words and figures will be resolved in favor of words. In selecting the lowest responsive Bid that meets the criteria for award, the Agency reserves the right to take into consideration any or all alternatives called for in the Bid Form. The Agency reserves the right to waive minor informalities and irregularities, seek clarification of any Bid or response that, in its sole discretion, it deems necessary or advisable, and to reject any or all Bids for irregularities under 00120.70 or for good cause after finding that it is in the public interest to do so (ORS 279C.395). An example of good cause for rejection in the public interest is the Agency's determination that any of the unit Bid prices are materially unbalanced to the Agency's potential detriment. A materially unbalanced Bid is defined as, "a Bid which generates a reasonable doubt that award to the Bidder submitting a mathematically unbalanced Bid will result in the lowest cost to the Agency."The Agency may correct obvious clerical errors, when the correct information can be determined from the face of the documents if it finds that the best interest of the Agency and the public will be served thereby. Bids will be considered, and a Contract awarded, if at all, within sixty(60)calendar days from the date of Bid Opening, unless an extension beyond that period is agreed to by both parties and acknowledged in writing by the Bidder. 00130.10 Award of Contract - After the Bids are opened and a determination is made that a Contract is to be awarded, the Contract will be awarded to the lowest responsible Bidder with the highest points awarded. For the purposes of this Section, "lowest responsible Bidder" means a responsible Bidder whom submitted the lowest responsive Bid, who is not on the list created by the Construction Contractors Board according to ORS Chapter 701, and who has: • Substantially complied with all prescribed public bidding procedures and requirements. • Available the appropriate financial, Materials, Equipment, facility and personnel resources and expertise, or ability to obtain the resources and expertise, necessary to indicate the capability of the prospective Bidder to meet all contractual responsibilities. • A satisfactory record of performance. In evaluating a Bidder's record of performance, the Agency may consider, among other things, whether the Bidder completed previous contracts of a similar nature with a satisfactory record of performance. For purposes of evaluating a Bidder's performance on previous contracts of a similar nature, a satisfactory record of performance means that to the extent that the costs associated with and time available to perform a previous contract remained within the Bidder's control,the Bidder stayed within the time and budget allotted for the procurement and otherwise performed the contract in a satisfactory manner. Satisfactory performance of the Contract also includes compliance with the requirements for records in 00170.07 for Contracts with the Agency. • A satisfactory record of integrity. In evaluating a Bidder's record of integrity, the Agency may consider, among other things, whether the Bidder has previous criminal convictions for offenses related to obtaining or attempting to obtain a contract or subcontract or in connection with the Bidder's performance of a contract or subcontract. • Qualified legally to contract with the Agency. • Supplied all necessary information in connection with the Agency's inquiry concerning responsibility. If a prospective Bidder fails to promptly supply information requested by the Agency concerning responsibility, the Agency shall base the determination of responsibility upon any available information, or may find the prospective Bidder not to be responsible. • Not been disqualified by the public contracting agency under ORS 279C.440. 33 General Conditions Revised 01/27/2026 00130 Conformed to Bid Documents If the Bidder is found not to have a satisfactory record of performance or integrity, the Agency will document the record and the reasons for the unsatisfactory finding. Points shall be awarded to a Bid based upon Cost and Good Faith Efforts Equity Program submission: • Method of Determining Cost Points(Maximum 90 points): • The lowest cost proposal shall be awarded 90 points. • A higher dollar quote's cost points is the percentage it is higher than the Lowest Cost, deducted from the maximum cost points. Formula:$HB-$LB/$LB = .XX(rounded). (100-XX)%x 90 points=YY Cost Points(HB means Higher Bid; LB means Lower Bid) Example: Assume Low Bid: $100; Higher Bid: $150; Cost Points: 90 points $150-$100/$100= .50. (100-50)%x 90 points=45 Cost Points. • Good Faith Efforts Equity Program (Maximum 10 points): • COBID certified: 10 points. • GFE Forms 1 and 2 demonstrates good faith effort to solicit and employ COBID certified subcontractors or purchase goods from COBID certified sellers of goods,the selection committee (and the City's Equity Program Manager, if requested)shall review the GFE Forms and award up to 8 points. • Documentation submitted shows the percentage of COBID-certified subcontractors employed and/or the purchase of goods from COBID-certified suppliers during past 6 months; the percentage x 10 points under this subsection. Example: 53%COBID subcontractor dollars=5.3 points awarded. The Agency will mail the Notice of Intent to Award to the Bidders, and may provide Notice of Intent to Award on the Agency's web site. The Award will not be final until the later of the following: • Seven working days after the Notice of Intent to Award has been posted as specified in the advertised solicitation or Addendum thereto; or • The Agency has provided a written response to each timely protest,denying the protest and affirming the Award. If the Agency accepts a Bid and awards a Contract,the Agency will send the successful Bidder written notice of acceptance and Award. Notice of Award and Contract Booklets ready for execution will be sent within 60 Calendar Days of the opening of Bids or within the number of Calendar Days specified in the Special Provisions or a written mutual agreement between successful Bidder and Agency. The Contractor will not automatically be entitled to extra compensation because the commencement of Work is delayed by failure of the Agency to send the Contract for execution. However, if more Calendar Days elapse between the date the Bid is opened and the date the Agency sends the Contract to be executed, as specified in 00130.10,the Agency will consider granting an adjustment of time for completion of the Work to offset any actual delay to Contract completion resulting directly from delay in commencement. 00130.12 Subcontractor or Supplier Identification - If the Special Provisions require the identity of certain Subcontractors, Suppliers, individuals, or entities to be submitted to Agency with the Bid, such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor, Supplier, individual,or entity if requested by Agency. 34 General Conditions Revised 01/27/2026 00130 Conformed to Bid Documents In addition, substitution of COBID-Certified Subcontractors requires notification to the Owner's Representative, approval of the Purchasing Agent and good faith efforts to acquire a new Subcontractor, as more specifically provided in that portion of the Specifications. 00130.15 Right to Protest Award -An adversely affected or aggrieved Bidder may submit to the Agency a written protest of the Agency's intent to Award within seven Days after issuance of the notice of intent to Award the Contract, unless a different protest period is provided under the Solicitation Documents. The Bidder's protest must be in writing and must specify the grounds upon which the protest is based. A Bidder is adversely affected or aggrieved only if the Bidder is eligible for Award of the Contract as the Responsible Bidder submitting the Responsive Bid most eligible for Award under the Contractor Evaluation Criteria and is next in line for Award, i.e.,the protesting Bidder must claim that all lower Bidders are ineligible for Award: a) Because their Bids were nonresponsive; or b) The Agency failed to conduct the Bid process as described in the Bid Document; c) The Agency has abused its discretion in rejecting the protestor's Bid as non-responsive or non- responsible; or d) The Agency's evaluation of Bids or subsequent determination of award is otherwise in a substantial violation of ORS Chapters 279A and 279C a provision in the Solicitation Documents or of an applicable Procurement statute or the Agency's public contracting rules. e) The written protest must describe the facts that support protest. The Agency will not consider late protests or protests that do not describe facts that support a finding that is aggrieved for one of reasons in clauses (a)through (d)above. 00130.20 Cancellation of Award-Without liability to the Agency, the Agency may for good cause cancel Award at any time before the Contract is executed by all parties to the Contract,as provided by ORS 279C.395 for rejection of Bids, upon finding it is in the public interest to do so. 00130.30 Contract Booklet-The Contract booklet may include but is not limited to: • Addenda • Schedule of Items • Public Improvement Contract • Performance Bond • Payment Bond • Certification of workers'compensation coverage • Prevailing Wage Rates • GFE Form 3—Monthly or Periodic Subcontractor Payment and Utilization Report • Special Provisions 00130.40 Contract Submittals- Before the Agency will execute the Contract, the successful Bidder shall furnish the following: (a) Performance and Payment Bonds- When Awarded the Contract,the successful Bidder shall furnish a Performance Bond and a Payment Bond of a Surety authorized to do business in the State of Oregon. 35 General Conditions Revised 01/27/2026 00130 Conformed to Bid Documents The successful Bidder shall submit the standard bond forms, which are bound in the Contract Booklet. or alternative bond forms acceptable to the Agency. Faxed or photocopied bond forms will not be accepted. The amount of each bond shall be equal to the Contract Amount. The Performance Bond and the Payment Bond must be signed by the Surety's authorized Attorney-in-Fact, and the Surety's seal must be affixed to each bond. A power of attorney for the Attorney-in-Fact shall be attached to the bonds in the Contract booklet, which must include bond numbers, and the Surety's original seal must be affixed to the power of attorney. Bonds shall not be canceled without the Agency's consent, nor will the Agency normally release them, prior to Contract completion. The amount of the Performance and Payment Bonds shall be increased to equal the new Contract Amount whenever the Contract Amount is increased for any reason. (b) Certificates of Insurance-The successful Bidder shall furnish the Agency certificates of insurance applicable to the Project, according to 00170.70. The insurance coverages shall remain in force throughout the performance of the Contract and shall not be allowed to lapse without prior written approval of the Agency. Bidders shall refer to 00170.70 for minimum coverage limits and other requirements. For specified Contracts, certified copies, and in some instances the original, of insurance policies may be required by the Special Provisions. (c) Registration Requirements: (1) ORS 701.021, ORS 701.026, and ORS 671.530 require that Bidders be registered with the Oregon Construction Contractors Board or licensed by the State Landscape Contractors Board prior to submission of a Bid on a Project not involving federal funds. Registration with the Construction Contractors Board or licensing by the State Landscape Contractors Board is not a prerequisite to bidding on Federal-Aid Projects; however, the Agency will not execute a Contract until the Contractor is so registered or licensed. (2) Bidders must be registered with the Corporation Division, Oregon Secretary of State, if bidding as a corporation, limited liability company,joint venture, or limited liability partnership, or if operating under an assumed business name and the legal name of each person carrying on the business is not included in the business name. (3) A Contractor registered under ORS 701 may bid on a landscaping Project or perform a construction project that includes landscape contracting as a portion of the project if the landscape contracting is subcontracted to a licensed landscaping business as defined in ORS 671.520. (4) A landscaping business may bid on a Project or perform a Contract that includes the phase of landscape contracting for which it is not licensed if it employs a landscape contractor, or subcontracts with another licensed landscaping business, licensed for that phase. (d) Tax Identification Number-The successful Bidder shall furnish the Agency's Finance Department:with the Bidder's Federal Tax Identification Number by submitting IRS Form W-9 Request for Taxpayer Identification and Certification (http://www.irs.gov/pub/irs-pdf/fw9.pdf). 00130.50 Execution of Contract and Bonds: (a) By the Bidder-The successful Bidder shall deliver the required number of Contract booklets with the properly executed Contract, Performance Bond, Payment Bond, certification of workers' compensation coverage, and the required certificates of insurance,to the Agency within 14 Calendar Days after the date on which the Contract booklets are sent or otherwise conveyed to the Bidder under 00130.10. The Bidder shall return the originals of all documents received from the Agency and named in this Subsection, with original signatures.or digital signatures. Certificates of insurance shall also be originals. Certificates of insurance for coverages that are permitted by the Agency under 00170.70(a)to be obtained by appropriate subcontractors shall be delivered by the Contractor to the Agency, together with the Contractor's request under 00180.21 for 36 General Conditions Revised 01/27/2026 00130 Conformed to Bid Documents approval of the subcontract with that subcontractor. No copies of these documents will be accepted by the Agency. Proper execution requires that: • If the Contractor is a partnership, limited liability partnership, joint venture, or limited liability company, an authorized representative of each Entity comprising it shall sign the Contract, Performance Bond, and Payment Bond, and an authorization to sign shall be attached. • If the Contractor is a corporation, the President and the Secretary of that corporation shall sign the Contract,Performance Bond,and Payment Bond. However,if other corporate officers are authorized to execute contracts and bonds,the successful Bidder shall furnish with those documents a certified, true and correct copy of the corporate bylaws or minutes stating that authority. If only one officer is signing,then the bylaws or minutes must include the authority to sign without the signature of others. The successful Bidder shall also include the title(s)or corporate office(s)held by the signer(s). (b) By the Agency-Within 10 Working Days after the Agency has received and verified the properly executed documents specified in 00130.50(a), and received legal sufficiency approval from the Agency's attorney(if required),the Agency will execute the Contract. The Agency will then send a fully-executed original Contract booklet to the successful Bidder,who then officially becomes the Contractor. 00130.60 Failure to Execute Contract and Bonds- Failure of the successful Bidder to execute the Contract and provide the required certificates, certifications, and bonds may be cause for cancellation of the Award, and may be cause for forfeiture of the Bid guaranty under ORS 279C.385. Award may then be made to the next responsible Bidder with the highest points, the Project may be re-advertised,or the Work may be performed otherwise as the Agency decides. The forfeited Bid guaranty will become the Agency's property, not as a penalty but as liquidation of damages resulting from the Bidder's failure to execute the Contract and provide the certificates,certifications,and bonds as required by these Specifications. 00130.70 Release of Bid Guaranties-Bid guaranties will be released and checks returned seven Calendar Days after Bids are opened, except for those of the three apparent Bidders with the highest points on each Project. The guaranties of those three apparent Bidders will be released and checks returned to unsuccessful Bidders within seven days of the Agency's execution of the Contract. 00130.80 Project Site Restriction -Until the Agency sends the Contractor written Notice to Proceed with the Work, and the Contractor has filed the public works bonds required in 00170.20, the Contractor shall not move Materials, Equipment, or workers onto that Project Site. 00130.85 Lake Oswego Business License—Contractor shall obtain a Lake Oswego Business License or Metro License for builders and landscape contractors prior to delivering services under this Contract. See ORS 701.015. 00130.90 Notice to Proceed-Notice to Proceed will be issued within five Calendar Days after the Contract is executed by the Agency. Should the Agency fail to issue the Notice to Proceed within five Calendar Days of Contract execution, the Contractor may apply for an adjustment of Contract Time according to 00180.80(c). 37 General Conditions Revised 01/27/2026 00140 Conformed to Bid Documents Section 00140-Scope of Work 00140.00 Purpose of Contract-The purpose of the Contract is to set forth the rights and obligations of the parties and the terms and conditions governing completion of the Work. The Contractor's obligations shall include without limitation the following: • The Contractor shall furnish all Materials, Equipment, labor,transportation,and Incidentals required to complete the Work according to Plans, Specifications, and terms of the Contract. • The Contractor shall perform the Work in accordance with the lines, grades, cross-section data, typical sections, dimensions, and other details shown on the Plans or in the 3D Engineered Model, as modified by written order or as directed by the Engineer. The Contractor shall perform all Work determined by the Engineer to be necessary to complete the Project, including Agency required changes in the Work in accordance with 00140.30 • The Contractor shall contact the Engineer for any necessary clarification or interpretation of the Contract. 00140.10 Typical Sections-The Typical Sections are intended to apply in general. At other locations where the Typical Section is not appropriate,the Contractor shall perform construction to the identified alignment as directed by the Engineer. 00140.20 Thickness-The thickness of Courses of Materials shown on the Plans,given in the Specifications, or established by the Engineer is considered to be the compacted thickness. Minor variations are acceptable when within tolerances specified in the Specifications or Plans, or when approved by the Engineer. 00140.30 Agency-Required Changes in the Work-Changes to the Plans, quantities, or details of construction are inherent in the nature of construction and may be necessary or desirable during the course of Project construction. Without impairing the Contract, the Agency reserves the right to require changes it deems necessary or desirable within the scope,which in the Specifications means general scope, of the Project. These changes may modify,without limitation: • Specifications and design • Grade and alignment • Cross Sections and thicknesses of Courses of Materials • 3D Engineered Model • Method or manner of performance of Work • Project Limits or may result in: • Increases and decreases in quantities • Additional Work • Elimination of any Contract item of Work • Acceleration or delay in performance of Work Upon receipt of a Change Order, the Contractor shall perform the Work as modified by the Change Order. If the Change Order increases the Contract Amount, the Contractor shall notify its Surety of the increase and direct the Surety to increase the amount of the performance and payment bonds to equal the new Contract Amount. If requested, the Contractor shall provide the Agency with a copy of the modified bond documents 38 General Conditions Revised 01/27/2026 00140 Conformed to Bid Documents within 15 calendar days of receipt of the Change Order. The Contractor's performance of Work according to Change Orders shall neither invalidate the Contract nor release the Surety. Payment for changes in the Work will be made according to 00195.20. Contract Time adjustments, if any,will be made according to 00180.80. A Change Order signed by the Contractor is the agreement that the adjustment in the Contract Amount or Contract Time indicated is full compensation for all change order items including the impact of the change order on the balance of the Work to be accomplished. 00140.40 Differing Site Conditions-The following constitute differing Project Site conditions provided such conditions are discovered at the Project Site after commencement of the Work: • Type 1 -Subsurface or latent physical conditions that could not have been discovered by careful examination of the Project site, utility locations and available records as described in 00120.15 and that differ materially from those indicated in the Contract Documents; or • Type 2-Unknown physical conditions of unusual nature that differ materially from those ordinarily encountered and generally recognized as inherent in the Work provided for in the Contract. The party discovering such a condition shall promptly notify the other party, in writing, of the specific differing conditions before they are disturbed and before the affected Work is performed. The Contractor shall not continue Work in the affected area until the Engineer has inspected such condition according to 00195.30 to determine whether an adjustment to Contract Amount or Contract Time is required. Payment adjustments due to differing Project Site conditions, if any, will be made according to 00195.30. Contract Time adjustments, if any,will be made according to 00180.80. 00140.50 Environmental Pollution Changes-ORS 279C.525 will apply to any increases in the scope of the Work required as a result of environmental or natural resources laws enacted or amended after the submission of Bids for the Contract. The Contractor shall comply with the applicable notice and other requirements of ORS 279C.525. The applicable rights and remedies of that statute will also apply. In addition to ORS 279C.525, the Agency has compiled a list at 00170.01 of those federal, State, and local agencies, of which the Agency has knowledge, that have enacted ordinances, rules, or regulations dealing with the prevention of environmental pollution and the preservation of natural resources that may affect the performance of Agency contracts. 00140.60 Extra Work- If directed by the Engineer's written order, the Contractor shall perform work not included in the Contract. The Contractor shall perform this work according to: • Standard Specifications • Standard Drawings • Other Plans and Specifications issued by the Engineer Payment for Extra Work will be made according to Section 00196. Contract Time adjustments, if any,will be made according to 00180.80. 00140.65 Disputed Work-The Contractor may dispute any part of a Change Order,written order,or an oral order from the Engineer by the procedures specified in Section 00199. 00140.70 Cost Reduction Proposals- The Contractor may submit written proposals to the Engineer that modify Plans, Specifications, or other Contract Documents for the sole purpose of reducing the total cost of construction. Unless otherwise agreed to in writing by the Agency, a proposal that is solely or primarily a proposal to reduce estimated quantities or delete Work, as determined by the Engineer, is not eligible for consideration as a cost reduction proposal and will instead be addressed under 00140.30,whether proposed or suggested by the Agency or the Contractor. 39 General Conditions Revised 01/27/2026 00140 Conformed to Bid Documents (a) Proposal Requirements-The Agency will not adopt a cost reduction proposal that impairs essential functions or characteristics of the Project, including,but not limited to,service life,economy of operation,ease of maintenance, designed appearance,or design and safety standards. To conserve time and funds, the Contractor may first submit a written request for a feasibility review by the Engineer. The request should contain a description of the proposal together with a rough estimate of anticipated dollar and time savings. The Engineer will, within a reasonable time, advise the Contractor in writing whether or not the proposal would be considered by the Agency,should the Contractor elect to submit a detailed cost reduction proposal. A detailed cost reduction proposal shall include without limitation the following information: • A description of existing Contract requirements for performing the Work and the proposed change; • The Contract items of Work affected by the proposed change, including any quantity variation caused by the proposed change; • Pay Items affected by the proposed change including any quantity variations; • A detailed cost estimate for performing the Work under the existing Contract and under the proposed change. Cost estimates shall be made according to Section 00197. Costs of re-design, which are incurred after the Agency has accepted the proposal,shall be included in the cost of proposed work; and • A date by which the Engineer must accept the proposal in order to accept the proposed change without impacting the Contract Time or cost reduction amount. (b) Continuing to Perform Work-The Contractor shall continue to perform the Work according to Contract requirements until the Engineer issues a Change Order incorporating the cost reduction proposal. If the Engineer fails to issue a Change Order by the date specified in the proposal, the proposal shall be deemed rejected. (c) Consideration of Proposal-The Engineer is not obligated to consider any cost reduction proposal. The Agency will not be liable to the Contractor for failure to accept or act upon any cost reduction proposal submitted. The Engineer will determine in its sole discretion whether to accept a cost reduction proposal as well as the estimated net savings in construction costs from the adoption of all or any part of the proposal. In determining the estimated net savings, the Engineer may disregard the Schedule of Items. The Engineer will establish prices that represent a fair measure of the value of Work to be performed or to be deleted as a result of the cost reduction proposal. (d) Sharing Investigation Costs-As a condition for considering a Contractor's cost reduction proposal,the Agency reserves the right to require the Contractor to share in the Agency's costs of investigating the proposal. If the Agency exercises this right, the Contractor shall provide written acceptance of the condition to the Engineer. Such acceptance will authorize the Agency to deduct its share of investigation costs from payments due or that may become due to the Contractor under the Contract. (e) Acceptance of Proposal Requirements- If the Contractor's cost reduction proposal is accepted in whole or in part,acceptance will be made by a Change Order that will include without limitation the following: • Statement that the Change Order is made according to 00140.70; • Revised Contract Documents that reflect all modifications necessary to implement the approved cost reduction measures; • Any conditions to which the Agency's approval is subject; • Estimated net savings in construction costs attributable to the approved cost reduction measures; and 40 General Conditions Revised 01/27/2026 00140 Conformed to Bid Documents • A payment provision according to which the Contractor will be paid 50%of the estimated net savings amount as full and adequate consideration for performance of the Work of the Change Order. The Contractor's cost of preparing the cost reduction proposal and the Agency's costs of investigating the proposal, including any portion paid by the Contractor, will be excluded from determination of the estimated net savings in construction costs. Costs of re-design, which are incurred after the Agency has accepted the proposal,will be included in the cost of the Work attributable to cost reduction measures. If the Agency accepts the cost reduction proposal, the Change Order that authorizes the cost reduction measures will also address any Contract Time adjustment. (f) Right to General Use-Once submitted,the cost reduction proposal becomes the property of the Agency. The Agency reserves the right to adopt the cost reduction proposal for general use without additional compensation to the Contractor when it determines that a proposal is suitable for application to other contracts. 00140.80 Use of Publicly Owned Equipment-The Contractor is prohibited from using publicly-owned Equipment except in the case of emergency. In an emergency, the Contractor may rent publicly-owned Equipment provided that: • The Engineer provides written approval that states that such rental is in the public interest; and • Rental does not increase the Project cost. 00140.90 Final Trimming and Cleanup- Before Final Inspection as described in 00150.90, the Contractor shall neatly trim and finish the Project and remove all remaining unincorporated Materials and debris. Final trimming and cleanup shall include without limitation the following: • The Contractor shall retrim and reshape earthwork, and shall repair deteriorated portions of the Project Site. • Where the Work has impacted existing facilities or devices,the Contractor shall restore or replace those facilities to their pre-existing condition. • The Contractor shall clean all drainage facilities and sanitary sewers of excess Materials or debris resulting from the Work. • The Contractor shall clean up and leave in a neat,orderly condition, Rights-of-Way, Materials sites,and other property occupied in connection with performance of the Work. • The Contractor shall remove temporary buildings,construction plants,forms,falsework and scaffolding, surplus and discarded Materials, and rubbish. • The Contractor shall dispose of Materials and debris, including, without limitation, forms, falsework, scaffolding,and rubbish resulting from clearing,grubbing,trimming,clean-up,removal,and other Work. These Materials and debris become the property of the Contractor. The Contractor shall dispose of these Materials and debris immediately. • The Contractor shall restore and replant or resurface adjoining properties to match existing grades and existing surfaces. • The Contractor shall install erosion and sediment control needed to stabilize the Project site. Unless the Contract specifically provides for payment for this item, the Agency will make no separate or additional payment for final trimming and cleanup. 00140.95"AS-BUILT" Drawings — The Contractor shall maintain a current and accurate record of Work completed during the course of this Contract and make available to the Engineer updated copies of the project "As-Builts"for Engineer's review at any time. These"As-Builts"drawings shall be kept by accurately marking a designated set of the Contract plans with the specified information as Work proceeds. Accurate, complete and current "As-Built" drawings are a specified requirement for monthly progress payments of the Work 41 General Conditions Revised 01/27/2026 00140 Conformed to Bid Documents completed. "As-Builts" shall be reviewed for completeness before recommendation of payment is granted. Incomplete or insufficient "As-Builts" will be returned to the Contractor and recommendation for progress payment denied. At project completion and as a condition of final payment, the Contractor shall deliver an acceptable complete and legible set of"As-Built"drawings to the Engineer. The"As-Built"drawings shall show the information listed below. Where the term"locate"or"location"is used, it shall mean record of position with respect to both the construction vertical datum and either construction horizontal datum or a nearby permanent improvement. • As-built location of underground and surface services and utilities as installed • As-built location of existing underground and surface utilities and services that are to remain and that are encountered during the course of the Work • As-built changes in dimension, location, grade or detail to that shown on plans • As-built changes made by change order • As-built details not in original plans • Provide fully completed shop drawings reflecting all revisions Upon completion of the construction, the Contractor shall review and certify the construction set of"As-Built" drawings for completeness and accuracy of representation of any changes. Final payment will not be processed until"As-Built"drawings have been submitted and approved. 42 General Conditions Revised 01/27/2026 00140 Conformed to Bid Documents Section 00150-Control of Work 00150.00 Authority of the Engineer(Project Manager)-The Engineer has full authority over the Work and its suspension. (see Section 00180) The Contractor shall perform all Work to the complete satisfaction of the Engineer. The Engineer's determination shall be final on all matters, including, but not limited to, the following: The Contractor shall direct all requests for clarification or interpretation of the Contract, in writing, to the Engineer. The Engineer will respond within a reasonable time. Contract clarification or interpretation obtained from persons other than the Engineer will not be binding on the Agency. The Engineer's decision is final on all matters, including but not limited to the following: • Quality and acceptability of Materials and workmanship • Measurement of unit price Work • Timely and proper prosecution of the Work • Interpretation of Contract Documents • Payments due under the Contract The Engineer's decision is final and, except as provided in 00180.80 for adjustments of Contract Time and Section 00199 for claims for additional Contract Time or Contract Price, may be challenged only through the dispute resolution process provided for in these General Provisions (00199) and, if applicable, the Special Provisions. Work performed under the Contract will not be considered complete until it has passed Final Inspection by the Engineer and has been accepted in writing by the Agency. Interim approvals issued by the Engineer, including but not limited to Final Acceptance,will not discharge the Contractor from responsibility for errors in prosecution of the Work, for improper fabrication, for failure to comply with Contract requirements, or for other deficiencies, the nature of which are within the Contractor's control. The Agency may appoint Inspectors and other personnel to assist in the administration of the Contract. The authority stated in this subsection is subject to the individual's delegated authority by the Agency. If the individual does not have the stated authority, the subsection reference shall include Agency personnel that have such authority. 00150.02 Inspector's Authority and Duties-To the extent delegated under 00150.01, Inspectors are authorized to represent the Engineer and Project Manager to perform the following: • Inspect Work performed and Materials furnished, including, without limitation, the preparation, fabrication,or manufacture of Materials to be used; • Orally reject defective Materials and to confirm such rejection in writing; • By oral order,temporarily suspend the Work for improper prosecution pending the Engineer's decision; and • Exercise additional delegated authority. Inspectors are not authorized to: • Accept Work or Materials. 43 General Conditions Revised 01/27/2026 00160 Conformed to Bid Documents • Alter or waive provisions of the Contract. • Give instructions or advice inconsistent with the Contract Documents. 00150.10 Coordination of Contract Documents-The Contract Documents, including but not limited to Contract Change Orders, the Special Provisions,the Plans, and the Standard Specifications are intended to collectively describe all of the items of Work necessary to complete the Project. The Contract Documents are complementary;what is required by one is as binding as if required by all. (a) Order of Precedence-The Engineer will resolve any discrepancies between these documents in the following order of precedence: 1. Permits from governmental agencies; 2. Engineer's written interpretations and clarifications issued on or after the Date of Contract; 3. Contract Change Orders; 4. This Contract,Addenda; 5. Bid; 6. Drawings(including written amendments)in the following order: • Supplementary Drawings • Reviewed and accepted, stamped Working (Shop) Drawings • 3D Engineered Models and supplemental Agency-prepared line, grade and Cross Section data applicable to the Project • Agency-prepared Standard Drawings • Approved unstamped Working Drawings and 3D Construction Models • Other agency-incorporated generic drawings 7. Special Provisions; 8. Standard Specifications; 9. Geotechnical Data Reports; 10. Bonds(if required); 11. General Conditions; 12. Notice to Proceed; 13. Solicitation Documents; 14. All other Contract Documents not listed above; Notes on a drawing shall take precedence over drawing details. Dimensions shown on the drawings, or that can be computed,shall take precedence over scaled dimensions. The drawings with the higher level of detail take precedence over less detailed drawings. (b) Immaterial Discrepancies-The Contract Documents specify details for the construction and completion of the Work. If Contract Documents describe portions of the Work in sufficient detail but are silent in some minor respect,the Contractor may proceed utilizing the current best industry practices. (c) Material Discrepancies- If the Contractor identifies a discrepancy, error, or omission in the Contract Documents that cannot be resolved by the approach specified in (b)above, the Contractor shall immediately request clarification from the Engineer. 00150.15 Construction Stakes, Lines,and Grades: 44 General Conditions Revised 01/27/2026 00140 Conformed to Bid Documents (a) Agency Responsibilities-The Engineer will provide the location of the existing benchmarks and horizontal control locations used to design the project and prepare the Plans. (b) Contractor Responsibilities-The Contractor shall: • Inform the Engineer of staking requirements at least 5 Calendar Days before the staking needs to begin; • Coordinate construction to provide sufficient area for the Engineer to perform surveying work efficiently and safely; • Accurately measure detailed dimensions, elevations, and slopes from the Engineer's stakes benchmarks and marks; • Perform the Work in such a manner as to preserve stakes and marks; and • Set any reference lines for automatic horizontal control locations; • Provide all labor, materials and equipment to properly stake out the project so that it can be constructed in accordance with the Contract Documents. Any changes made shall be recorded and the changed vertical and horizontal locations incorporated into the"as-built"drawings. • Inform the Engineer of any property corners monuments and/or survey markers that are not shown on the Plans and are found during construction activities prior to disturbing the monuments. Allow the Agency two Work days for referencing all found markers before they are removed. Monuments that are noted on the Plans to be protected and are disturbed by the Contractor's activities shall be replaced by the Contractor's surveyor at the Contractor's expense in accordance with ORS Chapter 209. 00150.20 Inspection: (a) Inspection by the Engineer-The Engineer may test Materials furnished and inspect Work performed by the Contractor to ensure Contract compliance. The Contractor shall notify the Engineer 48 hours (two full Work Days)in advance for inspection of each portion of the Work. Contractor shall not begin placing successive Courses or portions of Work until preceding Courses or portions of the Work have been inspected and approved by the Engineer. If the Contractor performs Work without the Engineer's inspection or uses Materials that the Engineer has not approved,the Engineer may order affected portions of the Work removed at the Contractor's expense. At the Engineer's direction,any time before the Work is accepted,the Contractor shall uncover portions of the completed Work for inspection. After inspection, the Contractor shall restore these portions of Work to the standard required by the Contract. If the Engineer rejects Work due to Materials or workmanship, or if the Contractor performed such Work without providing sufficient advance request for inspection to the Engineer, the Contractor shall bear all costs of uncovering and restoring the Work. If the Engineer accepts the uncovered Work, and the Contractor performed the Work only after providing the Engineer with sufficient advance notice, the costs of uncovering and restoring the Work will be paid for by the Agency according to 00195.20. (b) Inspection Facilities-The Contractor shall furnish walkways, railings, ladders, shoring, tunnels, platforms, and other facilities necessary to permit the Engineer to have safe access to the Work to be inspected. The Contractor shall require producers and fabricators to provide safe inspection access as requested by the Engineer. (c) Sampling -When directed by the Agency, the Contractor shall furnish the Engineer with samples of Materials that the Engineer will test. All of the Contractor's costs related to this required sampling are Incidental. 45 General Conditions Revised 01/27/2026 00160 Conformed to Bid Documents (d) Inspection by Third Parties-Where third parties have the right to inspect the Work,the Contractor shall coordinate with the Engineer and shall provide safe inspection access. (e) Contractor's Duty to Make Corrections-The Contractor shall perform all Work according to the Contract Documents. The Contractor shall correct Work that does not comply with the Contract Documents at its own expense. Inspection of the Work by the Engineer does not relieve the Contractor of responsibility for improper prosecution of the Work. 00150.25 Acceptability of Materials and Work-The Contractor shall furnish Materials and shall perform Work in Close Conformance to the Contract Documents. If the Engineer determines that the Materials furnished or the Work performed are not in Close Conformance with the Contract Documents, the Engineer may: • Reject the Materials or Work and order the Contractor,at the Contractor's expense,to remove, replace, or otherwise correct any non-conformity; or • Accept the Materials or Work as suitable for the intended purpose,adjust the amount paid for applicable Pay Items to account for diminished cost to the Contractor or diminished value to the Agency,document the adjustment, and provide written documentation to the Contractor regarding the basis of the adjustment. The Engineer's decisions concerning acceptability of Materials or Work will be final. 00150.30 Delivery of Notices-Written notices to the Contractor by the Engineer or the Agency will be delivered: • In person; • By U.S. Postal Service first class mail or priority mail(which at the sender's option may include certified or registered mail (return receipt requested), to the current office address as shown in the records of the Agency; or • By overnight delivery service of a private industry courier,to the current office address as shown in the records of the Agency. Notices shall be considered as having been received by the Contractor: • At the time of actual receipt when delivered in person; • At the time of actual receipt or seven Calendar Days after the postmarked date when deposited for delivery by certified or registered mail,whichever is earlier; or • At the time of actual receipt or three Calendar Days after deposit with a private industry courier for overnight delivery service,whichever is earlier. Written notices to the Engineer or the Agency by the Contractor shall be delivered to the Agency address shown in the Special Provisions, unless a different address is agreed to by the Engineer, and shall be delivered: • In person; • By U.S. Postal Service certified or registered mail (return receipt requested); or • By overnight delivery service of a private industry courier. Notices will be considered as having been received by the Engineer and Agency: 46 General Conditions Revised 01/27/2026 00140 Conformed to Bid Documents • At the time of actual receipt when delivered in person; • At the time of actual receipt or seven Calendar Days after the postmarked date when deposited for delivery by certified or registered mail,whichever is earlier; or • At the time of actual receipt or three Calendar Days after deposit with a private industry courier for overnight delivery service,whichever is earlier. 00150.35 Plans, 3D Engineered Models,Working Drawings,and 3D Construction Models: (a) Plans and 3D Engineered Models-The Agency-prepared Plans and 3D Engineered Models shall show details of lines,grades,cross sections,and typical sections of the roadway,as well as the locations and design details of structures. (b) Working Drawings and 3D Construction Models-The Contractor shall supplement the Agency- prepared Plans and 3D Engineered Models with stamped Working Drawings, unstamped Working Drawings, or 3D Construction Models that provide all information necessary to complete the Work. The applicable Section or Subsection of the Standard Specifications will indicate the supplemental information required and whether the drawings must be stamped or unstamped. Stamped Working Drawings, unstamped Working Drawings, and 3D Construction Models are defined as follows: (1) Stamped Working Drawings-Working Drawings, calculations, and other data prepared by, or under the direction of, a Professional Engineer licensed in the State of Oregon, bearing the engineer's signature, seal,and expiration date. (2) Unstamped Working Drawings-Working Drawings, calculations, and other data that do not bear an engineering seal. (3) 3D Construction Models-See 00110.20. (c) Number,Size,and Format of Working Drawings and 3D Construction Models-The Contractor shall submit Working Drawings and 3D Construction Models according to one of the following methods: (1) Paper Submittal -The Contractor shall submit to the Engineer seven copies of Working Drawings for steel Structures and six copies of Working Drawings for other Structures. The submitted copies shall be clear and readable. Drawing dimensions shall be 8 1/2 by 11 inches, 11 by 17 inches, or 22 by 36 inches in size. One copy of the submitted Working Drawings will be returned to the Contractor after processing. The Contractor shall submit such additional number of copies to the Engineer for processing that the Contractor would like to have returned. The Contractor shall not submit 3D Construction Model data in paper format. (2) Electronic Submittal-The Contractor shall submit electronic Working Drawings as directed by the Engineer. The Contractor shall submit 3D Construction Model data in LandXML format or as directed by the Engineer. (d) Processing Working Drawings and 3D Construction Models-The Engineer will process Working Drawings and 3D Construction Models as follows: (1) Stamped Working Drawings-Stamped Working Drawings will be designated as "accepted", "accepted with comments", or"returned for correction" by the Engineer. If stamped Working Drawings are returned for correction by the Engineer,the Contractor shall address all comments and resubmit the stamped Working Drawings. (2) Unstamped Working Drawings-Unstamped Working Drawings will be designated as"approved", "approved as noted", or"returned for correction" by the Engineer. If unstamped Working Drawings are returned for correction by the Engineer, the Contractor shall address all comments and resubmit the unstamped Working Drawings. 47 General Conditions Revised 01/27/2026 00160 Conformed to Bid Documents (3) 3D Construction Models-3D Construction Models will be designated as"approved","approved as noted",or"returned for correction"by the Engineer. If 3D Construction Models are returned for correction by the Engineer, the Contractor shall address all comments and resubmit the 3D Construction Models. The Contractor shall not fabricate or construct any structural components until the stamped or unstamped Working Drawings are returned by the Engineer with a written designation of "accepted", "accepted with comments", "approved", or"approved as noted", as applicable for the Working Drawings. The Contractor shall not begin construction activities that will utilize a 3D Construction Model until the Engineer has processed the model and designated it as"approved"or"approved as noted". The Engineer's processing of the Working Drawings and 3D Construction Models does not amend any contractual obligations of the parties. The Engineer will process and return Working Drawings and 3D Construction Models within 21 Calendar Days (65 Calendar Days if Railroad approval is required)after receipt by the Engineer. If the Engineer fails to return such drawings or models within this period of time, the Engineer will consider granting a Contract Time extension according to 00180.80. If the Contractor is required to resubmit Working Drawings or 3D Construction Models to the Engineer, the Engineer will process and return the Working Drawings or 3D Construction Models within 21 Calendar Days(65 Calendar Days if Railroad approval is required)after receipt of the resubmitted Working Drawings or 3D Construction Models by the Engineer. 00150.36 Submittals: (a) Description - Submittals covered by these requirements include manufacturers' information, shop drawings, test procedures, test results, samples, requests for substitutions, and miscellaneous Work-related submittals. Submittals shall also include, but not be limited to, all mechanical, electrical and electronic equipment and systems, materials, reinforcing steel, fabricated items, and piping and conduit details. The Contractor shall furnish all drawings, specifications, descriptive data, certificates, samples, tests, methods, schedules, and manufacturer's installation and warranty information and other instructions as specifically required in the Contract Documents to demonstrate fully that the materials and equipment to be furnished and the methods of work comply with the provisions and intent of the Contract Documents. (b) Contractor's Responsibilities (1) The Contractor shall be responsible for the accuracy and completeness of the information contained in each submittal and shall assure that the material, equipment or method of work shall be as described in the submittal. The Contractor shall verify that all features of all products conform to the specified requirements. Submittal documents shall be clearly edited to indicate only those items, models,or series of equipment,which are being submitted for review. All extraneous materials shall be crossed out or otherwise obliterated. The Contractor shall ensure that there is no conflict with other submittals and notify the Engineer in each case where his submittal may affect the work of another contractor or the Agency. The Contractor shall coordinate submittals among its subcontractors and suppliers including those submittals complying with unit responsibility requirements specified in applicable technical sections. (2) The Contractor shall coordinate submittals with the Work so that Work will not be delayed. It shall coordinate and schedule different categories of submittals, so that one will not be delayed for lack of coordination with another. No extension of time will be allowed because of failure to properly schedule submittals. The Contractor shall not proceed with Work related to a submittal until the submittal process is complete. This requires that submittals for review and comment shall be returned to the Contractor with the indication"No Exceptions Taken"or"Make Corrections Noted." 48 General Conditions Revised 01/27/2026 00140 Conformed to Bid Documents (3) Submittals shall be carefully reviewed by an authorized representative of the Contractor prior to submission to the Engineer. Each submittal shall be dated and signed by the Contractor as being correct and in strict conformance with the Contract Documents. In the case of Shop Drawings,each sheet shall be so dated and signed. Any deviations from the Contract Documents shall be noted by the Contractor on the transmittal form and such deviation shall be subject to approval in writing by the Engineer. The Engineer will only review submittals that have been so verified by the Contractor. Non-verified submittals will be returned to the Contractor without action taken by the Engineer, and any delays caused thereby shall be the total responsibility of the Contractor. (4) The Contractor shall certify on each submittal document that it has reviewed the submittal, verified field conditions, and complied with the contract documents. (5) The Contractor may authorize in writing a material or equipment supplier to deal directly with the Engineer or with the Agency with regard to a submittal. These dealings shall be limited to contract interpretations to clarify and expedite the Work. (c) Shop Drawings and Product Submittals (1) Wherever called for in the Contract Documents or where required by the Engineer, the Contractor shall furnish to the Engineer for review, five (5) copies plus one reproducible copy or electronic file,of each Shop Drawing or Product submittal. Shop Drawings may include detail design calculations, shop-prepared drawings, fabrication and installation drawings, erection drawings, lists, graphs,catalog sheets,data sheets,and similar items. If a list,graph,catalog sheet,data sheet,etc. includes more than one item, clearly mark which item is the subject of the submittal. Shop Drawings shall bear the signature and seal of an engineer registered in the appropriate branch and in the state of Oregon, unless otherwise indicated. Whenever the Contractor is required to submit design calculations as part of a submittal,such calculations shall bear the signature and seal of an engineer registered in the appropriate branch and in the state of Oregon, unless otherwise indicated. (2) Shop Drawing and Product submittals shall be accompanied by the Engineer's standard submittal transmittal form, a reproducible copy of which is available from the Engineer. A submittal without the form or where applicable items on the form are not completed will be returned for resubmittal. (3) Organization • A single submittal transmittal form shall be used for each technical specification section or item or class of material or equipment for which a submittal is required. A single submittal covering multiple sections will not be acceptable, unless the primary specification references other sections for components. Example: if a pump section references other sections for the motor, shop-applied protective coating, anchor bolts, local control panel, and variable frequency drive, a single submittal would be acceptable. A single submittal covering vertical turbine pumps and horizontal split case pumps would not be acceptable. • On the transmittal form, index the components of the submittal and insert tabs in the submittal to match the components. Relate the submittal components to specification paragraph and subparagraph,Drawing number,detail number,schedule title,room number, or building name, as applicable. • Unless indicated otherwise, terminology and equipment names and numbers used in submittals shall match those used in the Contract Documents. (4) Format 49 General Conditions Revised 01/27/2026 00160 Conformed to Bid Documents • Minimum sheet size shall be 8.5 inches by 11 inches. Maximum sheet size shall be 22 inches by 34 inches. Every page in a submittal shall be numbered in sequence. Each copy of a submittal shall be collated and stapled or bound,as appropriate. The Engineer will not collate sheets or copies. • Where product data from a manufacturer is submitted, clearly mark which model is proposed, with complete pertinent data capacities, dimensions, clearances, diagrams, controls,connections,anchorage,and supports. Sufficient level of detail shall be presented for assessment of compliance with the Contract Documents. • Each submittal shall be assigned a unique number. Submittals shall be numbered sequentially, and the submittal numbers shall be clearly noted on the transmittal. Original submittals shall be assigned a numeric submittal number (e.g., 25). If submittal "25" requires a resubmittal, the first resubmittal will bear the designation "25.A"and the second resubmittal will bear the designation "25.B"and so on. • If there is a follow-up submittal related to a previously submitted class of material or type of equipment (e.g., follow-up submittal to submittal "25"), it shall be assigned the number "25.1". If submittal "25.1" requires a resubmittal, the first resubmittal will bear the designation "25.1.A" and the second resubmittal will bear the designation "25.1.B" and so on. Disorganized submittals that do not meet the requirements of the Contract Documents will be returned without review. (5) Except as may otherwise be indicated, the Engineer will return prints of each submittal to the Contractor with comments noted thereon, within 21 Days following receipt by the Engineer. It is considered reasonable that the Contractor will make a complete and acceptable submittal to the Engineer by the first resubmittal on an item. The Agency reserves the right to withhold monies due to the Contractor to cover additional costs of the Engineer's review beyond the first resubmittal. Engineer's cost for submittal review beyond the first resubmittal is provided in the Special Provisions. The Engineer's maximum review period for each submittal or resubmittal will be 21 Days. (6) If a submittal is returned to the Contractor marked "NO EXCEPTIONS TAKEN,"formal revision and resubmission will not be required. (7) If a submittal is returned marked "MAKE CORRECTIONS NOTED," Contractor shall make the corrections on the submittal, but formal revision and resubmission will not be required,except where specifically required by Engineer as indicated on the submittal review form. (8) If a submittal is returned marked "AMEND-RESUBMIT,"the Contractor shall revise it and shall resubmit the required number of copies to the Engineer for review. Resubmittal of portions of multi- page or multi-drawing submittals will not be allowed. For example, if a Shop Drawing submittal consisting of 10 drawings contains one drawing noted as"AMEND-RESUBMIT,"the submittal as a whole is deemed "AMEND-RESUBMIT,"and 10 drawings are required to be resubmitted. (9) If a submittal is returned marked "REJECTED-RESUBMIT," it shall mean either that the proposed material or product does not satisfy the specification, the submittal is so incomplete that it cannot be reviewed, or is a substitution request not submitted in accordance with the General Conditions. In the first two cases,the Contractor shall prepare a new submittal and shall submit the required number of copies to the Engineer for review. In the latter case,the Contractor shall submit the substitution request according to the General Conditions. 50 General Conditions Revised 01/27/2026 00140 Conformed to Bid Documents (10)Resubmittal of rejected portions of a previous submittal will not be allowed. Every change from a submittal to a resubmittal or from a resubmittal to a subsequent resubmittal shall be identified and flagged on the resubmittal. (11)Fabrication of an item may commence only after the Engineer has reviewed the pertinent submittals and returned copies to the Contractor marked either "NO EXCEPTIONS TAKEN" or "MAKE CORRECTIONS NOTED". Corrections indicated on submittals shall be considered as changes necessary to meet the requirements of the Contract Documents and shall not be taken as changes to the Contract requirements. (12) Corrections or comments made on the Contractor's Shop Drawings during review do not relieve the Contractor from compliance with Contract Drawings and Specifications. Review is for conformance to the design concept and general compliance with the Contract Documents only. The Contractor is responsible for confirming and correlating quantities and dimensions, fabrication processes and techniques,coordinating Work with the trades,and satisfactory and safe performance of the Work. (d) Quality Control (QC)Submittals (1) Quality control submittals are defined as those required by the Specifications to present documentary evidence to the Engineer that the Contractor has satisfied certain requirements of the Contract Documents. (2) Unless otherwise indicated, QC submittals shall be submitted: • Before delivery and unloading,for the following types of submittals: o Manufacturers'installation instructions o Manufacturers'and Installers'experience qualifications o Ready mix concrete delivery tickets o Design calculations o Affidavits and manufacturers' certification of compliance with indicated product requirements o Laboratory analysis results o Factory test reports • For the following types of submittals, the manufacturer's field representative shall submit a draft certification prior to leaving the Project site and a final certification within seven days of the event documented: o Manufacturers'field representative certification of proper installation • Within 30 Days of the event documented for the following types of submittals: o Field measurement 51 General Conditions Revised 01/27/2026 00160 Conformed to Bid Documents o Field test reports o Receipt of permit o Receipt of regulatory approval (3) The Engineer will record the date that a QC submittal was received and review it for compliance with submittal requirements, but the review procedures above for Shop Drawings and samples will not apply. (e) Deferred Submittals to Agency (1) For the purposes of this section, Deferred Submittals are defined as those portions of the Project that are Contractor-designed and must be submitted to the Agency's building official for approval and to meet Building Permit plan review requirements. See Special Provisions (2) The Engineer will schedule a pre-submittal conference with the Contractor and Agency's building official to discuss proposed Deferred Submittal items, requirements, and review schedule. (3) The Contractor shall list the Deferred Submittals on the title or cover sheet of the Drawings for submission to the Agency and shall state the design criteria/assumptions of the Deferred Submittal items on the plans. Deferred Submittals shall include details for connection of materials to the structure and calculations showing that the specified structural requirements are met. (4) The Contractor shall submit Deferred Submittals to the Engineer for review for general conformance to the design of the structure. The Engineer is not responsible for coordination of Deferred Submittal components with Contract Documents. Review does not lessen nor shift burden or responsibility from Contractor or assigned subcontractor/supplier to the Agency or Engineer. The Engineer shall determine that the Deferred Submittals are in general conformance with the design, and shall forward the Deferred Submittals to the building official. Contractor is responsible, with no exceptions, to ensure that the Deferred Submittal review will not adversely affect Project's construction schedule. The Deferred Submittal items shall not be installed by the Contractor until the design and Deferred Submittals have been approved by the building official. (f) Effect of Review of Contractor's Submittals (1) Review of Contract drawings,methods of work,or information regarding materials or equipment the Contractor proposes to provide, shall not relieve the Contractor of its responsibility for errors therein and shall not be regarded as an assumption of risks or liability by the Agency,or by any officer or employee thereof, and the Contractor shall have no claim under the contract on account of the failure,or partial failure, of the method of work, material, or equipment so reviewed. An indication of "NO EXCEPTIONS TAKEN" or "MAKE CORRECTIONS NOTED" shall mean that the Agency or Engineer has no objection to the Contractor, upon its own responsibility, using the plan or method of Work proposed, or providing the materials or equipment proposed. 00150.37 Equipment Lists and Other Submittals-The Contractor shall submit Equipment lists, and other required submittals for approval by the Engineer. With each submittal,the Contractor shall clearly identify the applicable specification sub-section and the product make, model,size and proposed options. 00150.40 Cooperation and Superintendence by the Contractor-The Contractor is responsible for full management of all aspects of the Work, including superintendence of all Work by Subcontractors, Suppliers, and other providers. The Contractor shall appoint a single Superintendent and may also appoint alternate Superintendents as necessary to control the Work. The form of appointment of the alternate shall state, in 52 General Conditions Revised 01/27/2026 00140 Conformed to Bid Documents writing, the alternate's name, duration of appointment in the absence of the Superintendent, and scope of authority. The Contractor shall: • Provide for the cooperation and superintendence on the Project by: • Furnishing the Engineer all data necessary to determine the actual cost of all or any part of the Work, added Work, or changed Work. • Allowing the Engineer reasonable access to the Contractor's books and records at all times. To the extent permitted by public records laws, the Engineer will make reasonable efforts to honor the Contractor's request for protection of confidential information. • Keeping one complete set of Contract Documents on the Project Site at all times, available for use by all the Contractor's own organization, and by the Engineer if necessary. • Appoint a single Superintendent and any alternate Superintendent who shall meet the following qualifications: • Appointees shall be competent to manage all aspects of the Work. • Appointees shall be from the Contractor's own organization. • Appointees shall have performed similar duties on at least one previous project of the size, scope and complexity as the current Contract. • Appointees shall be experienced in the types of Work being performed. • Appointees shall be capable of reading and thoroughly understanding the Contract Documents. • The appointed single Superintendent, or any alternate Superintendent shall: • Be present for all On-Site Work, regardless of the amount to be performed by the Contractor, Subcontractors, Suppliers, or other providers, unless the Engineer provides prior approval of the Superintendent's or alternate Superintendent's absence. • Be equipped with a two-way radio or cell phone capable of communicating throughout the project during all the hours of Work on the Project Site and be available for communication with the Engineer. • Have full authority and responsibility to promptly execute orders or directions of the Engineer. • Have full authority and responsibility to promptly supply the Materials, Equipment, labor, and Incidentals required for performance of the Work. • Coordinate and control all Work performed under the Contract, including without limitation the Work performed by Subcontractors, Suppliers, and Owner and operators. • Diligently pursue progress of the Work according to the schedule requirements of Section 00180. • Cooperate in good faith with the Engineer, Inspectors, and other contractors in performance of the Work. • Provide all assistance reasonably required by the Engineer to obtain information regarding the nature, quantity, and quality of any part of the Work. • Provide access,facilities and assistance to the Engineer in establishing such lines,grades and points as the Engineer requires. • Carefully protect and preserve the Engineer's benchmarks and horizontal control locations, including marks and stakes. Any Superintendent or alternate Superintendent who repeatedly fails to follow the Engineer's written or oral orders, directions, instructions,or determinations, shall be subject to removal from the Project. If the Contractor fails or neglects to provide a Superintendent, or an alternate Superintendent, and no prior approval has been granted,the Engineer has the authority to suspend the Work according to 00180.70. Any continued Work by the Contractor, Subcontractors, Suppliers, or other providers may be subject to rejection 53 General Conditions Revised 01/27/2026 00160 Conformed to Bid Documents and removal. The Contractor's repeated failure or neglect to provide the superintendence required by these provisions constitutes a material breach of the Contract,and the Engineer may impose any remedies available under the Contract, including, but not limited to, Contract termination. 00150.50 Cooperation with Utilities: (a) General-As specified in the Special Provisions or as shown on the Plans, existing Utilities requiring adjustment may be adjusted by the Utility before,during,or after Project construction. "Adjustment of Utilities" shall mean the alteration, improvement, connection, disconnection, relocation, or removal of existing Utility lines,facilities, or systems in temporary or permanent manner. (b) Agency's Responsibilities-Before Bids are received, the Agency will make preliminary arrangements for planned Adjustment of Utilities. The Agency will list in the Special Provisions the estimated completion dates or times for adjustment work by the Utility owner, and will include a general statement describing any relocation. The Plans will not normally show the anticipated new location of Utilities that have been or will be adjusted. (c) Contractor's Responsibilities-The Contractor shall: • Follow applicable rules adopted by the Oregon Utility Notification Center; • Contact Utility owners during Bid preparation and after the Contract is awarded to verify all Utilities' involvement on the Project Site; • Coordinate Project construction with the Utilities' planned adjustments, take all precautions necessary to prevent disruption of Utility service, and perform its Work in the manner that results in the least inconvenience to the Utility owners; • Include all Utility adjustment work, whether to be performed by the Contractor or the Utilities, on the Contractor's Project Work schedule submitted under 00180.41; • Protect from damage or disturbance any Utility that remains within the area in which Work is being performed. Maintain and re-establish location marks according to OAR 952-001-0090(3)(a). Coordinate re-establishment of the location marks with the associated Utility; • Not disturb an existing Utility if it requires an unanticipated adjustment, but shall protect the Utility from damage or disturbance and promptly notify the Engineer; • Determine the exact location before excavating within the tolerance zone according to OAR 952-001-0090(3)(c); • Backfill any exposed Utilities as recommended and approved by the Utility representative. Obtain Utility locate warning tape from the Utility and replace damaged or removed warning tape. Utility locate warning tape may not be present at all existing Utilities; • Stake, place warning tape, and maintain no work limits around critical Utility facilities as shown or directed by the Engineer and the Utility; • In addition to the notification required in OAR 952-001-0090(6), notify the Engineer and the Utility as soon as the Contractor discovers any previously unknown Utility conflicts or issues. Contrary to the OAR, stop excavating until directed by the Engineer and allow the Utility a minimum of two weeks to relocate or resolve the previously unknown Utility issues; and • Report to the Engineer any Utility owner who fails to cooperate or fails to follow the planned Utility adjustment. Subject to the Engineer's approval, the Contractor may propose adjustments to the Utilities by asking the Utility owners to move, remove, or alter their facilities in ways other than as shown on the Plans or in the Special Provisions. The Contractor shall conduct all negotiations, make all arrangements, and assume all costs that arise from such changes. 54 General Conditions Revised 01/27/2026 00140 Conformed to Bid Documents (d) Notification—This Project is located within the area served by the Oregon Utility Notification Center,area which is a Utilities notification system for notifying owners of Utilities about Work being performed in the vicinity of their facilities. The Utilities notification system telephone number is 811 (or use the old number which is 1-800-332-2344. The Contractor shall comply with the rules of the Oregon Utility Notification Center, OAR 952-001-0010 through OAR 952-001-0090, and ORS 757.993. The Contractor may contact the Oregon Utility Notification Center at 503-232-1987 about these rules. 00150.53 Utilities and Existing Improvements: (a) General — Information shown on the Plans as to the location of existing water courses and utilities has been compiled from available sources and may not be accurate. The Contractor shall determine the location and nature of affected water courses, utilities and underground improvements prior to commencing Work. The Contractor shall provide for the flow of water courses and essential utilities that may be interrupted during the progress of the Work and shall restore such water courses or utilities after completion of the Work. The Contractor shall be responsible for exploratory excavations as it deems necessary to determine the exact locations and depths of utilities which may interfere with Work. All such exploratory excavations shall be performed as soon as practicable after Notice to Proceed and, in any event, a sufficient time in advance of construction to avoid possible delays to the Contractor's progress. When such exploratory excavations show the utility location as shown on the Plans to be in error,the Contractor shall so notify the Engineer. The number of exploratory excavations required shall be that number which is sufficient to determine the alignment and grade of the utility. Unless otherwise provided in the Special Provisions, all potholing and exploratory work shall be incidental to the Work and no separate payment shall be made therefore. The Contractor shall coordinate project construction with the adjustment of utilities, take all necessary precautions to prevent disturbing the utilities, and perform work so that utility owners and users are caused a minimum of inconvenience. The Contractor shall protect underground utilities and other improvements which may be impaired during construction operations, regardless of whether or the not the utilities are indicated on the Plans. The Contractor shall take all possible precautions for the protection of unforeseen utility lines to provide for uninterrupted service and to provide such special protection as may be necessary. To ease or streamline the work,the Contractor may desire to adjust the utilities by asking the utility owners to move, remove, or alter their equipment in ways other than those shown on the Plans or in the Contract Documents. The Contractor shall conduct the negotiations, make the arrangements, and pay all costs that arise from such changes. (b) Utilities to be Removed or Relocated — Where the proper completion of the Work requires the temporary or permanent removal and/or relocation of the property of any public utility or franchise holder,such utility company or franchise holder shall be notified by the Contractor to remove or relocate such property within a specified reasonable time. When utility lines that are to be removed or relocated are encountered within the area of operations,the Contractor shall notify the utility company and the Engineer a sufficient time in advance for the necessary measures to be taken to prevent the interruption of service. (c) Underground Utilities and Improvements Indicated — Existing utility lines and underground improvements that are indicated or the locations of which are made known to the Contractor prior to excavation and that are to be retained, and all utility lines and underground improvements that are encountered during excavation operations shall be protected from damage during excavation and backfilling and, if damaged, shall be immediately repaired or replaced by the Contractor, unless otherwise repaired by the owner of 55 General Conditions Revised 01/27/2026 00160 Conformed to Bid Documents damaged utility. If the owner of the damage facility performs its own repairs, the Contractor shall reimburse said owner for the costs of repair. (d) Underground Utilities and Improvements Not Indicated— In the event that the Contractor damages existing utility lines or underground improvements that are not indicated in the Plans or marked in the field, or are not indicated or marked with reasonable accuracy, or the locations of which are not made known to the Contractor prior to excavation,the Contractor shall immediately provide a verbal report of such damage to the Engineer,and provide a written report thereof promptly thereafter. The Contractor shall immediately notify the owner of the damaged utility. If directed by the Engineer, repairs shall be made by the Contractor under the provisions for changes and extra work contained in the General Conditions. This subsection applies only to public main line utilities. For service lines to private property, see Subsection 00150.53(e). For purposes of this section, "reasonable accuracy" is defined as within two (2)feet from the outside lateral dimensions of both sides of an underground utility or facility from actual location. No representation shall be made concerning the accuracy of vertical elevations of existing utilities, even if indicated in the plans, and no additional payment will be made for damage to utilities encountered at depths differing from those indicated. (e) Underground Services Indicated or Not—If service lines are encountered,whether shown, marked or not,the Contractor shall take precautions to carefully work around them and repair them if they are damaged by the Contractor,at no additional cost to the Agency. For purposes of this subsection,service lines to private property are defined as: • Sanitary sewer service laterals of 6-inch diameter or less • Water service lines of 2-inch diameter or less. (f) Approval of Repairs—All repairs to a damaged utility or improvement shall be inspected and approved by an authorized representative of the utility or improvement owner,and accepted by the Agency before being concealed by backfill or other Work. (g) Agency's Right of Access—The right reserved to the Agency and to the owners of public utilities and franchises to enter at any time upon any public street, alley, right-of-way, or easement for the purpose of making changes in their property made necessary by the Work of this Contract. 00150.55 Cooperation with Other Contractors -The Agency reserves the right to perform other work on or near the Project Site, including, without limitation, any Materials site, with forces other than those of the Contractor. See Special Provisions If such work takes place on or near the Project Site,the Contractor shall have the following obligations: • The Contractor shall coordinate Work with other contractors or forces. • The Contractor shall cooperate in good faith with all other contractors or forces. • The Contractor shall perform the Work specified in the Contract in a way that will minimize interference and delay for all forces involved. • The Contractor shall place and dispose of the Materials being used so as not to interfere with the operations of other forces. • The Contractor shall join the Work with that of other forces in a manner acceptable to the Engineer or the Agency, and shall perform it in the accepted sequence with the work of the other force. The Engineer will resolve any disagreements under this Subsection that may arise among the Contractor and other work forces, or between the Contractor and the Agency. The Engineer's decision in these matters is final, as provided in 00150.00. 56 General Conditions Revised 01/27/2026 00140 Conformed to Bid Documents When the schedules for Work of the Contractor and the work of other forces overlap,each contractor involved shall submit a current,realistic progress schedule to the Engineer. Before the Engineer accepts the schedule, each party shall have the opportunity to review all schedules. After this review and any necessary consultations,the Engineer will determine acceptable schedules. The Contractor waives any right it may have to make claims against the Agency for any damages or claims that may arise because of inconvenience,delay,or loss due solely to the presence of other contractors working on or near the Project Site. If the Contract gives notice of work to be performed by other forces that may affect the Contractor's Work under the Contract, the Contractor shall include any costs associated with coordination of the Work in the appropriate Pay Item or as a portion of a Pay Item. In an emergency, the Contractor most immediately able to respond may repair a facility or Utility of another contractor in order to prevent further damage to the facility, Utility, or other Structure as a result of the emergency. 00150.60 Construction Equipment Restrictions: (a) Load and Speed Restrictions for Construction Vehicles and Equipment- The Contractor shall comply with legal weight and speed restrictions when moving Materials or Equipment beyond the limits of the Project Site. The Contractor shall control vehicle and Equipment loads and speeds within the Project Site according to the following restrictions, unless the Special Provisions provide otherwise: • The Contractor shall restrict loads and speeds as necessary to avoid displacement or loss of Materials on Subgrades and Aggregate Bases. • The Contractor shall restrict weights to legal loads, and shall travel at speeds of no more than 45 mph or the posted construction speed, whichever is less, on treated Bases, Pavement, or wearing Courses. • The Contractor shall not cross Bridges or other Structures with Equipment or vehicles exceeding the legal load limit without prior written permission of the Engineer. The Contractor shall make any such request in writing,describing the loading details and the arrangement,movement,and position of the Equipment on the Structure. The Contractor shall comply with any restrictions or conditions included in the Engineer's written permission. (b) Protection of Buried Items-The Contractor shall use temporary fill or other methods to avoid overload of pipes, box culverts, and other items that are covered, or to be covered, by fill or backfill. (c) Responsibility for Damages-The Contractor shall assume responsibility for damages caused by excessive Equipment speed or loads while performing the Work, both inside and outside the Project Site. The Engineer's permission to cross Bridges and other Structures, according to 00150.60(a), will not relieve the Contractor from responsibility for load-caused damages. 00150.70 Detrimental Operations-The Contractor shall avoid operations whose methods, conditions, or timing may injure people or damage property or the Work. Damage may include, without limitation, staining surfaces with mud or asphalt, or damaging utilities and, structures, or foundations. (See also 00150.60, 00150.75, and Section 00170) When any such damage occurs, the Engineer will determine if it is to be corrected by repair, replacement, or compensatory payment by the Contractor. If compensatory payment is required, the Engineer will determine the amount. Compensatory payment may be deducted from monies due or to become due to the Contractor under the Contract. 57 General Conditions Revised 01/27/2026 00160 Conformed to Bid Documents 00150.75 Protection and Maintenance of Work During Construction -The Contractor shall protect and maintain the Work during construction and until Third Notification has been issued, unless otherwise provided in the Contract. For the purposes of this Subsection, "maintenance" shall include measures to prevent deterioration of Roadway and Structures at the Project Site, and to keep them in good condition at all times during the prosecution of the Work. The Contractor shall continuously allocate sufficient Equipment and workers to achieve such maintenance. If the Contract requires the placement of a Course upon a previously constructed Course or Subgrade, the Contractor shall maintain the previous Course or Subgrade during all construction operations. The Contractor shall include costs of protecting and maintaining the Work during construction in the unit prices bid for the various Pay Items. The Contractor will not be paid an additional amount for this Work, unless otherwise specified. The Engineer will timely notify the Contractor of the Contractor's noncompliance with this Subsection. If the Contractor fails to remedy unsatisfactory protection or maintenance within 24 hours after receipt of such notice, the Engineer may proceed to remedy the deficiency,and deduct the entire cost from monies due or to become due the Contractor under the Contract. 00150.80 Removal of Unacceptable and Unauthorized Work-The Contractor shall correct or remove unacceptable Work and remove unauthorized work, as directed by the Engineer in writing. The Contractor shall replace such work with Work and Materials conforming to the requirements of the Contract. For the purposes of this Subsection, "unauthorized work"shall include without limitation the following: • Work that extends beyond lines shown on the Plans or otherwise established by the Engineer; • Work that is contrary to the Engineer's instructions; and • Work that is conducted without the Engineer's written authorization. The Agency will not pay the Contractor for unacceptable Work, except as provided in 00150.25, or for unauthorized work. The Engineer may issue a written order for the correction or removal of such work at the Contractor's sole expense. If, when ordered by the Engineer, the Contractor fails to correct or remove unacceptable Work or remove unauthorized work, the Engineer may have the correction, removal, or removal and replacement, done by others and deduct the entire cost from monies due or to become due the Contractor under the Contract. 00150.90 Final Inspection: (a) On-site Construction Work-The Engineer will inspect the Project at a time close to the completion of On-Site Work for Contractor's compliance with the Contract Documents. When all On-Site Work on the Project is completed, including, but not limited to, Change Order Work and Extra Work, the Engineer will issue Second Notification as specified in 00180.50(g), including notification of required corrective work(punch list)to be completed prior to Engineer's issuance of Third Notification (Final Completion). Within 15 Calendar Days after the Engineer receives the Contractor's written notification that all punch list items, final trimming and cleanup according to 00140.90 have been completed, the Engineer will review the Project and notify the Contractor that all Work is complete, or within 15 Calendar Days of inspection will give the Contractor written instruction regarding incomplete or unsatisfactory Work. (b) All Contract Work-The Engineer will issue the Third Notification when the Contractor has satisfactorily accomplished all of the following: 58 General Conditions Revised 01/27/2026 00140 Conformed to Bid Documents • The Contractor has completed all On-Site Work required under the Contract, including the punch list items from (a)above; • The Contractor has removed all Equipment,other than that incorporated into the Work; and • The Contractor has submitted all required certifications,bills,forms,warranties and other documents. • The Contractor has submitted complete and acceptable"As-Built"drawings as specified in 00140.95. • Contractor has submitted the Final GFE Form 3 to cover all punch list item work. 00150.91 Post-Construction Review-The Contractor or the Engineer may request a Post-Construction Review meeting, to be held at a time prior to issuance of Third Notification but not earlier than 15 Days following the date of Second Notification. The meeting may be held if agreed to by both parties. The party making the request will conduct the meeting, and will announce the time and place of the meeting at least 15 Days prior to the meeting date. The purpose of this meeting is to examine the Project for possible process improvements that may benefit future projects. 00150.95 Final Acceptance-After the Engineer completes Final Inspection of all Work including all corrective work identified by the Agency during the Correction Period, the Agency will acknowledge Final Acceptance. The Agency will notify the Contractor in writing of the date of Final Acceptance within seven Calendar Days after Final Acceptance, or as soon thereafter as is practicable. 00150.96 Maintenance Warranties and Guarantees-Prior to Third Notification, the Contractor shall transfer to the Agency all unexpired manufacturers', suppliers' and installers' warranties and guarantees for Materials and Equipment installed on the Project. Such warranties and guarantees shall recite that they are enforceable by the Agency. 00150.97 Responsibility for Materials and Workmanship: (a) The Contractor shall perform the Work according to the terms, conditions, and requirements of the Contract. (b) Whether before or after the Agency's Final Acceptance of the Work, the Contractor shall be responsible for: • Correcting or repairing any defects in, or damage to, the Work that results from the use of improper or defective materials or workmanship; or • Replacing, in its entirety, the Work affected by the use of improper or defective materials or workmanship to the extent provided by law; and • Correcting or repairing any Work, Materials, Structures, Existing Surfacings, Pavement, Utilities, or sites, including, without limitation, Wetlands, damaged or disturbed in that correction, repair, or replacement. (See 00170.80 to 00170.85) (c) Full or partial termination of the Contract under 00180.90 shall not relieve the Contractor of responsibility for completed or performed Work,or relieve the Contractor's Surety of the obligation for any just claims arising from the completed or performed Work. Section 00160 -Source of Materials 00160.00 Definitions-The following definitions apply to Section 00160: 59 General Conditions Revised 01/27/2026 00160 Conformed to Bid Documents (a) Prospective Source-Agency-furnished Materials source,use of which by the Contractor is optional. The Agency makes no guarantee or representation, by implication or otherwise, of the land use status, quantity, quality, or acceptability of Materials available from it, except as may be stated in the Special Provisions. (b) Mandatory Source-Agency-furnished Materials source, use of which by the Contractor is required. (c) Blue Sheets- Prequalified products and submittals for qualification of electrical equipment and materials. (d) Green Sheets-Conditionally prequalified products and submittals for conditional qualification of controller equipment. (e) Red Sheets-Statewide list of certification exempt traffic management systems components pursuant to ORS 479.540 and OAR 918-261-0037. 00160.01 Notification of Source of Supply and Materials: (a) All Materials-The Contractor shall notify the Engineer in writing of all proposed Materials sources of supply, including,without limitation, any steel or other fabricators within the following time frames: • At least 15 Calendar Days before using or fabricating Materials, if the source is within the State; or • At least 45 Calendar Days before using or fabricating Materials, if the source is outside the State The Contractor shall identify if the material source is a DBE or non-DBE. For DBE Suppliers, the Contractor shall identify an estimated value of the materials to be supplied. For each committed DBE Supplier, the Contractor shall submit a copy of the materials purchase order or supply agreement. For non-committed DBE suppliers, when the estimated value is over $10,000, the Contractor shall submit a copy of the materials purchase order or supply agreement. For this purpose, a committed DBE firm is one that was identified by the Contractor to meet an assigned DBE goal, including DBE firms substituting for DBE firms committed as a condition of Contract Award. (b) Prospective Source Materials-When given an option to use Prospective Sources of Materials to be incorporated into the Work, the Contractor shall notify the Engineer in writing of the option selected within 15 Calendar Days from date of Notice to Proceed. Otherwise, such Materials sources may become unavailable. (c) Approval Required- Before allowing production or delivery of Materials to begin from any source, the Contractor must obtain the Engineer's approval. Approval to use any source does not imply that Materials from that source will be accepted. If approved sources do not provide Materials that meet Specifications,the Materials will be rejected. The Contractor will then be responsible for locating other sources and obtaining the Engineer's approval. (d) Terms Required-The Contractor shall comply with 00170.07. 00160.05 Qualified Products List (QPL)-The QPL is a listing of manufactured products available on the market (shelf items) that ODOT has evaluated and found suitable for a specified use in construction. The QPL is available from ODOT's Construction Section website(see 00110.05(e)). The most current published PDF version of the QPL on ODOT's Construction Section website at the time of the Invitation for Bids advertisement shall be the version in effect for the Project. The Engineer may approve for use a conditionally qualified product, or a product qualified for inclusion in a later edition of the QPL, if the Engineer determines the product is acceptable for the Project. Use of listed products shall be restricted to the category of use for which they are listed. The Contractor shall install all products as recommended by the manufacturer. The Contractor shall replace qualified products not conforming to Specifications or not properly handled or installed at no additional cost to the Agency. 60 General Conditions Revised 01/27/2026 00165 Conformed to Bid Documents 00160.07 Electrical Equipment and Materials: The Blue Sheets and Green Sheets are a listing of manufactured products available on the market (shelf items) that ODOT has evaluated and found suitable for use as electrical and controller equipment and materials for construction. The Blue Sheets and Green Sheets are available on the ODOT Traffic-Standards website (see 00110.05(e)). The most current version of the Blue Sheets and Green Sheets on the date of Advertisement is the version in effect for the Project. When the Contract specifies the use of the Blue Sheets and Green Sheets, unless specified as the subject of an exemption per ORS 279C.345,the Agency may approve for use a product qualified for inclusion in a later edition of the Blue Sheets and Green Sheets or other equivalent product that meets the requirements of the Blue Sheets, following the Blue Sheet Qualification/Specification Information, or the Green Sheets, following the Green Sheet Qualification/Specification Information , if the Agency finds the product acceptable for use on the Project. Use of listed products shall be restricted to the category of use for which they are listed. The Contractor shall install all products as recommended by the manufacturer. The Contractor shall replace qualified products not conforming to the Specifications or not properly handled or installed at no additional cost to the Agency. 00160.10 Ordering, Producing, and Furnishing Materials-The Contractor shall not place orders for or produce full quantities of Materials anticipated to be required to complete the Work until the Work has advanced to a stage that allows the quantities to be determined with reasonable accuracy. (a) Contractor's Duties-In purchasing, producing, or delivering Materials, the Contractor shall take into account the following: • Kind of work involved; • Amount of work involved; • Time required to obtain Materials; and • Other relevant factors. (b) Quantity of Materials-Materials quantities shown on the Plans,or indicated by quantities and Pay Items, are subject to change or elimination. The Contractor is responsible for payment for excess Materials delivered to the Project Site or storage sites. Unless otherwise specified in the Contract, the Agency will not be responsible for: • Materials the Contractor may deliver or produce in excess of Contract requirements; • Extra expense the Contractor may incur because Materials were not ordered or produced earlier;or • The Contractor's expenses related to Materials ordered by the Contractor that are not subsequently approved for use. 00160.20 Preferences for Materials: (a) Buy America- If federal highway funds are involved on the Project,the Contractor shall limit the quantity of foreign Materials incorporated into the Work as follows. Section 635.410 of Title 23, Code of Federal Regulations, and the Intermodal Surface Transportation Efficiency Act require that all iron or steel manufacturing processes, including, without limitation, the casting of ingots, for iron or steel Materials permanently incorporated into the Project shall occur in the United States, unless the cost of foreign-origin iron or steel Materials does not exceed one-tenth of one percent (0.1%) of the Contract Amount or$2,500, whichever is greater. The Contractor shall not incorporate foreign-origin iron or steel Materials in excess of this amount into the Project. All foreign-origin iron or steel Materials incorporated in the Project in excess of the amount indicated above shall be removed and replaced with domestic iron or steel Materials at the Contractor's expense. For purposes of this Specification,the cost of foreign-origin iron or steel Materials shall be the value of the iron or steel products as of the date they are delivered to the Project Site. 61 General Conditions Revised 01/27/2026 00160 Conformed to Bid Documents Manufacturing processes include without limitation the application of coatings to finished iron or steel products or components. Coatings include epoxy coating, galvanizing, painting, and any other coating that protects or enhances the value of the steel or iron product or component. The Contractor shall provide the Engineer with a Certificate of Materials Origin, on a form furnished by the Engineer, before incorporating any iron or steel products into the Project. Unless a Certificate of Materials Origin has been provided to the Engineer,the Materials shall be considered of foreign origin. The Contractor shall retain manufacturers'certificates verifying the origin of all domestic iron or steel Materials for 3 years after the date of final payment for the Project,and shall furnish copies to the Engineer upon request. See Special Provision The Contractor shall include this provision in all subcontracts. (b) Buy Oregon -According to ORS 279A.120, the Contractor shall give preference to goods or services produced in Oregon if price, fitness, availability, and quality are equal. This provision does not apply to Contracts financed wholly or in part by federal funds. (c) Recycled Materials-According to ORS 279A.010,ORS 279A.125,ORS 279A.145,ORS 279A.150,and ORS 279A.155,and subject to the approval of the Engineer,the Contractor shall use recycled products to the maximum extent economically feasible. (d) Build America Buy America Act Requirements- If federal highway funds are involved on the Project, the Contractor shall comply with the Build America Buy America Act and implementing regulations (Infrastructure Investment and Jobs Act ("IIJA"), Pub. L. No. 117-58, which includes the Build America, Buy America Act("the Act"). Pub. L. No. 117-58, Sections 70901-70941). The Build America Buy America Act requirements apply to construction materials permanently incorporated in the Project. All construction materials permanently incorporated in the Project must be produced in the United States. Construction materials include an article, Material, or supply that is or consists primarily of only one of the following,with the standard for the material to be considered "produced in the United States": • Non-ferrous metals-All manufacturing processes, from initial smelting or melting through final shaping, coating, and assembly, occurred in the United States. • Plastic and polymer-based products (including polyvinylchloride, composite building materials, and polymers used in fiber optic cables)-All manufacturing processes, from initial combination of constituent plastic or polymer-based inputs, or, where applicable, constituent composite materials, until the item is in its final form, occurred in the United States. • Glass(including optic glass)-All manufacturing processes,from initial batching and melting of raw materials through annealing,cooling, and cutting,occurred in the United States. • Fiber optic cable(including drop cable)-All manufacturing processes,from the initial ribboning (if applicable), through buffering, fiber stranding and jacketing, occurred in the United States. All manufacturing processes also include the standards for glass and optical fiber, but not for non-ferrous metals, plastic and polymer-based products, or any others. • Optical fiber-All manufacturing processes, from the initial preform fabrication stage through the completion of the draw, occurred in the United States. • Lumber-All manufacturing processes, from initial debarking through treatment and planning, occurred in the United States. • Drywall-All manufacturing processes,from initial blending of mined or synthetic gypsum plaster and additives through cutting and drying of sandwiched panels, occurred in the United States. 62 General Conditions Revised 01/27/2026 00165 Conformed to Bid Documents • Engineered wood-All manufacturing processes from the initial combination of constituent materials until the wood product is in its final form, occurred in the United States. The classification of an article, material, or supply as construction material is based on its status at the time it is brought to the work site for incorporation in the Project. In general,the work site is the location of the Project at which the construction materials will be incorporated. Manufactured products assembled outside the Project Site are not subject to the Build America Buy America requirements. Manufactured products means articles, materials, or supplies that have been: • Processed into a specific form and shape; or • Combined with other articles, materials, or supplies to create a product with different properties than the individual articles, materials, or supplies. The USDOT issued a Public Interest Waiver for De Minimis Costs and Small Grants. The final waiver can be viewed here: https://www.federalregister.gov/documents/2023/08/16/2023-17602/waiver-of-buy-america-requirements-for- de-minimis-costs-and-small-grants and this waiver applies to Materials covered by the Build America Buy America Act. The public interest waiver is for manufactured products and construction materials for which: • The total value of the non-compliant products (foreign or unknown origin) is no more than the lesser of$1,000,000 or 5%of total applicable costs for the project*;or • The total amount of Federal financial assistance applied to the project,through awards or subawards, is below$500,000. *The "total value of the non-compliant products" includes construction materials only. The "total applicable costs"includes construction materials, iron and steel, and manufactured products. The value of materials are the actual cost of the materials, not the anticipated cost of materials. Furthermore, this bullet does not apply to iron and steel subject to the requirements of 23 U.S.C. 313. The de minimis threshold in 23 CFR 635.410(b)(4)continues to apply for steel and iron. (See 00160.20(a).) Strict compliance with the Build America, Buy America domestic preferences is required, except to the extent the above public interest waiver applies.The Contractor shall not incorporate construction materials in excess of this amount into the Project. All foreign origin construction Materials incorporated in the Project in excess of the amount indicated above shall be removed and replaced with domestic construction Materials at the Contractor's expense. All of the manufacturing processes must occur in the United States for the applicable construction materials permanently incorporated in the Project as listed below. Construction materials include an article, Material, or supply that is or consists primarily of: • non-ferrous metals; • plastic and polymer-based products (including polyvinylchloride, composite building materials, and polymers used in fiber optic cables); • glass; • lumber; or • drywall. The Contractor shall provide the Engineer with a Certificate of Materials Origin, on a form furnished by the Engineer, before incorporating any applicable construction materials into the Project. Unless a Certificate of 63 General Conditions Revised 01/27/2026 00160 Conformed to Bid Documents Materials Origin has been provided to the Engineer,the products and Materials shall be considered of foreign origin. No de minimis amount has been established for applicable construction materials permanently incorporated into the Project. Strict compliance is required. The Contractor shall retain manufacturers' certificates verifying the origin of all applicable construction materials for 3 years after the date of final payment for the Project, and shall furnish copies to the Engineer upon request. Manufactured products assembled outside the Project Site are not subject to the Build America Buy America requirements. Manufactured products are items that consist of two or more of the listed construction materials that have been combined together through a manufacturing process, and items that include at least one of the listed construction materials combined with a Material that is not listed through a manufacturing process, and should be treated as manufactured products, rather than as construction materials. Iron and steel Materials and manufactured products that are predominately iron or steel are subject to 00160.20(a). The Contractor shall include this provision in all subcontracts. 00160.21 Cargo Preference Act Requirements- If federal highway funds are involved on the Project, the Contractor shall comply with the Cargo Preference Act and implementing regulations (46 CFR Part 381)for use of United States flag ocean vessels transporting materials or equipment acquired specifically for the Project. Strict compliance is required, including, but not limited to, the clauses in 46 CFR 381.7(a) and (b), which are incorporated by reference. The Contractor shall also include this provision in all subcontracts. 00160.30 Agency-Furnished Materials- Unless otherwise specified in the Special Provisions, Materials listed as Agency-furnished will be available to the Contractor free of charge. The Contractor shall be responsible for all Materials furnished by the Agency and shall pay all demurrage and storage charges. The Contractor shall replace at its expense Agency-furnished Materials lost or damaged due to any cause. The locations at which Agency-furnished Materials are available will be specified in the Special Provisions. If the locations are not listed in the Special Provisions, the Agency-furnished Materials will be furnished to the Contractor at the Project Site. In either case, all costs of handling, hauling, unloading, and placing Agency- furnished Material shall be considered included in the price paid for the Pay Item involving such Material. All Agency-furnished Materials not incorporated into the Work remains the property of the Agency. The Contractor shall deliver such Materials as directed by the Engineer. 00160.50 Agency-Controlled Land; Limitations and Requirements: (a) General-The Contractor shall have no property rights in, or right of occupancy on, Agency-Controlled Land. Nor shall the Contractor have the right to sell, use, remove, or otherwise dispose of any material from Agency-Controlled Land, areas, or property, except as specified in the Special Provisions or by the written authorization of the Engineer. Unless authorized in the Contract, the Contractor shall not disturb any material within Rights-of-Way without written authorization from the Engineer. Unless otherwise specified in the Contract, the ownership of all materials originating on Agency-Controlled Lands will at all times vest in,and remain within the control of, the Agency. 64 General Conditions Revised 01/27/2026 00165 Conformed to Bid Documents (b) Waste, Excess, and By-Product Materials-All waste, excess, and by-product materials, collectively referred to in this Subsection as"By-Products",from the manufacture or production of Materials from Agency- Controlled Lands shall remain Agency property. Unless otherwise ordered by the Engineer in writing, By-Products shall be placed as required in the Special Provisions: • In stockpiles at designated locations; • At locations and in shapes that are readily accessible; and • In such a manner as to avoid fouling areas containing useable materials, or interfering with future plant setups to use materials from the property. The Agency will not compensate the Contractor for handling and stockpiling By-Products according to the Special Provisions requirements. If by written order the Engineer directs the Contractor to stockpile or place designated By-Products at alternate sites,the By-Products designated shall be loaded,hauled,and placed as directed, and this work will be paid for according to 00195.20. 00160.60 Contractor-Furnished Materials and Sources:: (a) General-The Contractor shall furnish, at its own expense, all products and Materials required for the Project from sources of its own choosing, unless such sources have been specified in the Special Provisions or Plans as Prospective or Mandatory Sources. (b) Acquisition of Sources-The Contractor shall acquire, at its own expense, the rights of access to, and the use of, all sources the Contractor chooses that are not Agency-controlled and made available by the Agency to the Contractor. (c) Additional Requirements- Except for continuously-operated commercial sources,Work shall not begin, nor will any Materials be accepted by the Engineer, until the Contractor has: (1) Given to the Engineer a copy of permits from, or proof that permits are not required from: • The Department of Geology and Mineral Industries, as required under ORS 517.790; • The Department of State Lands, as required under ORS 196.815 (when removing material from the bed or banks of any waters or from any Wetland); and • Local governmental authorities having jurisdiction over land use at the source location. (2) Furnished to the Engineer written approval of the property owner, if other than the Contractor, for the Contractor's proposed plans of operation in, and reclamation of, the source. The Contractor shall include in the document containing the property owner's written approval a summary of the requirements of the permits described above,which shall be subject to the Engineer's approval. 00160.70 Requirements for Plant Operations-Before operating mixing plants, Rock crushers, or other Equipment, the Contractor shall provide the Engineer copies of all applicable discharge permits for noise, air contaminants,and water pollutants from DEQ or applicable local jurisdictions,or a letter from DEQ or the local jurisdiction stating that no permits are required for the use of the Equipment and sites. 00160.80 Requirements for Sources of Borrow and Aggregate-The Contractor shall conduct operations according to all applicable federal, State, and local laws (including, without limitation, ORS 517 and OAR 632-030)when developing, using, and reclaiming all sources of Borrow material and Aggregate. The Contractor shall provide erosion control at Borrow sources that are not within the Project Site. The Contractor shall not operate in Wetlands except as allowed by permit. The Contractor shall comply with all requirements for pollution and sediment control, including, without limitation, the National Pollutant Discharge Elimination System where applicable. Except for continuously-operated commercial sources,the Contractor shall also conform to the following: 65 General Conditions Revised 01/27/2026 00160 Conformed to Bid Documents (a) If a natural growth of trees or shrubs is present, preserve a border of such to conceal land scars. (b) Excavate Borrow sources and Aggregate sources, except for those in streams and rivers,to provide: • Reasonably uniform depths and widths; • Natural drainage so no water stands or collects in excavated areas,when practicable; • Slopes trimmed to blend with the adjacent terrain upon completion of operations; • Slopes covered with native soil, or acceptable plant rejects to support plant growth, if required by Specifications, Plans,or permits; and • A vegetative cover that blends with the adjacent natural growth. (c) Excavate in quarries so that: • Faces will not be steeper than vertical (no overhang); • Vertical faces conform to Oregon OSHA standards, Division 3, and as shown on an approved development plan; • Floors or benches are excavated to a uniform Slope free of depressions and will drain and not interfere with the downland owner's property; and • Upon completion,the quarry is left appearing neat and compatible with surrounding terrain. (d) Obliterate haul roads specifically built for access to sources, and restore the areas disturbed by these roads as nearly as practicable to the conditions that existed before the roads were built, unless otherwise directed by the landowner or regulatory body. 66 General Conditions Revised 01/27/2026 00165 Conformed to Bid Documents Section 00165-Quality of Materials Description 00165.00 General-The Contractor shall incorporate into the Work only Materials conforming to the Specifications and approved by the Engineer. The Contractor shall incorporate into the Work only manufactured products made of new materials unless otherwise specified in the Contract. The Agency may require additional testing or retesting to determine whether the Materials or manufactured products meet Specifications. Materials or manufactured products not meeting the Specifications at the time they are to be used are unacceptable and must be removed immediately from the Project Site, unless otherwise directed by the Engineer. 00165.01 Rejected Materials-The Engineer may reject any Materials that appear to be defective(00150.25) or that contain asbestos. The Contractor shall not incorporate any rejected Materials into the Work. Rejected Materials whose defects have been corrected may not be incorporated into the Work until the Engineer has approved their use. The Engineer may order the removal and replacement by the Contractor, at the Contractor's expense, of any defective Materials. (refer also to 00150.20) 00165.02 Materials Conformance and Quality Compliance Documents-For purposes of this Section, "Materials Conformance Documents" means the Contractor's quality control, the Agency's verification, and the independent assurance test results,and the identity of the testing facility,as specified in the ODOT Manual of Field Test Procedures (MFTP), section 2, Quality Assurance Program, unless otherwise specified in the Contract. See Special Provisions For purposes of this Section, "Quality Compliance Documents"means those documents specified in ODOT's Nonfield-Tested Materials Acceptance Guide, unless otherwise specified in the Contract. 00165.03 Testing by Agency-When testing Materials, the Agency will have tests conducted in its central laboratory,field laboratories,or other laboratories designated by the Engineer,even though certain AASHTO, ASTM, and other Materials specifications may require testing at the place of manufacture. Results of the Agency's tests will be made available to the Contractor. See Special Provisions 00165.04 Costs of Testing-When the Contract requires that the Agency performs the testing, the testing will be at the Agency's expense. See Special Provisions Unless otherwise provided in the Contract,all testing required to be performed by the Contractor will be at the Contractor's expense. 00165.10 Materials Acceptance Guides- Unless otherwise specified elsewhere in the Contract, Materials will be accepted according to the following guides: (a) Field-Tested Materials- Field-tested Materials will be accepted according to the ODOT Manual of Field Test Procedures (MFTP) unless otherwise specified in the Special Provisions. The MFTP is published once per year and is available from the ODOT — Construction Section, 800 Airport Road SE; Salem, OR 97301-4798; phone 503-986-3000. The MFTP is also available on the ODOT Construction The most current version of the MFTP on the date of Advertisement is the version in effect for the Project. (b) Nonfield-Tested Materials-Nonfield-tested Materials will be accepted according to the ODOT Nonfield Tested Materials Acceptance Guide(NTMAG),unless otherwise specified in the Contract.Special Provisions. The NTMAG is available on the ODOT Construction Section website (see 00110.05(e)). The most current version of the NTMAG on the date of Advertisement is the version in effect for the Project. 67 General Conditions Revised 01/27/2026 00165 Conformed to Bid Documents 00165.20 Materials Specifications and Test Method References-References to Materials specifications and test methods of ODOT, WAQTC, AASHTO, ASTM, other governmental agencies, or other recognized organizations mean those officially adopted and in current use by the agency or organization on the first date of Invitation for Bids. If there are conflicting references, or if no reference is made to Materials specifications,sampling and testing frequencies,or test method,the Engineer will resolve any discrepancies between among these documents in the following orders of precedence: Field-Tested Materials: • Contract Change Orders; • Special Provisions; • ODOT Laboratory Manual of Test Procedures; • MFTP; and • Standard Specifications; Nonfield-Tested Materials: • Contract Change Orders; • Special Provisions; • ODOT Laboratory Manual of Test Procedures; and • Standard Specifications. Material test Methods: • ODOT; • WAQTC; • AASHTO; • ASTM; • Other recognized national organizations,such as ANSI,AWPA,AWWA, IMSA, ISSA, and UL; and • Industry standards in the location where the Work is being performed. If there are conflicting references in the Contract to required sampling and testing frequencies,the Contractor shall sample and test the Materials according to the first applicable of the following: • Contract Change Orders; • Special Provisions; • MFTP; • Standard Specifications 00165.30 Field-Tested Materials (a) Acceptance of Field-Tested Materials -The Contractor's test results for field-tested Materials may be verified by the Agency. Materials will be analyzed as determined by the Engineer for acceptance before the Engineer will accept them for incorporation into the Work. Incorporated Materials that do not meet Specifications will be evaluated according to 00165.01 and 00150.25. 68 General Conditions Revised 01/27/2026 00165 Conformed to Bid Documents If the Agency's verification test results do not verify the Contractor's test results, the Agency may require additional testing to determine whether the Materials meet Specifications. The Contractor shall perform additional testing or provide samples to the Agency for testing as directed. If the Materials do not meet Specifications, the Contractor shall reimburse the Agency for the cost of the additional testing,which may be deducted from monies due or to become due the Contractor under the Contract. Incorporated Materials that do not meet Specifications will be evaluated according to 00165.01 and 00150.25. If the Materials meet Specifications the Agency will pay the cost for the additional testing. 00165.35 Nonfield-Tested Materials-The Contractor shall furnish Materials meeting Specifications, along with all Materials Conformance and Quality Compliance Documents. Materials will be subject to acceptance testing if the Engineer so elects. The Engineer may reject damaged or non-Specification Materials regardless of the Materials Test Results and Quality Compliance Certificates furnished. (a) Test Results Certificate-The Certificate shall: • Be from the manufacturer verifying that the Material furnished has been sampled and tested and the test results meet the Specifications. • Include, or be accompanied by, a copy of the specified test results (ODOT,AASHTO,ASTM, UL or other). • Identify the independent testing agency and the representative responsible for the test results. • Permit positive determination that Material delivered to the Project is the same Material covered by the test results. • Be delivered to the Engineer with the shipment of the material. (b) Quality Compliance Certificate-The certificate shall be from the manufacturer and shall: • Verify that the Material meets the Specifications, and identify by number the specified test methods used, (ODOT,AASHTO,ASTM, UL, or other) • Permit positive determination that Material delivered to the Project is the same Material covered by the certificate. • Be delivered to the Engineer with the shipment of the Material, or be an identification plate or mark, decal, sticker, label,or tag attached to the container or Material, (c) Equipment List and Drawings-These consist of lists of proposed Equipment and Materials,such as: • Shop drawings • Material lists • Equipment lists • Catalog description sheets • Manufacturer's brochures Submit these lists to the Engineer for review of conformance with the Specifications. (d) Certificate of Origin of Steel Materials-When a certificate of material origin for steel or iron Materials is specified, complete this document (ODOT Form 734-2126) as required by 00160.20(a) for Federal-aid projects. (e) Certificate of Origin of Construction Materials-When a certificate of material origin for construction materials is specified, complete the ODOT Form furnished by the Engineer 734-5378 as required by 00160.20(d)for Federal-aid projects. 69 General Conditions Revised 01/27/2026 00165 Conformed to Bid Documents Acceptance Sampling and Testing-The Contractor shall sample and test Materials for acceptance, as required by the Contract. Materials will be analyzed as determined by the Engineer for acceptance before the Engineer will accept them for incorporation into the Work-Require corrective work, at the Contractor's expense, with an appropriate price reduction that may range from zero(full payment)to 100% (no payment); or when the Engineer determines the Materials or Work does not conform to the Specifications the Engineer may accept the Materials or Work with pay adjustments or reject the Materials or Work per 00150.25. 00165.70 Use of Materials without Engineer's Acceptance: (a) General-The Contractor shall not incorporate Materials into the Project prior to acceptance by the Engineer. The Engineer may waive this requirement temporarily if Materials are necessary for immediate traffic safety. (b) Materials Incorporated for Immediate Traffic Safety- If Materials are incorporated into the Project for immediate traffic safety before acceptance by the Engineer, no payment will be made for the value of the Materials, or the costs of incorporating them, until Materials are accepted by the Engineer, or the Materials are otherwise found through testing to comply with Specifications. (c) Contractor's Request for Testing Assistance-If acceptable Materials Conformance Documents are not available,the Contractor may either have the necessary tests performed at a private laboratory or request in writing that the Engineer: • Determine if the Agency or its agents can sample and test; • Estimate the cost to the Contractor for the testing service; and • Estimate the time required to obtain the test results. The Engineer will provide this information to the Contractor in writing. If the Contractor requests the Engineer, in writing, to proceed, the Engineer will arrange for the sampling and testing, at the Contractor's expense. If these tests determine the Material complies with the Specifications, the Materials may be incorporated into the Project, or for Materials previously incorporated according to(b)above, payment will be authorized. 00165.75 Storage and Handling of Materials-The Contractor shall store and handle Materials so as to preserve their quality and fitness for incorporation into the Work. The Contractor shall restore all storage sites to their original condition according to 00140.90, or to comply with any applicable permits, orders, or agreements, at the Contractor's expense. Stored Materials: • Shall be readily accessible for inspection; • May be stored on approved parts of the Right-of-Way; and • May be stored on private property if written permission of the owner or lessor is obtained. Measurement 00165.80 Measurement- No separate measurement will be made of Work performed under this Section. 70 General Conditions Revised 01/27/2026 00165 Conformed to Bid Documents Payment 00165.90 Incidental Basis-No separate or additional payment will be made for sampling, testing, certification, or other associated Work performed under this Section, whether performed by the Contractor, manufacturer, producer or supplier. No payment will be made for providing quality control personnel. 71 General Conditions Revised 01/27/2026 00170 Conformed to Bid Documents Section 00170-Legal Relations and Responsibilities 00170.00 General- The Contractor shall comply with all laws, ordinances, codes, regulations, executive orders,and administrative rules(collectively, "Laws")that relate to the Work or to those engaged in the Work. Where the provisions of the Contract conflict with applicable Laws, the Contractor shall comply with the more stringent standard. The Contractor shall indemnify, defend, and hold harmless the Agency and its representatives from liability arising from or related to the violation of Laws by those engaged in any phase of the Work. This provision does not apply to Work performed by Agency employees. In any litigation,the entire text of any order or permit issued by a governmental or regulatory authority,as well as any documents referenced or incorporated therein by reference, shall be admissible for the purpose of Contract interpretation. The characterization of certain provisions of the Contract as material, or the failure to comply with certain provisions as a material breach, shall not be construed to mean that other provisions are not material or that failure to comply with other provisions is not a material breach of the Contract. All rights and remedies available to the Agency under applicable Laws are incorporated herein by reference and are cumulative with all rights and remedies under the Contract. The Contract shall not be construed against either party regardless of which party drafted it. Other than as modified by the Contract,the applicable rules of contract construction and evidence shall apply. This Contract shall be governed by and construed and enforced according to the laws of the State of Oregon without regard to principles of conflict of laws. Any dispute between the Agency and the Contractor that arises from or relates to this Contract and that is not resolved under the provisions of Section 00199 shall be brought and conducted solely and exclusively decided under the provisions of Section 00199. If an arbitration award is to be enforced by judicial means,venue shall lie within the Clackamas County Circuit Court that if enforcement of the arbitration award must be brought in a federal forum,then it shall be brought and conducted solely and exclusively within the United States District Court for the District of Oregon. In no event shall this Subsection be construed as a waiver by the State of Oregon on any form of defense or immunity, whether sovereign immunity, governmental immunity, immunity based on the Eleventh Amendment to the Constitution of the United States, or otherwise, from any claim or from the jurisdiction of any court. CONTRACTOR BY EXECUTION OF THE CONTRACT HEREBY CONSENTS TO THE IN PERSONAM JURISDICTION OF THE COURTS REFERENCED IN THIS SECTION. It is the Agency's intention to make all payments due under the Contract if funds are legally available for such purpose. The Agency reasonably believes that, at the time of entering into the Contract, sufficient funds are available and authorized for expenditure to finance the cost of the Contract within the Agency's appropriation or limitation,or other funding sources. Agency's payment of amounts under the Contract is contingent on the Agency receiving adequate appropriations, limitations, or other expenditure authority or funds to allow the Agency to continue to make payments under the Contract. In the event the Agency becomes aware that sufficient funds are not available and authorized, the Agency will provide prompt written notice to the Contractor, and the Agency may terminate the Contract as provided in 00180.90(c). 72 General Conditions Revised 01/27/2026 00170 Conformed to Bid Documents Provisions and Requirements 00170.01 Other Agencies Affecting Agency Contracts-Representatives of regulatory bodies or units of government whose Laws may apply to the Work shall have access to the Work according to 00150.20(d). These may include but are not limited to those in the following (a), (b), (c), and (d). (a) Federal Agencies: Agriculture, Department of Forest Service Natural Resource Conservation Service Army, Department of the Corps of Engineers Commerce, Department of National Marine Fisheries Service Defense, Department of Energy, Department of Environmental Protection Agency(EPA) Federal Energy Regulatory Commission Geology Survey Health and Human Services, Department of Homeland Security, Department of U.S. Coast Guard (USCG) Housing and Urban Development, Department of Interior, Department of Heritage, Conservation, and Recreation Service Bureau of Indian Affairs Bureau of Land Management Bureau of Mines Bureau of Reclamation Geological Survey Minerals Management Service Office of Surface Mining, Reclamation, and Enforcement Minerals Management Service National Oceanic and Atmospheric Administration Solar Energy and Energy Conservation Bank U.S. Fish and Wildlife Service Labor, Department of Mine Safety and Health Administration Occupational Safety and Health Administration (OSHA) Transportation, Department of Federal Highway Administration Water Resources Council (b) State of Oregon Agencies: Administrative Services, Department of 73 General Conditions Revised 01/27/2026 00170 Conformed to Bid Documents Agriculture, Department of Natural Resources Division Soil and Water Conservation District Columbia River Gorge Commission Consumer and Business Services, Department of Insurance Division Oregon Occupational Safety and Health Division (OR-OSHA) Energy, Office of Environmental Quality, Department of(DEQ) Fish and Wildlife, Department of Forestry, Department of Geology and Mineral Industries, Department of Human Resources, Department of Labor and Industries, Bureau of Land Conservation and Development Department Parks and Recreation, Department of State Lands, Department of Water Resources Department (c) Local Agencies: City Councils County Courts County Commissioners, Boards of Design Commissions Historical Preservation Commissions Lane Regional Air Pollution Authority(LRAPA) Planning Commissions Port Districts Special Districts (d) Oregon Federally Recognized Tribal Governments: Burns Paiute Tribe Confederated Tribes of Coos, Lower Umpqua and Siuslaw Indians Confederated Tribes of Grand Ronde Confederated Tribes of Siletz Confederated Tribes of Umatilla Indian Reservation Confederated Tribes of Warm Springs Coquille Tribe Cow Creek Band of Umpqua Indians Klamath Tribe 74 General Conditions Revised 01/27/2026 00170 Conformed to Bid Documents 00170.02 Permits, Licenses,and Taxes- As required to accomplish the Work, the Contractor shall do the following: • Obtain all necessary permits and licenses, except for those noted in 00170.03; • Pay all applicable charges,fees and taxes, except for those noted in 00170.03; • Give all notices required by applicable Laws, or under the terms of the Contract; • Comply with ORS 274.530 relating to lease of stream beds by Oregon Division of State Lands; • License, in the State of Oregon, all vehicles subject to licensing; • Comply with ORS 477.625 and ORS 527.670 relating to clearing and fire hazards on forest lands;and • Comply with all orders and permits issued by a governmental authority,whether local, State,or federal. • See Special Provisions 00170.03 Furnishing Rights-of-Way, Easements and Permits- Unless required to be obtained in the name of the Contractor, the Agency will obtain and pay for the following when they are required by the applicable Laws or by Plans or Specifications: • All necessary Rights-of-Way, Easements and Rights-of-Entry; • Permits required for crossing or encroaching upon navigable streams; • Permits required for removing materials from or depositing materials in waterways; • Permits required for operating in Agency-controlled source of Materials or disposal area; • System development fees charged by local units of government; • Building construction permits, not including specialty work such as heating,ventilation,air conditioning, or electrical; • Cost of referencing and replacing endangered survey monuments;and • Environmental permits, excluding erosion control permits. If, after the Bid Closing date, the Agency obtains any Permits, Rights-of-Way or Easements that require changes to the Work and thereby causes an increase or decrease in the cost of, or the time required for the performance of the Work, the Contractor shall submit information sufficient for the Engineer to determine the extent of the effects on the cost and/or schedule. If the Engineer agrees the cost and/or schedule will be affected by such changes, such effects will be handled in accordance with the General Conditions. The Engineer will provide the Contractor with a copy of any such Permits, Rights-of-Way or Easements. 00170.04 Patents,Copyrights,and Trademarks-Prior to use of designs,devices, materials, or processes protected by patent,copyright,or trademark,the Contractor shall obtain from the Entity entitled to enforce the patent, copyright, or trademark all necessary evidence of Contractor's legal right to use such design, device, material, or process. The Contractor shall indemnify, defend and hold harmless the Agency and all third parties and political subdivisions having a possessory or ownership interest or regulatory authority over the Project or Project Site from claims of patent, copyright or trademark infringement, and from costs, expenses and damages the Contractor or Agency may be obligated to pay as a result of such infringement during or after completing the Work. 00170.05 Assignment of Antitrust Rights-The Contractor irrevocably assigns to the Agency any claim for relief or cause of action the Contractor acquires during the term of the Contract, or which may accrue thereafter, by reason of any violation of: • Title 15(Commerce and Trade), United States Code; 75 General Conditions Revised 01/27/2026 00170 Conformed to Bid Documents • ORS 646.725; or • ORS 646.730. In connection with this assignment, it is an express obligation of the Contractor to take no action that would in any way impair or diminish the value of the rights assigned to the Agency according to the provisions of this Subsection. Further, it is the express obligation of the Contractor to take all action necessary to preserve the rights assigned. It is an express obligation of the Contractor to advise the Agency's legal counsel: • In advance, of its intention to commence any action involving such claims for relief or causes of action; • Immediately upon becoming aware of the fact that an action involving such claims for relief or causes of action has been commenced by some other person or persons; • The date on which it notified the obligor(s)of any such claims for relief or causes of action of the fact of the Contractor's assignment to the Agency according to the provisions of this Subsection; and • Immediately upon the discovery of any such antitrust claim for relief or cause of action. In the event any payment is made to the Contractor under any such claims for relief, the Contractor shall promptly pay the full sum over to the Agency. In the event the Contractor fails to make such payment, the Agency may deduct the amount from monies due or to become due the Contractor under the Contract. 00170.07 Record Requirements- For purposes of this Subsection the term "Contractor" includes the Contractor, all subcontractors, Material Suppliers, and providers of rented operated Equipment(except non- DBE truck drivers), at all tiers,for all subcontracts with first-tier Subcontractors, all subcontracts between the first-tier Subcontractors and their subcontractors and any other lower-tier subcontracts,and"Related Entities" as that term is defined in OAR 734-010-0400(7). The Material Suppliers included in this definition are those for Aggregates, Asphalt Cement Concrete, Portland Cement Concrete and the supply and fabrication of structural steel items and/or Material Suppliers that provide quotes. (a) Records Required-The Contractor shall maintain all records,whether created before or after execution of the Contract,or during Contract performance,or after Contract completion, to clearly document: • The Contractor's performance of the Contract or a subcontract; • The Contractor's ability to continue performance of the Contract or a subcontract;and • All claims arising from or relating to performance under the Contract or a subcontract. These records shall include all records, including fiscal records, regardless of when created for the Contractor's business. The records for the Contractor's business include,without limitation the: • Bidding estimates and records, worksheets,tabulations or similar documents. • Job cost detail reports, including monthly totals. • Payroll records (including without limitation the ledger or register,and tax forms)and all documents that establish the periods, individuals involved, the hours for the individuals, and the rates for the individuals. • Records that identify the Equipment used by the Contractor and subcontractors in the performance of the Contract or subcontracts, including, without limitation, Equipment lists, rental contracts and any records used in setting rental rates. • Invoices from vendors, rental agencies, and subcontractors. • Material quotes, invoices, purchase orders and requisitions. • Contracts with subcontractors and contracts with Material Suppliers, Suppliers and providers of rented equipment. 76 General Conditions Revised 01/27/2026 00170 Conformed to Bid Documents • Contracts or documents of other arrangements with any Related Entity as defined in OAR 734-010-0400(7). • General ledger. • Trial Balance • Financial statements (including, without limitation, the balance sheet, income statement, statement of cash flows, and financial statement notes). • Income tax returns. • All worksheets used to prepare bids or claims,or to establish the cost components for the Pay Items, including, without limitation, the labor, benefits and insurance, Materials, Equipment, and subcontractors. The following are examples, but not an exhaustive list, of records that would be included, if generated by the Contractor. If the Contractor generates such records, or equivalent records, they are included among the records subject to 00170.07. • Daily time sheets and supervisors' daily reports. • Collective bargaining agreements. • Earnings records. • Journal entries and supporting schedules. • Insurance,welfare,and benefits records. • Material cost distribution worksheet. • Subcontractors'and lower tier subcontractors'payment certificates. • Payroll and vendor's cancelled checks. • Cash disbursements journal. • All documents related to each and every claim together with all documents that support the amount of damages as to each claim. • Additional financial statements (including, without limitation, the balance sheet, income statement, statement of cash flows, and financial notes) preceding the execution of the Contract and following final payment of the Contract. • Depreciation records on all business Equipment maintained by the business involved,its accountant, or other Entity. (If a source other than depreciation records is used to develop cost for the Contractor's internal purposes in establishing the actual cost of owning and operating Equipment,all such other source documents.) The Contractor shall maintain all fiscal records in material compliance with generally accepted accounting principles,or other accounting principles that are accepted accounting principles and practices for the subject industry and adequate for the nature of the Contractor's business, and in such a manner that providing a complete copy is neither unreasonably time consuming nor unreasonably burdensome for the Contractor or the Agency. Failure to maintain the records in this manner shall not be an excuse for not providing the records. The Contractor shall include in its subcontracts,purchase orders,and all other written agreements,a provision requiring all subcontractors, Material Suppliers and providers of rented operated Equipment,(except non-DBE truck drivers), at all tiers, to comply with 00170.07. The Contractor shall also require all subcontractors, Material Suppliers, and providers of rented operated Equipment, (except non-DBE truck drivers), at all tiers, and Related Entities to include in their contracts, purchase orders, and all other written agreements, a provision requiring all lower tier subcontractors, Material Suppliers and providers of rented operated Equipment (except non-DBE truck drivers) to comply with 00170.07. The Material Suppliers to which this applies are those for Aggregates, Asphalt Cement Concrete, Portland Cement Concrete and the supply and 77 General Conditions Revised 01/27/2026 00170 Conformed to Bid Documents fabrication of structural steel items and/or Material Suppliers that provide Material quotes and Related Entities as defined in OAR 734-010-0400(7). (b) Access to Records-The Contractor shall provide the Engineer access to or a copy of all Contractor records upon request. A Project Manager's authority to request or access records is subject to OAR 734-010-0400(9). During the record retention period the Engineer, other employees of the Agency, representatives of the Agency,or representatives of regulatory bodies or units of government may: • Inspect,examine and copy or be provided a copy of all Contractor records; • Audit the records, a Contract or the performance of a Contract; • Inspect, examine and audit the records when, in the Agency's sole discretion, the records may be helpful in the resolution of any claim, litigation, administrative proceeding or controversy arising out of or related to a Contract. Reasons for access to audit, inspect, examine and copy records include without limitation, general auditing, reviewing claims, checking for collusive bidding, reviewing or checking payment of required wages, performance and contract compliance, workplace safety compliance, evaluating related Entities, environmental compliance, and qualifications for performance of the Contract, including the ability to perform and the integrity of the Contractor. Where such records are stored in a computer or in other digital media, the Engineer may request, and the Contractor shall provide,a copy of the data files and such other information or access to software to allow the Engineer review of the records. Nothing in 00170.07 is intended to operate as a waiver of the confidentiality of any communications privileged under the Oregon Evidence Code. Nothing in 00170.07 limits the records or documents that can be obtained by legal process. (c) Record Retention Period-The Contractor shall maintain the records and keep the records accessible and available at reasonable times and places for at least three years from the date of final payment under the Contract,or until the conclusion of all audits, litigation,administrative proceedings,disputes and claims arising out of or related to the Contract,whichever date is later. (d) Public Records Requests- If records provided under this section contain any information that may be considered exempt from disclosure as a trade secret under either ORS 192.345 or ORS 646.461(4),or under other grounds specified in Oregon Public Records Law, ORS 192.311 through ORS 192.478,the Contractor shall clearly designate on or with the records the portions which the Contractor claims are exempt from disclosure, along with a justification and citation to the authority relied upon. Entire records or documents should not be designated as a trade secret or otherwise exempt from disclosure. Only specific information within a record or document should be so designated. To the extent allowed by the Oregon Public Records Law or other applicable law related to the disclosure of public records, the Agency will not disclose records or portions of records the Contractor has designated as trade secrets to a third party,who is not a representative of the Agency,to the extent the records are exempt from disclosure as trade secrets under the Oregon Public Records Law or other applicable law, except to the extent the Agency is ordered to disclose in accordance with the Oregon Public Records Law or by a court of competent jurisdiction. Application of the Oregon Public Records Law or other applicable law shall determine whether any record,document or information is actually exempt from disclosure. In addition, in response to a public records request, the Agency will not produce or disclose records so identified as exempt by the Contractor to any person other than representatives of the Agency, and others with authorized access under 00170.07(b), without providing the Contractor a copy of the public records request, unless: The Contractor consents to such disclosure; or 78 General Conditions Revised 01/27/2026 00170 Conformed to Bid Documents The Agency is prohibited by applicable law or court order from providing a copy of the public records request to the Contractor. 00170.10 Required Payments by Contractors-The Contractor shall comply with ORS 279C.505 and ORS 279C.515 during the term of the Contract. (a) Prompt Payment by Contractor for Labor and Materials-As required by ORS 279C.505, the Contractor shall: • Make payment promptly, as due,to all Entities supplying labor or Materials under the Contract; • Pay all contributions or amounts due the Industrial Accident Fund,whether from the Contractor or a subcontractor, incurred in the performance of the Contract; • Not permit any lien or claim to be filed against the State or any political subdivision thereof, on account of any labor or Material furnished in performance of the Contract; and • Pay to the Department of Revenue all sums withheld from employees according to ORS 316.167. (b) Prompt Payment by Contractor to First-Tier Subcontractor(s)-According to ORS 279C.580(3)(a), after the Contractor has determined and certified to the Agency that one or more of its Subcontractors has satisfactorily performed subcontracted Work, the Contractor may request payment from the Agency for the Work, and shall pay the Subcontractor(s) within 10 Calendar Days out of such amounts as the Agency has paid to the Contractor for the subcontracted Work. (c) Interest on Unpaid Amount- If the Contractor or a first-tier Subcontractor fails, neglects, or refuses to make payment to an Entity furnishing labor or Materials in connection with the Contract within 30 Days after the Contractor's receipt of payment,the Contractor or first-tier Subcontractor shall owe the Entity the amount due plus interest charges that begin at the end of the 10 day period within which payment is due under ORS 279C.580(3) and that end upon final payment, unless payment is subject to a good-faith dispute as defined in ORS 279C.580(5)(b). The rate of interest on the amount due shall be in accordance with ORS 279C.515(2). The amount of interest shall not be waived. (d) Agency's Payment of the Contractor's Prompt Payment Obligations- If the Contractor fails, neglects or refuses to make prompt payment of any invoice or other demand for payment for labor or services furnished to the Contractor or a Subcontractor by any Entity in connection with the Contract as such payment becomes due, the Agency may pay the Entity furnishing the labor or services and charge the amount of the payment against monies due or to become due the Contractor under the Contract. (The Agency has no obligation to pay these Entities, and the Agency will not normally do so, but will refer them to the Contractor and the Contractor's Surety.) The payment of a claim by the Agency in the manner authorized in this Subsection shall not relieve the Contractor or the Contractor's Surety from obligations with respect to any such claims. (e) Right to Complain to the Construction Contractors Board- If the Contractor or a subcontractor fails, neglects,or refuses to make payment to an Entity furnishing labor or Materials in connection with the Contract, the Entity may file a complaint with the Construction Contractors Board, unless payment is subject to a good- faith dispute as defined in ORS 279C.580(5)(b). (f) Notice of Claim Against Bond-An Entity(which by definition includes a natural person)claiming not to have been paid in full for labor or Materials supplied for the prosecution of the Work may have a right of action on the Contractor's Payment Bond as provided in ORS 279C.600 and through ORS 279C.605. The Commissioner of the Bureau of Labor and Industries(BOLT)may have a right of action on the Contractor's and Subcontractors' public works bonds and Payment Bonds for workers who have not been paid in full, as provided in ORS 279C.600 and ORS 279C.605. 79 General Conditions Revised 01/27/2026 00170 Conformed to Bid Documents 00170.20 Public Works Bond- If the original Contract Amount is$100,000 or greater, then before starting work, or if the Contract Amount is amended to a Contract Amount$100,000 or greater, and unless otherwise exempt under ORS 279C.836(4), (7) — (9), the Contractor shall file a public works bond with the Oregon Construction Contractors Board in the amount required by ORS 279C.836 [$30,000(1970)] before starting or continuing Work on the project. Further, the Contractor shall then include in every subcontract a provision requiring the subcontractor to have a public works bond,filed with the Oregon Construction Contractors Board in the amount required by ORS 279C.836 [$30,000(1970)]before starting Work, or if the Contract Amount is amended to $100,000 or above, before continuing Work on the project. ORS 279C.830(3)(a,b) The Contractor shall verify subcontractors have filed a public works bond before the subcontractor begins Work. See Special Provisions 00170.32 Protection of Navigable Waters-The Contractor shall comply with all applicable Laws, including, without limitation,the Federal River and Harbor Act of March 3, 1899 and its amendments. The Contractor shall not interfere with waterway navigation or impair navigable depths or clearances, except as U.S. Coast Guard or Corps of Engineer permits allow. 00170.33 Recycling. In accordance with ORS 279C.510, if the Work includes demolition work, Contractor shall salvage or recycle construction and demolition debris, if feasible and cost-effective. If this Contract includes lawn or landscape maintenance, Contractor shall compost or mulch yard waste material at an approved site, if feasible and cost-effective. 00170.60 Safety,Health,and Sanitation Provisions-The Contractor shall comply with all Laws concerning safety, health, and sanitation standards. The Contractor shall not require workers to perform Work under conditions that are hazardous,dangerous, or unsanitary. Workers exposed to traffic shall wear upper body garments or safety vests that are highly visible and meet the requirements of 00221.20. Workers exposed to falling or flying objects or electrical shock shall wear hard hats. Upon their presentation of proper credentials, the Contractor shall allow inspectors of the U.S. Occupational Safety and Health Administration (OSHA) and the Oregon Occupational Safety and Health Division (OR- OSHA)to inspect the Work and Project Site without delay and without an inspection warrant. According to ORS 468A.715 and ORS 468A.720, the Contractor or a Subcontractor who performs Project Work involving asbestos abatement shall possess a valid DEQ asbestos abatement license. 00170.61 Industrial Accident Protection: (a) Workers' Compensation-The Contractor shall provide workers' compensation coverage for on-the-job injuries as required by 00170.70(d). (b) Longshoremen's and Harbor Workers'Compensation- If Work to be performed is over or adjacent to navigable waters, the Longshoremen's and Harbor Workers' Compensation Act, (Chapter 18, Title 33 of the USC)may apply,and the Contractor shall be responsible for complying with its provisions(which may include the provision of additional workers'compensation benefits to employees). 00170.62 Labor Nondiscrimination-The Contractor shall comply with all Laws concerning equal employment opportunity, including, without limitation, those prohibiting discrimination because of race, religion,color,sex, disability, or national origin. 00170.63 Payment for Medical Care-According to ORS 279C.530, the Contractor shall promptly, as due, make payment to any person, co-partnership, association or corporation furnishing medical, surgical and hospital care services or other needed care and attention, incident to sickness or injury, to the employees of 80 General Conditions Revised 01/27/2026 00170 Conformed to Bid Documents the Contractor, of all sums that the Contractor agrees to pay for the services and all moneys and sums that the Contractor has collected or deducted from the wages of employees under any law, contract or agreement for the purpose of providing or paying for the services. 00170.65 Minimum Wage and Overtime Rates for Public Works Projects: (a) General-The Contractor is responsible for investigating local labor conditions. The Agency does not imply that labor can be obtained at the minimum hourly wage rates specified in State or federal wage rate publications, and no increase in the Contract Amount will be made if wage rates paid are more than those listed. As required by ORS 279C.520, the Contractor shall comply with ORS 652.220 and shall not unlawfully discriminate against any of the Contractor's employees in the payment of wages or other compensation for work of comparable character on the basis of an employee's membership in a protected class. "Protected class"means a group of persons distinguished by race,color, religion,sex, sexual orientation, national origin, marital status,veteran status,disability, or age. The Contractor's compliance with this provision constitutes a material element of the Contract and failure to comply constitutes a material breach that entitles the Agency to exercise any remedies available under the Contract, including, but not limited to, termination for default. As required by ORS 279C.520, the Contractor shall not prohibit any of the Contractor's employees from discussing the employee's rate of wage, salary, benefits or other compensation with another employee or another person and shall not retaliate against an employee who discusses the employee's rate of wage,salary, benefits or other compensation with another employee or another person. (b) State Prevailing Wage Requirements-The Contractor shall comply with the prevailing wage provisions of ORS 279C.800 through ORS 279C.870.. Contractor and any subcontractors shall post the prevailing wage rates in a conspicuous and accessible place in or about the Project. (1) Minimum Wage Rates-The Bureau of Labor and Industries (BOLT)determines and publishes the existing State prevailing wage rates in the publication"Prevailing Wage Rates for Public Works Contracts in Oregon". The Contractor shall pay workers not less than the specified minimum hourly wage rate according to ORS 279C.838 and ORS 279C.840, and shall include this requirement in all subcontracts. See the Project Wage Rates page included with the Contract Booklet for additional information about which wage rates apply to the Project and how to access the applicable wage rates. The applicable BOLT wage rates will be included in the Contract. (2) Payroll and Certified Statements-As required in ORS 279C.845, the Contractor and every subcontractor shall submit written certified statements to the Engineer on the form prescribed by the Commissioner of BOLT in OAR 839-025-0010 certifying compliance with wage payment requirements and accurately setting out the Contractor's or subcontractor's weekly payroll records for each worker employed on the Project. The Contractor and subcontractors shall preserve the certified statements for a period of six years from the date of completion of the Contract. (3) Additional Retainage: a. Agency-As required in ORS 279C.845(7)the Agency will retain 25% of any amount earned by the Contractor on the Project until the Contractor has filed the certified statements required in ORS 279C.845 and in FHWA Form 1273, if applicable. The Agency will pay to the Contractor the amount retained within 14 Days after the Contractor files the required certified statements, regardless of whether a subcontractor has failed to file certified statements. 81 General Conditions Revised 01/27/2026 00170 Conformed to Bid Documents b. Contractor-As required in ORS 279C.845(8) the Contractor shall retain 25% of any amount earned by a first tier subcontractor on the Project until the first tier subcontractor has filed with the Agency the certified statements required in ORS 279C.845 and in FHWA Form 1273, if applicable. Before paying any amount retained,the Contractor shall verify that the first tier subcontractor has filed the certified statement. Within 14 Days after the first tier subcontractor files the required certified statement the Contractor shall pay the first tier subcontractor any amount retained. (4) Owner/Operator Data- For a project funded by the FHWA,the Contractor shall furnish data to the Engineer for each owner/operator providing trucking services. Furnish the data before the time the services are performed and include without limitation for each owner/operator: • Driver's name: • Present driver license upon request; • Vehicle identification number; • Present vehicle registration upon request; • Motor vehicle license plate number; • Motor Carrier account Plate Number; • Present ODOT Motor Carrier 1A Permit upon request; and • Name of owner/operator from the side of the truck. (c) State Overtime Requirements-As a condition of the Contract, the Contractor shall comply with the pertinent provisions of ORS 279C.520 and ORS 279C.540. (1) Maximum Hours of Labor and Overtime Pay-According to ORS 279C.540, no person shall be employed to perform Work under this Contract for more than 10 hours in any 1 Day, or 40 hours in any 1 week, except in cases of necessity, emergency, or where public policy absolutely requires it. In such instances,the Contractor shall pay the employee at least time and a half pay: • For all overtime in excess of 8 hours a day or 40 hours in any 1 week when the work week is 5 consecutive days, Monday through Friday; or • For all overtime in excess of 10 hours a day or 40 hours in any one week when the work week is four consecutive days, Monday through Friday; and • For all Work performed on Saturday and on any legal holiday specified in ORS 279C.540 For additional information on requirements for overtime and establishing a work schedule see OAR 839-025-0050 and OAR 839-025-0034. (2) Notice of Hours of Labor-The Contractor shall give written notice to employees of the number of hours per day and days per week the employees may be required to work. Provide the notice either at the time of hire or before commencement of work on this Contract, or by posting a notice in a location frequented by employees. (3) Exception-The maximum hours of labor and overtime requirements under ORS 279C.540 will not apply to the Contractor's Work under this Contract if the Contractor is a party to a collective bargaining agreement in effect with any labor organization. For a collective bargaining agreement to be in effect it shall be enforceable within the geographic area of the Project,and its terms shall extend to workers who are working on the Project(see OAR 839-025-0054). (d) State Time Limitation on Claim for Overtime-According to ORS 279C.545, any worker employed by the Contractor is foreclosed from the right to collect any overtime provided in ORS 279C.540 unless a claim for payment is filed with the Contractor within 90 Days from the completion of the contract, provided the Contractor posted and maintained a circular as specified in this provision. Accordingly,the Contractor shall: 82 General Conditions Revised 01/27/2026 00170 Conformed to Bid Documents (1) Cause a circular, clearly printed in boldfaced 12-point type and containing a copy of ORS 279C.545, to be posted in a prominent place alongside the door of the timekeeper's office or in a similar place that is readily available and freely visible to any or all workers employed to perform Work; and (2) Maintain such circular continuously posted from the inception to the completion of the Contract on which workers are or have been employed. (e) Additional Requirements When Federal Funds are Involved -When federal funds are involved, the following requirements shall apply in addition to the requirements of 00170.65(a)through 00170.65(d). The Contractor shall include these provisions in all subcontracts as well as ensure that all Subcontractors include these provisions in their lower-tier subcontracts. (1) FHWA Requirements- For Federal-Aid projects,the Contractor shall comply with the provisions of FHWA Form 1273, "Required Contract Provisions Federal-Aid Construction Contracts". (2) Minimum Wage Rates-The Contractor shall pay each worker in each trade or occupation employed to perform any work under the contract not less than the existing State(BOLT)prevailing wage rate or the applicable federal prevailing wage rate required under the Davis-Bacon Act(40 U.S.C. 3141 et seq.), whichever is higher. Contractors shall follow all prevailing wage rules including posting the Davis Bacon Poster at the worksite and submitting certified payroll records. The poster is available at http://www.dol.gov/whd/regs/compliance/posters/fedprojc.pdf. The payroll form is at http://www.dol.gov/whd/forms/wh347instr.htm.The Contractor shall include this provision in all subcontracts. • See the Project Wage Rates page included with the Contract Booklet for additional information about which wage rates apply to the Project and how to access the applicable wage rates. • The applicable Davis-Bacon and BOLT wage rates will be included in the Contract. (3) Payroll and Certified Statements- In addition to providing the payroll information and certified statements required under ORS 279C.845 (see 00170.65(b)(-2)), the Contractor and every subcontractor shall submit written certified statements that also meet the requirements in Section IV of FHWA Form 1273 except the Contractor and every subcontractor shall preserve the certified statements for a period of 6 years from the date of completion of the Contract. (4) Overtime-With regard to overtime pay, the Contractor shall comply with the overtime provision affording the greatest compensation required under FHWA Form 1273 and ORS 279C.540. 00170.70 Insurance: (a) Insurance Coverages-The Contractor shall obtain, at its expense, and keep in effect until Final Acceptance, the insurance coverages listed below. The Contractor may however, contractually obligate an appropriate subcontractor to obtain, at the subcontractor's expense or at the Contractor's expense, and keep in effect during the term of the Contract, pollution liability coverage, asbestos liability, lead liability, or automobile liability with pollution coverages, or such other types of insurance coverages. That, before execution of the Contract, the Agency approves as types of insurance coverage that may be obtained by appropriate subcontractors. If both the Contractor and an appropriate subcontractor will perform pollution related Work or other Work that would be covered by the other above-described types of insurance permitted to be obtained by an appropriate subcontractor,the insurance coverages listed below that correspond to such Work shall be obtained, at the Contractor's or subcontractor's expense, and shall cover the liability of the Contractor and the subcontractor, either under the same or separate insurance policies. Commercial General Liability-Commercial General Liability Insurance covering bodily injury and property damage in a form and with coverages that are satisfactory to the Agency. This insurance shall include 83 General Conditions Revised 01/27/2026 00170 Conformed to Bid Documents personal and advertising injury liability and products and completed operations coverage and contractual liability coverage. Coverage may be written in combination with Commercial Automobile Liability Insurance with separate limits for Commercial General Liability and Commercial Automobile Liability. Coverage shall be written on an occurrence basis. Combined single limit per occurrence shall not be less than the dollar amount indicated in the Special Provisions. The annual aggregate limit shall not be less than the dollar amount indicated in the Special Provisions. The policy shall be endorsed to state that the annual aggregate limit of liability shall apply separately to the Contract. If the Contractor's Commercial General Liability Insurance limits are less than the required limits stated above, the Contractor shall obtain Excess or Umbrella Liability Insurance with sufficient limits that when added to the Contractor's Commercial General Liability Insurance limits the total combined limits of Commercial General Liability Insurance and Excess or Umbrella Liability Insurance equal or exceed the above-stated Commercial General Liability Insurance limits required for this Project. The above-stated combined single limit per occurrence and the above-stated annual aggregate limit must each be met. Excess or Umbrella Liability Insurance coverage shall extend to the same perils, terms, and conditions as the underlying Commercial General Liability Insurance coverage. Pollution Liability- If indicated by Special Provision, Pollution Liability Insurance covering the Contractor's liability, or the liability of an appropriate subcontractor, if the coverage is obtained by the subcontractor, for bodily injury and property damage,and environmental damage resulting from sudden and accidental pollution, gradual pollution,and related clean-up costs incurred by the Contractor,or by the subcontractor if the coverage is obtained by the subcontractor,while performing Work required by the Contract. If the coverage is obtained by the Contractor,the coverage may be written in combination with the Commercial General Liability Insurance with separate limits for Pollution Liability and Commercial General Liability. Combined single limit per occurrence shall not be less than the dollar amount indicated in the Special Provisions. The annual aggregate limit shall not be less than the dollar amount indicated in the Special Provisions. The policy shall be endorsed to state that the annual aggregate limit of liability shall apply separately to the Contract. Asbestos Liability- If indicated by Special Provision, the Contractor,or the subcontractor, if the coverage is obtained by the subcontractor, shall provide an Asbestos Liability endorsement to the pollution liability coverage. If an endorsement cannot be obtained, The Contractor or subcontractor shall provide separate Asbestos Liability Insurance at the same combined single limit per occurrence and annual aggregate limit as the Pollution Liability Insurance with the policy endorsed to state that the annual aggregate limit of liability shall apply separately to the Contract. Lead Liability- If indicated by Special Provision, the Contractor, or the subcontractor, if the coverage is obtained by the subcontractor,shall provide a Lead Liability endorsement to the pollution liability coverage. If an endorsement cannot be obtained, the Contractor or subcontractor shall provide separate Lead Liability Insurance at the same combined single limit per occurrence and annual aggregate limit as the Pollution Liability Insurance with the separate policy endorsed to state that the annual aggregate limit of liability shall apply separately to the Contract. Commercial Automobile Liability-Commercial Automobile Liability Insurance covering all owned, non- owned,and hired vehicles. This coverage may be written in combination with the Commercial General Liability Insurance with separate limits for Commercial Automobile Liability and Commercial General Liability. Combined single limit per occurrence shall not be less than the dollar amount indicated in the Special Provisions. If this coverage is written in combination with the Commercial General Liability,the policy shall be endorsed to state that the Commercial General Liability annual aggregate limit shall apply separately to the Contract. Commercial Automobile Liability with Pollution Coverage- If indicated by Special Provision, the Contractor, or the subcontractor, if the coverage is obtained by the subcontractor, shall provide Commercial Automobile Liability Insurance with Pollution coverage covering the Contractor's liability, or the liability of an appropriate subcontractor, if the coverage is obtained by the subcontractor, for bodily injury, and property damage, and environmental damage arising out of the use of all owned, non-owned, or hired vehicles while performing Work under the Contract. If the coverage is obtained by the Contractor, the coverage may be 84 General Conditions Revised 01/27/2026 00170 Conformed to Bid Documents written in combination with the Commercial General Liability Insurance with separate limits for Commercial Automobile Liability with Pollution Coverage and Commercial General Liability. Combined single limit per occurrence shall not be less than the dollar amount indicated in the Special Provisions or the amount required by the U.S. Department of Transportation,whichever is greater. If this coverage is written in combination with the Commercial General Liability, the policy shall be endorsed to state that the Commercial General Liability annual aggregate limit shall apply separately to the Contract. Marine Insurance(watercraft)- If indicated by Special Provision,the Contractor or Subcontractor,whichever is performing watercraft related Work, entails the use of watercraft, including but not limited to barges, tug boats,work boats,and supply boats, shall provide the following insurance: Marine Liability Insurance-For the performance of the Work that requires the use of any watercraft,whether owned, non-owned, leased, rented, or chartered by Contractor or any Subcontractors, Marine Liability insurance shall not be less than the dollar amount specified in the Special Provisions per occurrence for bodily injury and property damage. Such insurance shall also include coverage for collision liability, tower's liability, marine contractual liability, wreck/debris removal, and liability for seepage, pollution, containment and cleanup. Hull and Machinery Insurance- Including collision liability, with sister-ship clause un-amended, with limits of liability at least equal to the full value of all vessels used in connection with performance of the Work required under this Contract and with navigational limitations adequate for the Contractor to perform the specified Work. Where vessels engage in towing operations, said insurance shall include full towers' liability with the sister- ship clause un-amended. Protection and Indemnity Insurance-To be evidenced through a full entry with a Group P&I Club, including collision liability, towers' liability, marine contractual liability, tankermans' liability, and specialist operations. Alternatively, if a full entry in a Group P&I Club is not available or applicable, Protection and Indemnity Insurance coverage shall be evidenced on the SP-23 form or equivalent, including, by endorsement or otherwise, collision liability, tower's liability, specialist operations, and liability for seepage, pollution, containment and cleanup, with extensions for marine contractual liability, shall not be less than the dollar amount specified in the Special Provisions. Pollution Liability Insurance- If pollution coverage is provided outside of a P&I Club entry or outside of Protection and Indemnity Insurance coverage evidenced on the SP-23 form or equivalent, the amount shall not be less than the dollar amount specified in the Special Provisions. Pollution liability coverage shall cover bodily injury, property damage, including cleanup costs and defense costs resulting from sudden and gradual pollution conditions of contaminants or pollutants into or upon the land, the atmosphere or any water course or body of water. With respect to the aforementioned Hull & Machinery Insurance, Protection and Indemnity Insurance and Pollution Insurance,the policy or policies shall be endorsed as follows: • Other than owner provisions of all policies shall be deleted with respect to the naming of Company as an Additional Assured/Insured; • Delete any as owner clause and any other language,which limits or purports to limit the coverage afforded to an insured or an additional insured who is not a ship-owner,with coverage to be afforded to all additional insureds in any capacity in which they may be held liable; and • Operator warrants that COFR's are on file with the U.S. Coast Guard as per Federal requirements. If Subcontractor(s)are utilized to perform any Work that requires the use of watercraft under the Contract,all such Subcontractor(s)shall maintain insurance including limits, coverages, terms and conditions as required herein unless said Subcontractor(s) are insured by Contractor. Where Contractor provides coverage for a Subcontractor, the Contractor shall issue a Certificate of Insurance, along with related endorsement(s) required to effect coverage, evidencing Subcontractor's "Additional Insured/Assured" status under Contractor's coverage. 85 General Conditions Revised 01/27/2026 00170 Conformed to Bid Documents An Excess Marine Liability insurance policy may be used to meet the required limits of insurance. Excess coverage must follow form and be as broad as that provided by the underlying primary liability insurance policies. ORS 15.320 provides that Oregon law applies to the Contract. The parties also agree that Oregon law applies to the Contract,even if ORS 15.320 is determined to be inapplicable or invalid. (b) Extended Reporting- If any of the required insurance is permitted to be and is on a"claims made"basis, the Contractor or Subcontractor who provided the insurance coverage, shall obtain an extended reporting period on the claims made policy or maintain the claims made policy,for a duration of at least 24 months from the date the applicable work has been completed and accepted by the Agency or the date of Final Acceptance. This extended reporting requirement shall be satisfied with documentation of one of the following: • Extended Reporting Endorsement; • Tail Coverage; or • Maintaining the applicable continuous claims made policy with liability coverage. The Contractor or Subcontractor shall furnish certification of this extended reporting requirement as a condition to receive Third Notice under 00150.90(b)and 00180.50(g). If the Contractor will be performing pollution related Work, this coverage covering the Contractor must be provided. If an appropriate subcontractor, but not the Contractor, will perform the pollution related Work, Commercial Automobile Liability with Pollution Coverage covering the subcontractor, but not the Contractor, must be provided, however,the Contractor shall provide Commercial Automobile Liability insurance coverage covering the Contractor as provided in the Commercial Automobile Liability bullet above. If both the Contractor and an appropriate subcontractor will be performing pollution related Work, Commercial Automobile Liability with Pollution Coverage covering both the Contractor and the subcontractor shall be provided, and the Contractor may provide the coverage covering both the Contractor and the subcontractor, or the Contractor and the subcontractor may provide their own, separate Commercial Automobile Liability with Pollution coverages. (c) Tail Coverage- If any of the required liability insurance coverages of 00170.70(a)are on a"claims made" basis, "tail" coverage will be required at the completion of the Contract for a duration of 36 months. The Contractor shall furnish certification of "tail" coverage for 36 months following Contract completion. Continuous "claims made" coverage will be acceptable in lieu of"tail" coverage, provided its retroactive date is on or before the effective date of the Contract. If Continuous"claims made"coverage is used,the Contractor shall keep the coverage in effect for a duration of not less than 36 months from the end of the Contract. This will be a condition of Final Acceptance. (d) Excess/Umbrella Liability-A combination of primary and Excess/Umbrella Insurance may be used to meet the required limits of insurance. Excess/Umbrella coverage must be at least as broad as that provided by the underlying primary insurance policies. In addition, the limits of the underlying primary insurance must be sufficient to prevent any gap between such minimum limits and the attachment point of the coverage provided by the Excess/Umbrella Liability policy. (e) Additional Insured- The liability insurance coverages of 00170.70(a) shall include the Agency, the Agency's governing body, board, or Commission and its members, and the Agency's officers, agents, and employees as Additional Insureds, but only with respect to the Contractor's activities to be performed under the Contract. If indicated by Special Provisions that federal transportation funding is involved, the liability coverages of 00170.70(a)shall also include the State of Oregon,the Oregon Transportation Commission and the Oregon Department of Transportation and their respective officers,members and employees as additional insureds, but only with respect to the Contractor's activities to be performed under the Contract. Coverage shall be primary and non-contributory with any other insurance and self-insurance. The liability coverages of 00170.70(a)that are permitted by the Agency to be obtained by an appropriate subcontractor shall include all 86 General Conditions Revised 01/27/2026 00170 Conformed to Bid Documents of the foregoing as Additional Insureds and shall also include Contractor and its officers and employees as Additional Insureds. Additional Insured Endorsements on the Commercial General Liability shall be written on ISO Form CG 20 10 07 04, or equivalent,with respect to liability arising out of ongoing operations and ISO Form CG 20 37 07 04, or equivalent, with respect to liability arising out of completed operations. Additional Insured Endorsements shall be submitted with the Certificate(s)of Insurance and must be acceptable to the Agency. (f) Workers' Compensation-All employers, including the Contractor and Subcontractors, if any, that employ subject workers who are performing Work or providing labor or Materials under the Contract in the State shall comply with ORS 656.017 and provide the required Workers'Compensation coverage,unless such employers are exempt under ORS 656.126. The Contractor shall ensure that each of its Subcontractors complies with these requirements. The Contractor shall certify in the Contract that the Contractor is registered by the Oregon Workers' Compensation Division either as a carrier-insured employer,a self-insured employer,an exempt employer,or is an independent contractor who will perform the Work without the assistance of others. The Contractor shall ensure that its insurance carrier files a guaranty contract with the Oregon Workers' Compensation Division before performing any Work. (g) Notice of Cancellation or Change-The Contractor shall not cancel, change materially, or take any action showing intent not to renew the insurance coverage(s)without 30 days'advance written notice from the Contractor or its insurer(s) to the Agency The Contractor shall be responsible for ensuring that insurance coverage(s) obtained by an appropriate subcontractor, as permitted by the Agency under 00170.70(a), are not cancelled, changed materially, or have any action taken by the subcontractor showing intent not to renew the insurance coverage(s)without 30 days'advance written notice from the Contractor or the insurer(s)to the Agency. Any failure to comply with the reporting provisions of this insurance shall not affect the coverage(s) provided to the Agency, County, City, or other applicable political jurisdiction or to the Agency's governing body, board, or Commission and its members,and the Agency's officers and employees. (h) Certificate(s) of Insurance-As evidence of the insurance coverages required by this Contract, the Contractor shall furnish Certificate(s)of Insurance to the Agency at the time(s) provided in 00130.50(a). As evidence of insurance coverages required by this Contract but permitted by the Agency under 00170.70(a)to be obtained by an appropriate subcontractor, the Contractor shall furnish Certificate(s) of Insurance to the Agency for such coverages together with the Contractor's request under 00180.21 for approval of the subcontract with that subcontractor. The Certificate(s) will specify all of the parties who are Additional Insureds. The Contractor shall obtain, or ensure that the appropriate subcontractors obtain, insurance coverages required under this Contract from insurance companies or entities acceptable to the Agency and authorized to issue insurance in the State. The Contractor, or the appropriate subcontractor, but not the Agency,shall be responsible for paying all deductibles, self-insured retentions and/or self-insurance included under these provisions. (i) Builders'Risk— If indicated by Special Provision,the Contractor shall obtain,at its expense,and keep in effect during the term of the Contract, Builder's Risk insurance on an all risks of direct physical loss basis, including,without limitation,earthquake and flood damage,for an amount equal to at least the value indicated in the Special Provisions. The policy shall not contain a coinsurance clause or any collapse exclusions. Any deductible shall not exceed $50,000 for each loss, except that the earthquake and flood deductible shall not exceed 5%of each loss or$50,000,whichever is greater.The policy shall include the Agency as loss payees. 87 General Conditions Revised 01/27/2026 00170 Conformed to Bid Documents 00170.71 Independent Contractor Status-The service or services to be rendered under this Contract are those of an independent contractor.The Contractor is not an officer, employee, or agent of the Agency State as those terms are used in ORS 30.265. 00170.72 Indemnity/Hold Harmless -To the fullest extent permitted by law, and except to the extent otherwise void under ORS 30.140, the Contractor shall indemnify, defend (with counsel approved by the Agency) and hold harmless the Agency, Agency's employees and authorized representatives, Design Engineer,Design Engineer's consultants,and their respective officers,directors,agents,employees,partners, members, stockholders and affiliated companies, and if indicated by Special Provisions that federal transportation funding is involved the State of Oregon,the Oregon Transportation Commission and the Oregon Department of Transportation and their respective officers and members and employees (collectively "Indemnitees") from and against all liabilities, damages, losses, claims, expenses (including reasonable attorney fees), demands and actions of any nature whatsoever that arise out of, result from or are related to the following: • Any damage, injury, loss, expense, inconvenience or delay described in this Section 00170. • Any accident or occurrence which happens or is alleged to have happened in or about the Project Site or any place where the Work is being performed,or in the vicinity of either,at any time prior to the time the Work is fully completed in all respects. • Any failure of the Contractor to observe or perform any duty or obligation under the Contract Documents that is to be observed or performed by the Contractor,or any breach of any agreement,duty,obligation, responsibility,covenant, provision, requirement, representation or warranty of the Contractor contained in the Contract Documents or in any subcontract. • The acts, errors or omissions of the Contractor, a subcontractor or anyone directly or indirectly employed by them or any one of them or anyone for whose acts they may be liable, regardless of whether or not such claim,damage, loss or expense is caused in part by a party indemnified hereunder but, in such case, only to Contractor's or subcontractor's proportionate extent. • Any failure to comply with all applicable Laws by the Contractor or any Subcontractor, or anyone employed by any one of them,or anyone for whose acts they may be liable. • Any lien filed upon the Project or bond claim in connection with the Work. Such obligation shall not be construed to negate, abridge, or reduce other rights or obligations of indemnity which would otherwise exist as to a party or person described in this Subsection. In claims against any person or Entity indemnified under this Subsection by an employee of the Contractor,a Subcontractor, anyone directly or indirectly employed by them or anyone for whose acts they may be liable, the indemnification obligation under this Subsection shall not be limited by a limitation on amount or type of damages, compensation or benefits payable by or for the Contractor or a Subcontractor under workers' compensation acts, disability benefit acts or other employee benefit acts. Notwithstanding the Contractor's foregoing defense obligations, neither the Contractor nor any attorney engaged by the Contractor shall defend any claim in the name of the Agency, nor purport to act as legal representative of the Agency, without the prior written consent of the Agency's legal counsel. The Agency may, at any time at its election, assume its own defense and settlement in the event that it determines that the Contractor is prohibited from defending the Agency,or that the Contractor is not adequately defending the Agency's interests, or that an important governmental principle is at issue or that it is in the best interests of the Agency to do so. The Agency reserves all rights to pursue any claims it may have against the Contractor. When federal transportation funding is involved, the following additional requirements apply: • The State of Oregon, the Oregon Transportation Commission and the Oregon Department of Transportation and their respective officers and members and employees (for purposes of this Subsection 00170.72 collectively"State")are additional Indemnitees. 88 General Conditions Revised 01/27/2026 00170 Conformed to Bid Documents • Neither Contractor nor Subcontractors nor any attorney engaged by the Contractor or Subcontractors shall defend any claim in the name of the State or purport to act as legal representative of the State or any of its agencies, without the prior written consent of the State's legal counsel, the Oregon Attorney General. State may,at any time at its election,assume its own defense and settlement in the event that it determines that the Contractor or Subcontractors are prohibited from defending the State, or that the Contractor or Subcontractors are not adequately defending the State's interests, or that an important governmental principle is at issue or that it is in the best interests of the State to do so.The State reserves all rights to pursue any claims it may have against the Contractor or Subcontractors. • Contractor shall include a provision in each subcontract requiring Subcontractors to indemnify, defend (with counsel approved by the State) and hold harmless the State in accordance with this Subsection 00170.72. 00170.74 Employee Drug Testing Program-As required by ORS 279C.505(2), the Contractor shall have in place, and maintain during the period of the Contract, an employee drug-testing program. The Agency retains the right to audit and/or monitor the program. On request by the Engineer,the Contractor shall furnish a copy of the employee drug-testing program. 00170.75 Oregon Tax Laws — The Contractor shall comply with Oregon tax laws as required by ORS 305.385. 00170.76 Subcontractors Nondiscrimination — The Contractor shall comply with ORS 279A.110 as to nondiscrimination as to relations with Subcontractors. 00170.78 Conflict of Interest-The Contractor shall not give or offer any gift, loan, or other thing of value to any member of the Agency's governing body or employee of the Agency in connection with the award or performance of any Contract. The Contractor shall not rent, lease, or purchase Materials, supplies, or Equipment, with or through any Agency employee or member of the Agency's governing body. No ex-employee of the Agency who has worked for the Agency on any phase of the Project within the prior two years may be employed by the Contractor to perform Work on the Project. 00170.79 Third Party Beneficiary-There are no third-party beneficiaries of the Contract, unless federal transportation funding is involved then the State of Oregon, the Oregon Transportation Commission and the Oregon Department of Transportation and their respective officers and members and employees, are third- party beneficiaries of the Contract. 00170.80 Responsibility for Damage to Work: (a) Responsibility for Damage in General-The Contractor shall perform Work, and furnish Materials and Equipment for incorporation into the Work, at the Contractor's own risk, until the entire Project has been completed and until Final Completion as determined by the Agency. The Contractor shall repair all damages to Work performed, Materials supplied, and Equipment incorporated into the Work, except as otherwise provided in this Section. (b) Repair of Damage to Work- Until Final Completion,the Contractor shall promptly rebuild, repair, restore, and make good damages to all portions of the permanent or temporary Work. The Contractor shall perform all repairs of damage to Work at no additional cost to the Agency, except for repairs necessitated by damage caused by: • Acts of God or Nature, as defined in Section 00110; or • Actions of governmental authorities. 89 General Conditions Revised 01/27/2026 00170 Conformed to Bid Documents (c) Vandalism and Theft—Vandalism includes damage to or destruction of Work or portions of Work that remain on the Project Site resulting from vandalism, criminal mischief, arson, or other criminal or illegal behavior. The Contractor shall provide protection of the Work from vandalism until Final Completion. Theft includes the loss of Work or portions of Work that are lost or stolen or otherwise unaccounted for from the Project Site or from Materials or fabrication locations. The Contractor shall remain solely responsible for all losses caused by theft, including without limitation theft that occurs in conjunction with vandalism. (d) Responsibility for Damage to Work Caused by Public Traffic-The Contractor may apply for relief of responsibility for damage to Work caused by Public Traffic by submitting a signed Contractor's Request for Relief of Responsibility, form 734-2768, to the Engineer by mail, personal delivery, courier, scanned and submitted via email,or other agreed-upon method. The Engineer will process a maximum of two forms per month and return the forms within 7 Calendar Days indicating each item as"approved"or"denied". The approval of the Engineer is limited,and is made only for the purposes of determining relief of responsibility for damage to completed portions of the Work caused by Public Traffic. The completed portions of the Work are not considered complete,and are not finally accepted for any other purposes under the Contract. 00170.82 Responsibility for Damage to Property and Facilities: (a) In General -As used in this Subsection, the term "Contractor" shall include the Contractor's agents, Subcontractors, and all workers performing Work under the Contract; and the term "damage" shall include without limitation soiling or staining surfaces by tracking or splashing mud, asphalt, and other materials, as well as damage of a more serious nature. The Contractor shall be solely responsible for damages arising from: • The Contractor's operations; • The Contractor's negligence,gross negligence, or intentional wrongful acts;and • The Contractor's failure to comply with any Contract provision. The Agency may withhold funds due the Contractor or the Contractor's Surety until all lawsuits, actions, and claims for injuries or damages are resolved,and satisfactory evidence of resolution is furnished to the Agency. (b) Protection and Restoration of Agency Property and Facilities-The following requirements apply to highways, highway Structures and other improvements that are existing, under construction, or completed. The Contractor shall: • Provide adequate protection to avoid damaging Agency property and facilities; • Be responsible for damage to Agency property and facilities caused by or resulting from the Contractor's operations; and • Clean up and restore such damage by repair, rebuilding, replacement, or compensation, as determined by the Engineer. (c) Protection and Restoration of Non-Agency Property and Facilities-The Contractor shall determine the location of properties and facilities that could be damaged by the Contractor's operations,and shall protect them from damage. The Contractor shall protect monuments and property marks until the Engineer has 90 General Conditions Revised 01/27/2026 00170 Conformed to Bid Documents referenced their location and authorized their removal. The Contractor shall restore property or facilities damaged by its operations to the condition that existed before the damage, at no additional compensation. The Contractor shall provide temporary facilities when needed, e.g.,to maintain normal service or as directed by the Engineer, until the required repair, rebuilding, or replacement is accomplished. The Contractor shall protect specific service signs,e.g., business logos, and tourist-oriented directional signs (TODS) from damage, whether the signs are to remain in place or be placed on temporary supports. The Contractor shall repair or replace damaged signs at no cost to the Agency. 00170.85 Responsibility for Defective Work-The Contractor shall make good any defective Work, Materials or Equipment incorporated into the Work, according to the provisions of Section 00150. (a) Latent Defects-The Contractor shall remain liable for all latent defects resulting from causes other than fraud or gross mistakes that amount to fraud until the expiration of all applicable statutes of limitation and ultimate repose, the Performance Bond, Warranty Bond, or Correction Period, whichever expires last. The Contractor shall remain liable for all latent defects resulting from fraud or gross mistakes that amount to fraud regardless of when those latent defects may be discovered,and regardless of whether such discovery occurs outside any applicable statutes of limitation or ultimate repose or any applicable Performance Bond,Warranty Bond, or Correction Period. (b) Correction Period Warranty for Agency Projects—The Contractor shall warrant all Work and workmanship,including Changed Work,Additional Work, Incidental Work,On-Site Work,and Extra Work,and Materials and Equipment incorporated in the Work,for one year from the date of Third Notification,except that manufacturers' warranties and extended warranties according to 00170.85(c) shall not be abridged. The Correction Period Warranty described herein shall include extension of the Performance Bond for a period of one year from the date of Third Notification. See Special Provisions The Contractor shall be responsible for meeting the technical and performance Specifications required, making good the Work,and for all repairs of damage to the Work and other improvements,natural and artificial structures, systems, equipment, and vegetation caused by, or resulting in whole or in part from, occurrences beginning during the warranty period and are the result of defects in Materials, Equipment,and workmanship. The Contractor shall be responsible for all costs associated with completing the repair of the defects and for associated Work including, but not limited to, permitting, mobilization, traffic control, erosion control, surface restoration,site cleanup and remediation caused by,or resulting in whole or in part from, defects in Materials, Equipment, or workmanship, and other Work determined by the Engineer to be necessary to complete the repair of the defects. Within 10 Calendar Days of the Agency's written notice of defects, the Contractor, or the Contractor's Surety, shall vigorously and continuously correct and repair the defects and all related damage. If the Contractor or the Contractor's Surety fails to correct and repair the defects,the Agency may have the correction and repair done by others. The Contractor or Contractor's Surety shall promptly reimburse the Agency for all expenses incurred to correct and repair the defects. In the event of an emergency, where delay could result in serious loss or damage, the Agency may make emergency corrections and repairs, without written notice. The Contractor or Contractor's Surety shall promptly reimburse the Agency for all expenses incurred to correct and repair the defects. Corrections, repairs, replacements or changes shall be warranted for an additional 1year period beginning on the date of the Agency's acceptance of the corrections, repairs, replacements or changes. Without limiting the general applicability of other survival clauses under the Contract, this warranty provision shall survive expiration or termination of the Contract. 91 General Conditions Revised 01/27/2026 00170 Conformed to Bid Documents (1) Manufacturer,Supplier or Installer Warranties-For those Specification Sections referencing this 00170.85(c-1) Subsection, the Contractor shall furnish Warranties from the Manufacturer, Supplier or Installer and signed by the respective authorized Representative. The warranty period will be specified in the applicable Specification Section for which it applies. The warranty period will begin on the date the Engineer issues Third Notification unless otherwise specified in the Contract. Corrections, repairs, replacements or changes shall be warranted for an additional Warranty period beginning on the date of the Agency's acceptance of the corrections, repairs, replacements or changes. When the Agency makes written notification to the Manufacturer,Supplier or Installer of failure of an item covered by this warranty, the warranty period will stop for the effected item or the portion of the effected item that failed, as applicable, until the required repairs or replacements are made and accepted. All repaired or replaced items shall meet current specifications, unless otherwise specified in the Contract, and will be warranted for the remaining warranty period. If, in the opinion of the Engineer, temporary repairs are necessary, the temporary repairs will be made by the Agency or an independent contractor at the Manufacturer's,Supplier's or Installer's expense. The Manufacturer,Supplier or Installer shall replace all temporary repairs at no additional cost to the Agency. The Manufacturer, Supplier or Installer shall provide all required traffic control during repair or replacement of failed items at no additional cost to the Agency. Warranty work shall be performed when weather permits. (2) Trade Practice Guarantees- For those Items installed on the Project that have customary trade practice guarantees,the Contractor shall furnish the guarantees to the Engineer at the completion of the Contract. 00170.89 Protection of Utility, Fire-control, and Railroad Property and Services; Repair; Roadway Restoration: (a) Protection of Utility, Fire-Control,and Railroad Property and Services; Coordination The Contractor shall avoid damaging the properties of Utilities, Railroads, railways,and fire-control authorities during performance of the Work. The Contractor shall cooperate with and facilitate the relocation or repair of all Utilities and Utility services, as required under 00150.50, and of Railroad and fire-control property and railways. The Contractor shall conduct no activities of any kind around fire hydrants until the local fire-control authority has approved provisions for continued service. The Contractor shall immediately notify any Utility, Railroad,or fire-control authority whose facilities have been damaged. If an Entity has a valid permit from the proper authority to construct, reconstruct, or repair Utility, Railroad, or fire-control service in the Roadway,the Contractor shall allow the permit holder to perform the work. (b) Restoration of Roadway after Repair Work-The Contractor shall restore the Roadway to a condition at least equal to that which existed before the repair work addressed under this Subsection was performed, as directed by the Engineer, at no additional cost to the Agency. All restoration work required as a result of Contractor's failure to protect Utilities, Railroads, railways and fire-control facilities shall be at the Contractor's expense. Restoration which constitutes Extra Work will be paid as Extra Work. 92 General Conditions Revised 01/27/2026 00170 Conformed to Bid Documents 00170.92 Fencing, Protecting Stock, and Safeguarding Excavations-The Contractor shall be responsible for loss, injury, or damage that results from its failure to restrain stock and persons. (a) At the Contractor's Expense-The Contractor shall restrain stock to lands on which they are confined using temporary fences or other adequate means. The Contractor shall provide adequate temporary fences or other protection around excavations to prevent animals and unauthorized persons from entering. The Contractor shall repair, at Contractor's expense and to the Engineer's satisfaction, fences damaged by the Contractor's operations and the operations of the Contractor's agents, employees and Subcontractors. (b) At the Agency's Expense-The Contractor shall construct fences, or move and reconstruct fences, as shown on the Contract Documents or as directed by the Engineer. The Contractor shall tear down and remove fencing within the Right-of-Way when no longer needed, as part of the removal Work described in and paid for according to Section 00310. 00170.93 Trespass-The Contractor shall be responsible for its own, its agents' and employees', and its Subcontractors'trespass or encroachment upon, or damage to, property during performance of the Contract. 00170.94 Use of Explosives-The Contractor shall comply with all Laws pertaining to the use of explosives. The Contractor shall notify anyone having facilities near the Contractor's operations of the Contractor's intended use or storage of explosives. The Contractor shall be responsible for all damage resulting from its own, its agents' and employees', and its Subcontractors' use of explosives. (see 00330.41(e) and Section 00335) 93 General Conditions Revised 01/27/2026 00180 Conformed to Bid Documents Section 00180-Prosecution and Progress 00180.00 Scope-This Section consists of requirements for assignment of the Contract,subcontracting,time for performance, Contract responsibility, suspensions, terminations, and related provisions. 00180.05 Assignment/Delegation of Contract-Unless the Agency gives prior written consent, the Contractor shall not assign, delegate, sell, or transfer to any Entity, or otherwise transfer or dispose of any Contract rights or obligations under the Contract,whether voluntarily or involuntarily, and whether by merger, consolidation,dissolution,operation of law, or any other manner, including,without limitation: • The power to execute or duty to perform the Contract; or • Any of its right, title or interest in the Contract. Any purported or attempted assignment,delegation,sale,transfer or disposition without prior Agency consent shall be voidable. Such Agency consent will not normally be given except for the assignment of funds due under the Contract, as provided in 00180.06. If written Agency consent is given to assign, delegate, sell, or otherwise transfer or dispose of any Contract rights or obligations under the Contract, such consent, it shall not relieve the Contractor or its Surety of any part of their duties, obligations, responsibilities, or liabilities responsibility under or pursuant to the Contract. 00180.06 Assignment of Funds Due under the Contract-Assignment of funds due or to become due under the Contract to the Contractor will not be permitted unless: • The assignment request is made on the form provided by acceptable to the Agency; • The Contractor secures the written consent of the Contractor's Surety to the assignment;and • The Engineer approves the assignment,which will not be unreasonably withheld. 00180.10 Responsibility for Contract-The Contractor shall direct and coordinate the operations of its employees, Subcontractors and agents performing Work, and see that the Engineer's orders are carried out promptly. The Contractor's failure to direct, supervise and control its employees, Subcontractors and agents performing Work will result in one or more of the following actions, or other actions as the Engineer deems appropriate: • Suspension of the Work; • Withholding of Contract payments,as necessary to protect the Agency; • Ordering removal of individuals from the Project Site;or • Termination of the Contract. Action by the Agency under this provision will not prejudice any other remedy it may have. 00180.15 Agency's Right to Do Work at Contractor's Expense-Except as otherwise provided in 00150.75 and 00220.60, if the Contractor neglects to prosecute the Work properly or fails to perform any provision of the Contract,the Agency may, after two Calendar Days'written notice, correct the deficiencies at the Contractor's expense. In situations where the Engineer reasonably believes there is danger to life or property,the Agency may immediately and without notice correct the deficiencies at the Contractor's expense. Action by the Agency under this provision will not prejudice any other remedy it may have. 94 General Conditions Revised 01/27/2026 00180 Conformed to Bid Documents 00180.20 Subcontracting Limitations: (a) General-The Contractor's own organization shall perform Work amounting to at least the percentage of the original Contract Amount.as indicated in the Special Provisions. The value of subcontracted Work is the full compensation to be paid to the Subcontractor(s)for all pay items in the Subcontract(s). (b) Own Organization-The term"own organization", as used in Section 00180, includes only employees of the Contractor, Equipment owned or rented by the Contractor, Incidental rental of operated Equipment, truck hauling of materials not included in or requiring a subcontract,and Materials and Equipment to be incorporated into the Work purchased or produced by the Contractor. (c) Rental of Operated Equipment-The Agency will not allow a Disadvantaged Business Enterprise(DBE) firm to provide services without a subcontract covering all Work to be performed by the DBE firm. (d) Disadvantaged Business Enterprise (DBE)-Every agreement to perform Work, including, without limitation,subcontracts,trucking services agreements, purchase orders,and rental agreements,shall indicate whether the Work will be performed by a DBE or non-DBE. (e) Trucking-This Section does not apply to delivery of Materials by or for or from a Supplier. This Subsection applies to all truck hauling of materials not performed with trucks owned (or rented)and operated by the Contractor. If the services under Rental of Operated Equipment or Trucking are provided by a committed DBE firm, a subcontract is required under 00180.21. For this purpose, a committed DBE firm is one that was identified by the Contractor to meet an assigned DBE goal including DBE firms substituting for DBE firms committed as a condition of Contract Award. (1) Trucking Services Agreement-The Contractor shall submit at the preconstruction conference one or more proposed trucking services agreements for all trucking services for hauling materials. The proposed agreements shall include: • Statement specifying whether the services will be provided by a DBE; • Statement specifying whether the services will be provided by an owner/operator; • Prompt payment clause(10 days)(ORS 279C.580); • Interest penalty clause(ORS 279C.580); • Lower-tier clause (ORS 279C.580); • Statement about the provider's ability to file a complaint with the Construction Contractors Board (ORS 279C.515); • Statement that workers shall be paid not less than the specified minimum hourly rate of wage (ORS 279C.830)as applicable; • Provision requiring the provider to have a public works bond filed with the Construction Contractors Board before starting work on the Project, unless exempt under ORS 279C.836(4) or (9), or has elected to not file a bond under ORS 279C.836(7) or (8), or is otherwise not applicable; • Insurance clauses that include Commercial Automobile Liability and Workers Compensation (ORS 656.017 unless exempt under ORS 656.126); • Provision requiring the provider to comply with applicable Contract provisions, including,without limitation, Record Requirements in 00170.07; and • Construction Contractors Board License Number if applicable. The Agency must review and consent to the proposed trucking services agreements prior to use. (2) Limitations-The approved trucking services agreements shall be used for all trucking services for hauling materials not provided by trucks owned (or rented) and operated by the Contractor except for 95 General Conditions Revised 01/27/2026 00180 Conformed to Bid Documents trucking services provided by committed DBEs that require a subcontract under 00180.21. The Contractor shall execute a trucking services agreement with every trucking services provider for hauling materials prior to the trucking services provider doing any Work on the Project Site. (3) Submittals-The Contractor shall provide the Engineer with an executed copy of the trucking services agreement not later than 2 Days after the trucking services provider for hauling materials has started work. The Contractor shall make certain that the provider of approved trucking services submits payrolls required under Section 00170, complies with applicable Contract provisions, including, without limitation, 00170.07, and complies with applicable trucking services agreement provisions. The work or service provider will not be considered a Subcontractor under the Contract, but the work or services will be considered to have been performed by the Contractor's own organization for the purposes of determining compliance with 00180.20(a). If the trucking services are provided by an owner/operator: • Attach a copy of the data required under 00170.65(b)(4)to the trucking services agreement;and • Each truck shall have the name of the owner/operator clearly displayed on the side of the truck. (4) Revocation of Approval-The Engineer may revoke approval for trucking services provided under the trucking services agreement at any time the Engineer determines that the work or service is outside that authorized under 00180.20(e). Upon revocation of approval, the service provider shall be immediately removed from the Project Site. 00180.21 Subcontracting: (a) General-The Contractor shall not subcontract or perform any portion of the Contract by other than the Contractor's own organization without the Agency's prior written consent. A request for consent to subcontract,at any tier, solely for the furnishing of a labor force will not be considered. A written request for consent to subcontract any portion of the Contract at any tier shall be submitted to the Engineer, along with documentation of the good faith efforts to employ a COBID-certified subcontractor, and when required by the Engineer, shall be accompanied by background information showing that the organization proposed to perform the Work is experienced and equipped for such Work. The Agency will review the Contractor's submission to verify compliance with Contract requirements, confirm the percentage of Work subcontracted,COBID good faith efforts,and evaluate the proposed Subcontractor's ability to perform the Work. If the Agency approves the Contractor's request to subcontract, the Agency will provide its written notice of its determination to give or withhold consent to the Contractor's request as follows: • If the Subcontractor is not providing any of the insurance coverages as permitted under 00170.70(a), the Agency will respond within 7 Calendar Days after the Engineer's receipt of the request. • If the subcontractor is not providing any of the insurance coverages as permitted under 00170.70(a), the Agency will respond within seven (7) Calendar Days after the Engineer's receipt of the request. (28 Calendar Days for the Agency to review and approve the Certificates of Insurance required by 00170.70(g)plus seven (7)Calendar Days to review and approve the subcontract request.) • The Engineer may revoke consent to subcontract. If the Engineer revokes consent to subcontract, the Subcontractor shall be immediately removed from the Project Site. • If the subcontractor is providing any of the insurance coverages as permitted under 00170.70(a),the Agency will respond within 14 Calendar Days after the Engineer's receipt of the request. (Seven (7) Calendar Days for the Agency to review and approve the Certificates of Insurance required by 00170.70(f)plus seven (7)Calendar Days to review and approve the subcontract request.) (b) Submittal of Requests-The Contractor must submit requests for consent to subcontract any portion of the Contract, at any tier, to the Engineer. The Contractor shall attach a duplicate original subcontract agreement. The Contractor must also submit in writing any amendments or modifications proposed to Agency- 96 General Conditions Revised 01/27/2026 00180 Conformed to Bid Documents approved subcontract agreements,at any tier, before the affected Work begins. The Agency's written consent will be required before such amendments or modifications become effective. (c) Substitution of Disclosed Subcontractors-The Contractor may only substitute a previously disclosed first-tier Subcontractor according to the provisions of ORS 279C.585 or a previously disclosed COBID subcontractor according to the provisions of subsection (a)above. The Contractor shall provide the Engineer with a written notification that identifies the name of the proposed new Subcontractor and the reason for the substitution. Authorized reasons for substitution are limited to the following circumstances (see ORS 279C.585(1)through ORS 279C.585(10)): • The disclosed Subcontractor fails or refuses to execute a written contract that is reasonably based either upon the Project Plans and Specifications,or the terms of the Subcontractor's written Bid,after having had a reasonable opportunity to do so; • The disclosed Subcontractor becomes bankrupt or insolvent; • The disclosed Subcontractor fails or refuses to perform the contract; • The disclosed Subcontractor fails or refuses to meet the bond requirements of the prime Contractor that had been identified prior to the Bid submittal; • The Contractor demonstrates to the Agency that the Subcontractor was disclosed as the result of an inadvertent clerical error; • The disclosed Subcontractor does not hold a license from the Construction Contractors Board and is required to be licensed by the board; • The Contractor determines that the Work performed by the disclosed Subcontractor is not in substantial compliance with the Plans and Specifications, or that the Subcontractor is substantially delaying or disrupting the progress of the Work; • The disclosed Subcontractor is ineligible to work on a public improvement according to the applicable statutory provisions; • The substitution is for"good cause"as defined by State Construction Contractors Board rule; or • The substitution is reasonably based on the Contract alternates chosen by the Agency. (d) Terms of Subcontracts-All Subcontracts shall provide that work performed under the subcontract shall be conducted and performed according to, and shall include, the pertinent requirements, provisions, terms, and conditions of the Contract, including but not limited to the requirements of 00170.72. Compliance with 00170.07 is required. All subcontracts, including Contractor's with the first-tier Subcontractors and those of the first-tier Subcontractors with their subcontractors, and any other lower-tier subcontracts shall contain a clause or condition that if the Contractor or a subcontractor fails, neglects, or refuses to make payment to an Entity furnishing labor or Materials in connection with the Contract, the Entity may file a complaint with the Construction Contractors Board, unless payment is subject to a good-faith dispute as defined in ORS 279C.580. Additionally, according to the provisions of ORS 279C.580, subcontracts shall include: (1) A payment clause that obligates the Contractor to pay the first-tier Subcontractor for satisfactory performance under the subcontract within 10 Calendar Days out of amounts the Agency pays to the Contractor under the Contract. (2) A clause that requires the Contractor to provide the first-tier Subcontractor with a standard form that the first-tier Subcontractor may use as an application for payment or as another method by which the Subcontractor may claim a payment due from the Contractor. (3) A clause that requires the Contractor, except as otherwise provided in this subsection, to use the same form and regular administrative procedures for processing payments during the entire term of the subcontract. The Contractor may change the form or the regular administrative procedures the Contractor uses for processing payments if the Contractor: 97 General Conditions Revised 01/27/2026 00180 Conformed to Bid Documents • Notifies the Subcontractor in writing at least 45 Calendar days before the date on which the Contractor makes the change;and • Includes with the written notice a copy of the new or changed form or a description of the new or changed procedure. (4) An interest penalty clause that obligates the Contractor, if the Contractor does not pay the first-tier Subcontractor within 30 Calendar Days after receiving payment from the Agency, to pay the first-tier Subcontractor an interest penalty on amounts due in each payment the Contractor does not make in accordance with the payment clause included in the subcontract under 00180.21(d)(1). The Contractor or first-tier Subcontractor is not obligated to pay an interest penalty if the only reason that the Contractor or first-tier Subcontractor did not make payment when payment was due is that the Contractor or first-tier Subcontractor did not receive payment from the Agency or the Contractor when payment was due. The interest penalty applies to the period that begins on the day after the required payment date and ends on the date on which the amount due is paid;and shall be computed at the rate specified in 00170.10(c). (5) A clause that requires the Contractor's first-tier Subcontractor to include a payment clause and an interest penalty clause that conform to the standards of ORS 279C.580 (see 00180.21(d)(1) and 00180.21(d)4)) in each of the first-tier Subcontractor's subcontracts and to require each of the first-tier Subcontractor's subcontractors to include such clauses in their subcontracts with each lower-tier subcontractor or Material supplier. These payment clauses shall require the Contractor to return all retainage withheld from the Subcontractor,whether held by the Contractor or the Agency, as specified in 00195.50(d). As required by ORS 279C.800 through ORS 279C.870,subcontracts shall include: • A provision requiring the subcontractor to have a public works bond filed with the Construction Contractors Board before starting Work on the Project, unless exempt. • A provision requiring that the workers shall be paid not less than the specified minimum hourly rate of wage. As and when applicable, the Contractor shall require in its subcontracts that Subcontractors maintain the certifications required by ORS 279A.107. (e) Contractor's Responsibilities-As a condition of the Agency's grant of consent to subcontract,whether or not stated in the subcontract agreement itself, the Contractor shall remain solely responsible for administration of the subcontract, including, but not limited to: • Performance of subcontracted Work; • Progress of subcontracted Work; • Payments for accepted subcontracted Work; and • Disputes and claims for additional compensation regarding subcontracted Work. It shall be the direct responsibility of the Contractor to ensure that each and every Subcontractor will not only be issued a complete and current set of Plans and Specifications,but also that these Plans and Specifications are on the project site and in use by the Subcontractor when it is performing its portion of the project. Subcontracted Work shall not create a contract between the Agency and the Subcontractor, will not convey to the Subcontractor any rights against the Agency, and will not relieve the Contractor or the Contractor's Surety of any of their responsibilities under the Contract. (f) Failure to Comply- Failure to comply with 00180.21 will be cause for the Engineer to take action reasonably necessary to obtain compliance. This action may include, but is not limited to: 98 General Conditions Revised 01/27/2026 00180 Conformed to Bid Documents • Suspension of the Work; • Withholding of Contract payments as necessary to protect the Agency; and • Termination of the Contract. 00180.22 Payments to Subcontractors and Agents of the Contractor-To the extent practicable, the Contractor shall pay in the same units and on the same basis of measurement as listed in the Schedule of Items for subcontracted Work or other Work not done by the Contractor's own organization. The Agency will not be responsible for any overpayment or losses resulting from overpayment by the Contractor to Subcontractors and to its other agents,work providers, service providers, and trucking service providers. If requested, the Engineer will make estimates of the Work quantities performed by Subcontractors or by others on the Project, and of Materials eligible for advances on Materials in the progress payments. These estimates are approximate only, and will be made in units of measure as listed in the Schedule of Items. The Agency does not guarantee the accuracy of these estimates,and an incorrect estimate will not bind the Agency in final settlement. If requested in writing by a first-tier Subcontractor, the Contractor shall send to the Subcontractor, within 10 Calendar Days of receiving the request, a copy of that portion of any invoice or request for payment submitted to the Agency, or pay document provided by the Agency to the Contractor, specifically related to any labor, Equipment, or Materials supplied by the first-tier Subcontractor. 00180.30 Materials, Equipment, and Work Force-The Contractor shall furnish suitable and sufficient Materials, Equipment,and personnel to properly prosecute and complete the Work. The Contractor shall use only Equipment of adequate size and condition to meet the requirements of the Work and Specifications, and to produce a satisfactory quality of Work. Upon receipt of the Engineer's written order, the Contractor shall immediately remove,and not use again on the Project without the Engineer's prior written approval,Equipment that, in the Engineer's opinion,fails to meet Specifications or produce a satisfactory product or result. The work force shall be trained and experienced for the Work to be performed. Upon receipt of the Engineer's written order, the Contractor shall immediately remove from the Project Site, and shall not employ again on the Project without the Engineer's prior written approval, any supervisor, or employee,worker, agent or other provider of the Contractor or of any subcontractor or Supplier who, in the Engineer's opinion,does not perform satisfactory Work or whose conduct interferes with the progress of the Work. If the Contractor fails to remove Equipment or persons as ordered, or fails to furnish suitable and sufficient Materials, Equipment and personnel for the proper prosecution of the Work, the Engineer may suspend the Work by written notice until such orders are complied with and such deficiencies are corrected,or the Engineer may terminate the Contract under the provisions of 00180.90(a). 00180.31 Required Materials, Equipment, Products, and Methods-The Engineer's decisions under this Section are final. Substitutions after Award will be considered as provided below unless specified as the subject of an exemption per ORS 279C.345. See 00120.16 for possible substitutions before Bid Opening. (a) General-When the Equipment and methods to be used are not specified in the Contract, any Equipment or methods that accomplish the Work as required by the Contract will be permitted. When the Contract specifies certain Equipment or methods, the Contractor shall use the Equipment or methods specified unless otherwise authorized by the Engineer in writing. (b) Substitution of Materials, Products, and Equipment to be Incorporated into the Work-After execution of the Contract,the Engineer may approve substitution of Materials, products,and Equipment to be incorporated into the Work as follows: (1) Reasons for Substitution-The Engineer will consider substitution only if: 99 General Conditions Revised 01/27/2026 00180 Conformed to Bid Documents • In the judgement of the Engineer, the proposed Materials, products, or Equipment are equal to or superior to the specified items in construction, efficiency and utility; or • Due to reasons beyond the control of the Contractor, the specified Materials, products, or Equipment cannot be delivered to the Project in sufficient time to complete the Work in proper sequence. (2) Submittal of Request-The Contractor shall submit requests for substitution to the Engineer, including manufacturers' brochures and other information needed to verify equality of the proposed item(s). (c) Substitution of Equipment Specified to Perform Work-The Agency encourages development of new or improved Equipment and innovative use of Equipment. When the Specifications require Equipment of a particular size or type to be used to perform certain portions of the Work,the Contractor may submit a request to the Engineer to use Equipment of a different size or type. The request will not be considered as a cost reduction proposal under 00140.70. The request shall: • Be in writing and include a full description of the Equipment proposed and its intended use; • Include the reasons for requesting the substitution; and • Include evidence, obtained at the Contractor's expense and satisfactory to the Engineer, that the proposed Equipment is capable of functioning as well as or better than the specified Equipment. The Engineer will consider the Contractor's request and will provide a written response to the Contractor, either permitting or denying use of the proposed Equipment. Permission may be granted on a trial basis to test the quality of Work actually produced, subject to the following: • There will be no cost to the Agency, either in Contract Amount or in Contract Time; • The permission may be withdrawn by the Engineer at any time if, in the Engineer's opinion, the Equipment is not performing in all respects equivalent to the Equipment specified in the Contract; • If permission is withdrawn, the Contractor shall perform the remaining Work with the originally-specified Equipment; and • The Contractor shall remove and replace non-specification Work resulting from the use of the Contractor's proposed Equipment, or otherwise correct it as the Engineer directs, at no additional compensation. (d) Substitution of Methods-The Agency encourages development of new, improved, and innovative construction methods. When the Plans or Specifications require a certain construction method for a portion of the Work,the Contractor may submit a request for a change by following the provisions of 00140.70, "Cost Reduction Proposals". 00180.32 Alternative Materials, Equipment, and Methods-Whenever the Contract authorizes certain alternative Materials, Equipment, or methods of construction for the Contractor's use to perform portions of the Work, and leaves the selection to the Contractor,the Agency does not guarantee that all listed alternative Materials, Equipment, or methods of construction can be used successfully throughout all or any part of the Work. The Contractor shall employ only those alternatives that can be used to satisfactorily perform the Work. No additional compensation will be paid for corrective work necessitated by the Contractor's use of an inappropriate alternative. 00180.40 Limitation of Operations: 100 General Conditions Revised 01/27/2026 00180 Conformed to Bid Documents (a) In General-The Contractor shall comply with all Contract provisions and shall: • Conduct the Work at all times so as to cause the least interference with traffic, and • Not begin Work that may allow damage to Work already started. (b) On-Site Work-The Contractor shall not begin On-Site Work until the Contractor has: • Received Notice to Proceed; • Filed with the Construction Contractors Board the public works bond as required in 00170.20; • An approved Project Work schedule; • An approved Traffic Control Plan; • An approved Spill Prevention Control and Countermeasure Plan, if required; • An approved Pollution Control Plan; • An approved Erosion and Sediment Control Plan; • Met with the Engineer at the required preconstruction conference; and • Assembled all Materials, Equipment, and labor on the Project Site, or has reasonably assured that they will arrive on the Project Site,so the Work can proceed according to the Project Work schedule. • See Special Provisions 00180.41 Project Work Schedules-The Contractor shall submit a Project Work schedule meeting the requirements of this Subsection to the Engineer. The Project Work schedule is intended to identify the sequencing of activities and time required for prosecution of the Work. The schedule is used to plan, coordinate, and control the progress of construction. Therefore, the Project Work schedule shall provide for orderly, timely, and efficient prosecution of the Work, and shall contain sufficient detail to enable both the Contractor and the Engineer to plan, coordinate, analyze, document, and control their respective Contract responsibilities. Sufficient detail shall also include all required double shifts,overtime work,or combination of both necessary to complete Contract Work within the Contract Time. The Contractor shall submit a schedule or plan for each activity that is behind schedule showing, in sufficient detail, the proposed corrective action to complete Contract Work within the Contract Time. Sufficient detail shall include all required double shifts, overtime work, or combination of both. Contractor's activity related to developing, furnishing, monitoring, and updating these required schedules is Incidental. The Contractor shall submit a supplemental "look ahead" Project Work schedule each week to the Engineer prior to or at each Project progress meeting. The'look ahead" Project Work schedule is supplemental to the Type A, B, or C schedule specified below. The supplemental'look ahead" Project Work schedule shall: • Identify the sequencing of activities and time required for prosecution of the Work. • Provide for orderly,timely, and efficient prosecution of the Work. • Contain sufficient detail to enable both the Contractor and the Engineer to plan, coordinate, analyze, document, and control their respective Contract responsibilities. The supplemental "look ahead" Project Work schedule shall be written in common terminology and show the planned Work activities broken down into logical, separate activities by area, stage, and size and include the following information: • The resources the Contractor, subcontractors, or services will use. 101 General Conditions Revised 01/27/2026 00180 Conformed to Bid Documents • The locations of each activity that will be done including the limits of the work by mile posts,stations,or other indicators. • The time frames of each activity by Calendar Days, shifts, and hours. • All anticipated shoulder, lane, and road closures. At a minimum,the Contractor shall prepare a bar chart that: • Shows at least three weeks of activity including the week the bar chart is issued. • Uses a largest time scale unit of one Calendar Day. Smaller time scale units may be used if needed. • Is appropriate to the activities. • Identifies each Calendar Day by month and day. Include the Contract name, Contract number, Contractor's name, and date of issue on each page of the bar chart. The Contractor shall submit the supplemental"look ahead" Project Work schedule starting at First Notification and continuing each week until Second Notification has been issued and all punch list items and final trimming and clean-up has been completed. The Contractor shall meet with the Engineer each week to review the supplemental "look ahead" Project Work schedule. If the Engineer or the Contractor determines that the current supplemental "look ahead" Project Work schedule requires changes or additions, either notations can be made on the current schedule or the Engineer may require the submittal of a revised supplemental "look ahead" Project Work schedule. Review of the current and subsequent supplemental "look ahead" Project Work schedules does not relieve the Contractor of responsibility for timely and efficient execution of the Contract. One of the following Type"A","B",or"C"schedules will be required under the Contract. The type of schedule will be identified in the Special Provisions. (a) Type "A"Schedule-When a Type"A"schedule is required,the Contractor shall do the following: (1) Schedule-Five Calendar Days prior to the preconstruction conference,the Contractor shall provide to the Engineer four copies of a Project Work schedule, including a time-scaled bar chart and narrative, showing: • Expected beginning and completion dates of each activity, including all staging; and • Elements of the Traffic Control Plan as required under 00221.06. The schedule shall show detailed Work activities as follows: • Construction activities; • The time needed for completion of the utility relocation work; • Submittal and approval of Materials samples and shop drawings; • Fabrication, installation, and testing of special Materials and Equipment; and • Duration of Work, including completion times of all stages and their sub phases. For each activity,the Project Work schedule shall list the following information: • A description in common terminology; • The quantity of Work,where appropriate, in common units of measure; • The activity duration in Calendar Days; and • Scheduled start, completion, and time frame shown graphically using a time-scaled bar chart. 102 General Conditions Revised 01/27/2026 00180 Conformed to Bid Documents The schedule shall show the Work broken down into logical, separate activities by area, stage, or size. The duration of each activity shall be verifiable by manpower and Equipment allocation, in common units of measure, or by delivery dates. The bar chart shall be prepared as follows: • The length of bar shall represent the number of workdays scheduled. • The time scale shall be appropriate for the duration of the Contract. • The time scale shall be in Calendar Days. • The smallest unit shown shall be one Calendar Day. • The first day and midpoint of each month shall be identified by date. • Distinct symbols shall be used to denote multiple shift, holiday, and weekend Work. Each page of the bar chart shall include a title block showing the Contract name and number, Contractor's name,date of original schedule,and all update dates;and a legend containing the symbols used, their definitions, and the time scale, shown graphically. To ensure readability the bar chart shall be drawn on a reasonable size of paper up to a maximum of 36 inch by 36 inch, using multiple sheets when needed. Within seven Calendar Days after the preconstruction conference,the Engineer and the Contractor shall meet to review the Project Work schedule as submitted. The Engineer will review the schedule for compliance with all Contract Time limitations and other restraints. Review of this and subsequent schedules by the Engineer shall not relieve the Contractor of responsibility for timely and efficient execution of the Contract. Within 10 Calendar Days of this meeting,the Contractor shall resubmit to the Engineer four copies of the Project Work schedule, including required revisions. (2) Review by the Engineer-The Project Work schedule may need revision as the Work progresses. Therefore, the Contractor shall periodically review the Project Work schedule and progress of the Work with the Engineer. If the Engineer or the Contractor determines that the Project Work schedule no longer represents the Contractor's own plans or expected time for the Work, a meeting shall be held between the Engineer and the Contractor. At this meeting, the Contractor and the Engineer shall review Project events and any changes for their effect on the Project Work schedule. The Contractor shall compile an updated Project Work schedule incorporating any changes to the Project completion time(s). The bar chart shall reflect the updated information. The Contractor shall submit four copies of the updated Project Work schedule to the Engineer within seven Calendar Days after the meeting. The report shall include without limitation the following: • Sufficient narrative to describe the past progress, anticipated activities, and stage Work; • A description of any current and expected changes or delaying factors and their effect on the construction schedule; and • Proposed corrective actions. (b) Type "B" Schedule-When a Type"B"Schedule is required,the Contractor shall do the following: (1) Initial Schedule- Five Calendar Days prior to the preconstruction conference,the Contractor shall provide to the Engineer four copies of a time-scaled bar chart Project Work schedule showing: • Expected beginning and completion date of each activity, including all staging; and • Elements of the Traffic Control Plan as required under 00221.06. 103 General Conditions Revised 01/27/2026 00180 Conformed to Bid Documents The initial schedule shall show all Work intended for the first 60 Days of the Contract to the level of detail described in (2)below, and shall show the priority and interdependence(sequencing and network logic) of all major segments of the remainder of the Work. (2) Detailed Schedule- In addition to the above requirements, and within 30 Calendar Days after the Notice to Proceed, the Contractor shall provide the Engineer one digital copy and four paper copies of a detailed time-scaled bar chart Project Work schedule indicating the critical course of the Work. The digital copy shall be compatible with MS Project 2003, Primavera P3, SureTrak Project Manager 3.0, or another scheduling program approved by the Engineer. Detailed work schedule activities shall include the following: • Construction activities; • The time needed for completion of the utility relocation work; • Submittal and approval of Material samples and shop drawings; • Procurement of critical Materials; • Fabrication, installation, and testing of special Material and Equipment; and • Duration of Work, including completion times of all stages and their sub phases. For each activity,the Project Work schedule shall list the following information: • A description in common terminology; • The quantity of Work,where appropriate, in common units of measure; • The activity duration in normal workdays; and • Scheduled start, completion, and time frame shown graphically using a time-scaled bar chart. The schedule shall show the Work broken down into logical, separate activities by area, stage, or size. The duration of each activity shall be verifiable by manpower and Equipment allocation, in common units of measure, or by delivery dates. The bar chart shall be prepared as follows: • The length of bar shall represent the number of normal workdays scheduled. • The time scale shall be appropriate for the duration of the Contract. • The time scale shall be in normal workdays (every day except Saturday, Sunday, and legal holidays). • The smallest unit shown shall be one Calendar Day. • The first day and midpoint of each month shall be identified by date. • Distinct symbols shall be used to denote multiple shift, holiday, and weekend Work. The bar chart drawing(s)shall include a title block showing the Contract name and number,Contractor's name, date of original schedule, and all update dates; and a legend containing the symbols used, their definitions,and the time scale,shown graphically. To ensure readability the bar chart shall be drawn on a reasonable size of paper up to a maximum of 36 inch x 36 inch, using multiple sheets when needed. Within 10 Calendar Days after submission of the Project schedule the Engineer and the Contractor shall meet to review the Project schedule as submitted. Within 10 Days of the review meeting,the Contractor shall resubmit to the Engineer one digital and four paper copies of the Project schedule, including required revisions. 104 General Conditions Revised 01/27/2026 00180 Conformed to Bid Documents The accepted Project schedule shall represent all Work, as well as the planned sequence and time for the Work. Review of this and subsequent schedules by the Engineer shall not relieve the Contractor of responsibility for timely and efficient execution of the Contract. (3) Review and Reporting-The Project Work schedule may require revision as the Work progresses. Therefore,the Contractor shall monitor and when necessary revise the Project Work schedule as follows: a. Review with the Engineer-The Contractor shall perform ongoing review of the Project Work schedule and progress of the Work with the Engineer. If the Engineer or the Contractor determines that the Project Work schedule no longer represents the Contractor's own plans or expected time for the Work, a meeting shall be held between the Engineer and the Contractor. At this meeting, the Contractor and the Engineer shall review Project events and any changes for their effect on the Project Work schedule. After any necessary action has been agreed upon,the Contractor shall make required changes to the Project Work schedule. The Contractor shall collect information on all activities worked on or scheduled to be worked on during the previous report period, including shop drawings, Material procurement, and Contract Change Orders that have been issued. Information shall include commencement and completion dates on activities started or completed, or if still in progress,the remaining time duration. The Contractor shall develop detailed sub-networks to incorporate changes, Additional Work, and Extra Work into the Project Work schedule. Detailed sub-networks shall include all necessary activities and logic connectors to describe the Work and all restrictions on it. The restraints shall include those activities from the Project Work schedule that initiated the sub-network as well as those restrained by it. The Contractor shall evaluate this information and compare it with the Contractor's project schedule. If necessary, the Contractor shall make an updated bar chart schedule to incorporate the effect changes may have on the Project completion time(s). For any activity that has started,the Contractor shall add a symbol to show the actual date the activity started and the number of normal workdays remaining until completion. For activities that are finished,a symbol shall be added to show the actual date. The Contractor shall submit one digital and four paper copies of the updated bar chart to the Engineer within seven Days after the progress meeting, along with a progress report as required by "b."below. b. Progress Report-The Contractor shall submit a progress report to the Engineer each month. The report shall include the following: • Sufficient narrative to describe the past progress, anticipated activities, and stage Work; • A description of any current and expected changes or delaying factors and their effect on the construction schedule; and • Proposed corrective actions. (c) Type "C" Schedule-When a Type"C"Schedule is required,the Contractor shall do the following: (1) Initial Schedule- 10 Calendar Days prior to the preconstruction conference, the Contractor shall provide to the Engineer one digital copy and four paper copies of a time-scaled bar chart Project Work schedule. The digital copy shall be compatible with MS Project 2003, Primavera P3, SureTrak Project Manager 3.0,or another scheduling program approved by the Engineer. The initial schedule shall show: • The expected beginning and completion date of each activity, including all stages and phases; • The time needed for completion of the utility relocation work;and • The elements of the traffic control plan as required under 00221.06. 105 General Conditions Revised 01/27/2026 00180 Conformed to Bid Documents A logic diagram and a time-scaled bar chart will be acceptable in lieu of a time-scaled logic diagram. The initial schedule shall show all Work intended for the first 60 Days of the Contract to the level of detail described in (2)below, and shall show the priority and interdependence(sequencing and network logic) of all major segments of the remainder of the Work. (2) Detailed Project Work Schedule- In addition to the above requirements, and within 30 Calendar Days after First Notification, the Contractor shall provide the Engineer one digital copy and four paper copies of a detailed time-scaled critical path method (CPM) network Project Work schedule and computer analysis printout, both clearly indicating the critical path. The digital copy shall be compatible with MS Project 2003, Primavera P3, SureTrak Project Manager 3.0, or another scheduling program approved by the Engineer. The first submitted detailed time-scaled critical path method (CPM)network Project Work schedule shall also contain a listing of the quantity of Work for each activity, when appropriate, in common units of measure. Detailed work schedule activities shall include the following: • Construction activities; • Any limitations of operation specified in 00180.40; • The time needed for completion of the utility relocation work; • Implementation of TCP for each stage and phase; • Submittal and approval of Material samples, mix designs, and shop drawings; • Agency timeframes to process and return Contractor submitted plans, working drawings, equipment lists and other submittals; • Procurement of critical Materials; • Fabrication, installation, and testing of special Material and Equipment; • Duration of Work, including completion times of all stages and their sub-phases; and • Specified cure times for all concrete elements. The activities shall be separately identifiable by coding or use of sub-networks or both. The duration of each activity shall be verifiable and consistent with the description in the Project narrative required in(3) below. Detailed sub-networks shall include all necessary activities and logic connectors to describe the Work and all restrictions on it. In the restraints, include those activities from any Project Work schedule that initiated the sub-network as well as those restrained by it. The time scale used on the Contractor's detailed time-scaled critical path method(CPM)network Project Work schedule shall be appropriate for the duration of the activities and the Project duration. The time scale shall be in normal workdays, defined as every day except Saturday, Sunday and legal holidays, with calendar dates identified no less than the first and midpoint of each calendar month. The smallest unit shown shall be one Day. The network shall show the length of the activity or part scaled to accurately represent the number of normal workdays scheduled. Distinct symbols or graphics shall be used to show multiple shift, holiday, or weekend work. The schedule network drawing(s) shall include a title block showing the Contract name and number, Contractor's name,date of original schedule,and all update dates;and a legend containing the symbols used, their definitions, and the time scale, shown graphically. To ensure readability the drawings shall be on a reasonable size of paper up to a maximum of 36 inch x 36 inch, using multiple sheets when needed. 106 General Conditions Revised 01/27/2026 00180 Conformed to Bid Documents The Contractor shall include a tabulation of each activity in the computer mathematical analysis of the network diagram. The following information represents the minimum required for each activity: • Event(node)number(s)for each activity; • Maintain event(node)numbers throughout the Project; • Activity description; • Original duration of activities(in normal workdays); • Estimated remaining duration of activities (in normal workdays); • Earliest start date and actual start date(by calendar date); • Earliest finish date and actual finish date (by calendar date); • Latest start date(by calendar date); • Latest finish date (by calendar date); and • Slack or float time(in workdays). Computer print-outs shall consist of at least a node sort and an "early start/total-float"sort. Within 14 Calendar Days after submission of the detailed time-scaled critical path method(CPM)network Project Work schedule, the Engineer and the Contractor shall meet to review the detailed time-scaled critical path method (CPM) network Project Work schedule as submitted. Within seven Calendar Days of the meeting, the Contractor shall resubmit to the Engineer one digital and four paper copies of the detailed time-scaled critical path method (CPM) network Project Work schedule, including required revisions. This first accepted detailed time-scaled critical path method (CPM)network Project Work schedule,also called the accepted Project Work schedule, shall represent all Work, as well as the planned sequence and time for the Work. Review and acceptance of any Project Work schedules and Project narratives by the Engineer shall not relieve the Contractor of responsibility for timely and efficient execution of the Contract. (3) Project Narrative- In addition to the above requirements, and within 30 Calendar Days after First Notification, the Contractor shall provide to the Engineer a final written Project narrative that discusses the planning, coordinating, scheduling and resourcing of the Work. The Project narrative shall include the following written description: • Plans for staging the project. • All critical activities. • All near critical activities defined as those with less than 30 Days of float. • All subcontractor activities that are critical, near critical, and those that are greater than two weeks in duration. • Labor resourcing, by stage and phase, to include the number of crews, average crew size and planned night/weekend shifts including that of subcontractors. • Equipment allocation, by stage and phase to include mobilization, demobilization and planned activities including that of subcontractors. • Notifications required under the Contract during each stage and phase which may include but is not limited to road closures, lanes closures, night work, cold plane pavement removal, and pile driving. • Provide discussion on addressing reasonably predictable weather conditions and their impact on all weather sensitive activities. Also,provide discussion on other weather limitations that may affect the project schedule. 107 General Conditions Revised 01/27/2026 00180 Conformed to Bid Documents • Submittal and approval of material samples, mix designs, and shop drawings. • Procurement of critical materials. • Plans for dealing with "unique"construction items. • Coordination of utilities and any immediate concerns for impacts/delays. • Constructability issues. • Cost Reduction Proposals and/or immediate requests for changes to the specifications. • Concerns/issues that need to be addressed within the first 90 Days following First Notification. The accepted Project narrative shall represent all critical and near critical Work, as well as the planned sequence and time for the Work. (4) Review and Reporting-The Project Work schedule may require revision as the Work progresses. Therefore,the Contractor shall monitor and when necessary revise the Project Work schedule as follows: a. Review with the Engineer-The Contractor shall perform ongoing review of the accepted Project Work schedule and progress of the Work with the Engineer. If the Engineer or the Contractor determines that the accepted Project Work schedule no longer represents the Contractor's own plans or expected time for the Work,a meeting shall be held between the Engineer and the Contractor. At this meeting, the Contractor and the Engineer shall review Project events and any changes for their effect on the accepted Project Work schedule. After any necessary action has been agreed upon,the Contractor shall make required changes to the accepted Project Work schedule and associated Project narrative. Upon acceptance by the Engineer,this will become the new accepted Project Work schedule and associated Project narrative. The Contractor shall collect information on all activities worked on or scheduled to be worked on during the previous report period, including shop drawings, Material procurement, and Contract Change Orders that have been issued. Information shall include actual start and completion dates on activities started or completed,or if still in progress,the remaining time duration. The Contractor shall develop detailed sub-networks to incorporate changes, Additional Work, and Extra Work into the Project Work schedule. Detailed sub-networks shall include all necessary activities and logic connectors to describe the Work and all restrictions on it. The restraints shall include those activities from the Project Work schedule that initiated the sub-network as well as those restrained by it. The procedure for acceptance of the revised or updated Project Work schedule as the new accepted Project Work schedule will be as provided above. The Contractor shall evaluate this information each month and compare it with the accepted Project Work schedule. The Contractor shall make an updated bar chart schedule to incorporate the effect changes may have on the Project completion time(s). For any activity that has started,the Contractor shall add a symbol to show the actual date the activity started and the number of normal workdays remaining until completion. For activities that are finished,a symbol shall be added to show the actual date. The Contractor shall submit, digitally and in paper, copies of the updated bar chart to the Engineer within seven Days after the progress meeting, along with a progress report as required by "b."below. b. Progress Report-Each month the Contractor shall submit a progress report and an update of the Project Work schedule to the Engineer. The report and updated schedule shall be submitted both digitally and in paper copy and shall include the following: • A sufficient description, in narrative form, to describe the past progress, anticipated activities, and stage Work; • A description of any current and expected changes or delaying factors and their effect on the construction schedule; 108 General Conditions Revised 01/27/2026 00180 Conformed to Bid Documents • Proposed corrective actions; • Proposals to keep the Project on schedule in the event of a delay; and • Any changes to the logic as compared to the accepted Project Work schedule. (d) Substitution of Schedules-When a Type "A" schedule is required, a Type "B" or Type "C" schedule may be substituted for the Type"A"schedule. When a Type"B"schedule is required, a Type"C"schedule may be substituted for the Type"B"schedule. (e) Specified Contract Time Not Superseded by Schedule Revisions-The completion dates in any Project Work schedule and any revised or updated Project Work schedules shall be within the Contract Time(s) specified for the Project, or within adjusted Contract Times approved according to 00180.80(c). Acceptance of any Project Work schedule or any revised or updated Project Work schedules shall not constitute approval of any completion dates that exceed such Contract Time(s). If the Contractor believes that additional Contract Time is due, the Contractor shall submit, with a revised Project Work schedule, a request for adjustment of Contract Time according to 00180.80(c). A request for an adjustment of Contract Time will be evaluated using the most recently accepted Project Work schedule. (f) Float Time-Float time shown on the Project Work schedule, including any time between a Contractor's scheduled completion date and the specified Contract Time(s), does not exist for the exclusive use of either party to the Contract and belongs to the Project. (g) Schedules Do Not Constitute Notice-Submittal of a Project Work schedule, with supporting Project narrative, does not constitute or substitute for any notice the Contractor is required under the terms of the Contract to give the Agency. (h) Failure to Provide Schedule-The Project Work schedule is essential to the Agency. The Contractor's failure to provide the schedule,schedule information,progress reports,Project narratives,or schedule updates when required will be cause to suspend the Work, or to withhold Contract payments as necessary to protect the Agency, until the Contractor provides the required information to the Engineer. 00180.42 Preconstruction Conference - Unless otherwise approved in writing by the Engineer,before any Work is performed and within seven (7) Calendar Days of the Notice to Proceed, the Contractor shall meet with the Engineer for a preconstruction conference at a time mutually agreed upon. See Special Provision 00180.43 Commencement and Performance of Work- From the time of commencement of the Work to the time of Final Acceptance the Contractor shall: • Provide adequate Materials, Equipment, labor,and supervision to perform and complete the Work within the Contract Time or the adjusted Contract Time; • Perform the Work as vigorously and as continuously as conditions permit, and according to a Project Work schedule that ensures completion within the Contract Time or the adjusted Contract Time; • Not voluntarily suspend or slow down operations without prior written approval from the Engineer, and if approved submit an updated Project Work schedule according to 00180.41 that ensures completion within the Contract Time or the adjusted Contract Time; and • Not resume suspended Work without the Engineer's written authorization. 00180.44 Project Meetings—The Contractor shall participate in conferences and meetings for the purposes of addressing issues related to the Work, reviewing and coordinating progress of the Work and other matters of common interest to the Contractor, Engineer and Agency. See Special Provisions (a) Meeting Participants — Representative of entities participating in meetings shall be qualified and authorized to act on behalf of entity each represents. 109 General Conditions Revised 01/27/2026 00180 Conformed to Bid Documents (b) Meet in Agency's meeting room facility,or in a location otherwise agreed to by Engineer and Contractor. (c) Engineer will distribute to each anticipated participant written notice and agenda of each meeting at least four days before meeting. (d) Require attendance of Contractor's superintendent and project manager, and Subcontractors who are or are proximate to be actively involved in the Work, or who are necessary to agenda. (e) Engineer will invite agencies, utility companies or others when the Work affects their interests, and others necessary to agenda. (f) Engineer will record minutes of meetings and distribute copies of minutes within seven days of meeting to participants and interested parties. Contractor shall advise Engineer within two days of receipt of meeting minutes if Contractor does not agree with content of minutes. (g) Progress Meetings (1) Purpose of Progress Meetings:To expedite Work of Subcontractors or other organizations that are not meeting scheduled progress, resolve conflicts, and coordinate and expedite execution of the Work. (2) Attend regularly scheduled bi-weekly progress meetings conducted by Engineer. (3) Review progress of the Work, Progress Scheduled, three-week look-ahead schedule, narrative report, Application for Payment, record documents, and additional items of current interest that are pertinent to execution of the Work. (4) Verify: • Actual start and finish dates of completed activities since last progress meeting. • Durations and progress of activities not completed. • Reason,time,and cost data for Change Order Work that will be incorporated into Progress Schedule and Application for Payment. • Percentage completion of items on Application for Payment • Reasons for required revisions to Progress Schedule and their effect on Contract Time and Contract Amount. (5) Review status of Requests for Clarification/Information and Submittals review. (6) Discuss Project safety and security. (7) Discuss traffic control. (8) Discuss potential problems which may impede scheduled progress and corrective measures. (h) Coordination Meetings (1) Purpose of Coordination Meetings: To coordinate the Work of this Contract with the Work of the Agency and with Work of other Contractors. (i) Pre-Event Meetings 110 General Conditions Revised 01/27/2026 00180 Conformed to Bid Documents (1) Prior to start of critical activities, the Contractor shall schedule a meeting with Engineer to review applicable specifications and drawings,coordination of inspection requirements and other key activities. (j) Pre-Survey Conference (1) The Contractor, applicable Subcontractors, Contractor's surveyor, and Agency's surveyor shall meet with the Engineer two weeks prior to beginning survey work. The purpose of the meeting is to discuss methods and practices of accomplishing the survey work. (k) Other Meetings (1) The Contractor shall prepare for and attend other meetings as identified elsewhere in the Contract Documents. 00180.50 Contract Time to Complete Work: (a) General-The time allowed to complete the Work or Pay Item is stipulated in the Solicitation Documents and Special Provisions, and will be known as the"Contract Time". (see 00110.20) (b) Kinds of Contract Time-The Contract Time will be expressed in one or more of the following ways: (1) Fixed Date Calculation-The calendar date on which the Work or Pay Item shall be completed; or (2) Calendar Day Calculation-The number of Calendar Days from a specified beginning point in which the Work or Pay Item shall be completed. (3) Work Day Calculation —The number of Work Days from a specified beginning point in which the Work or Pay item shall be completed. (c) Beginning of Contract Time-When the Contract Time is stated in Calendar Days,counting of Contract Calendar Days will begin with the first Calendar Day following the date of the Notice to Proceed. When the Contract Time is stated in Work Days, counting of Contract Work Days will begin with the first Work day following the date of the Notice to Proceed. (d) Recording Contract Time-All Contract Time will be recorded and charged to the nearest one-half Day. Contract Times may be extended because of delays in the completion of the Work due to abnormal weather conditions provided that the Contractor shall,within 10 days of the beginning of such delay, notify Engineer in writing of the cause of the delay and request an extension of time. Such requests shall be accompanied with supporting documentation referenced to the NOAA INDEX weather in the Project vicinity. Engineer shall extend the Contract Times for completing the Work when, in Engineer's judgment, the findings of facts and extent of delay justify such an extension. Contractor shall not be entitled to any additional compensation of any kind arising out of or relating to abnormal weather conditions. (e) Exclusions from Contract Time- Regardless of the way Contract Time is expressed in the Contract, certain Calendar Days will not be charged against Contract Time. These exclusions will be allowed when the Contractor is prevented from performing Work due to one of the following reasons, resulting in delay: • Acts of God or Nature; • Court orders enjoining prosecution of the Work; • Strikes,labor disputes or freight embargoes that,despite the Contractor's reasonable efforts to avoid them, cause a shutdown of the entire Project or one or more major operations. "Strike" and "labor dispute" may include union action against the Contractor, a Subcontractor, a Materials supplier, or the Agency; or 111 General Conditions Revised 01/27/2026 00180 Conformed to Bid Documents • Suspension of the Work by written order of the Engineer for reasons other than the Contractor's failure or neglect. (f) Time Calculation Protest- In the event the Contractor disputes the accuracy of the statement of Contract Time charges, it shall immediately contact the Engineer and attempt to resolve the dispute. If the dispute cannot be resolved informally, the Contractor shall submit a formal written protest to the Engineer within seven Calendar Days of the date the Engineer mailed or delivered the statement. Failure to submit a formal written protest within the seven Calendar Day period constitutes the Contractor's approval of the time charges, or adjusted time charges, itemized in the statement. (g) End of Contract Time-When the Engineer determines that the On-Site Work has been completed, except for the items listed below, the Engineer will issue a Second Notification. The Second Notification will list: • The date the time charges stopped; • Final trimming and cleanup tasks(see 00140.90); • Equipment to be removed from the Project Site; • Minor corrective work(punch list)to be completed; and • Submittals, including without limitation all required certifications, bills, forms, warranties, certificate of insurance coverage(00170.70(b)), and other documents, required to be provided to the Engineer before Third Notification will issue. The Contractor shall complete all tasks listed in the Second Notification in an expeditious manner within the time frame specified for Final Completion. 00180.60 Notice of Delay-The Contractor shall notify the Engineer of any delay that will likely prevent completion of the Work or a Pay Item by the date specified in the Project Work schedule. The notice shall be in writing and shall be submitted within seven (7)Calendar Days of when the Contractor knew or should have known of the delay. The notice shall include,to the extent available, the following: • The reasons or causes for the delay; • The estimated duration of the delay and the estimated resulting cumulative delay in Contract completion; • Except for 00180.50(e) and 00180.65 delays, whether or not the Contractor expects to request an adjustment of Contract Time due to the delay; • Whether or not the Contractor expects to accelerate due to the delay; and • Whether or not the Contractor expects to request additional compensation due to the delay. Except for 00180.50(e) and 00180.65 delays, failure to include this information will constitute waiver of the Contractor's right to later make such a request. 00180.65 Right-of-Way and Access Delays- Right-of-Way and access delays will be taken into consideration in adjusting Contract Time, and in approving additional compensation if the performance of the Work is delayed because of the Agency's failure to make available to the Contractor: • Necessary Rights-of-Way; • Agency-owned or Agency-controlled Materials sources that are offered in the Contract for the Contractor's use;or • Access to, or rights of occupancy of, buildings and other properties the Contractor is required to enter or to disturb according to Contract requirements. 112 General Conditions Revised 01/27/2026 00180 Conformed to Bid Documents If the duration and time period of an anticipated delay is stated in the Special Provisions, only the delay occurring beyond that duration and time period will be considered for adjusting Contract Time or providing additional compensation. 00180.70 Suspension of Work: (a) General -The Engineer has authority to suspend the Work, or part of the Work,for any of the following causes: • Failure of the Contractor to correct unsafe conditions; • Failure of the Contractor to carry out any provision of the Contract; • Failure of the Contractor to carry out orders issued by the Engineer, the Agency, or any regulatory authority; • Existence of conditions unsuitable to proper or safe performance of the Work;or • Any reason considered by the Agency to be in the public interest. When Work has been suspended for any reason,the Contractor shall not resume Work without the Engineer's written authorization. (b) Contractor's Responsibilities during and after Suspension -During periods of suspension of the Work, the Contractor shall continue to be responsible for protecting and repairing the Work according to 00170.80, and for ensuring that a single designated representative responsible for the Project remains available according to 00150.40.(b). When Work is resumed after suspension, unless otherwise specified in the Contract, the Contractor shall perform the following at no additional compensation: • Replace or repair any Work, Materials, and Equipment to be incorporated into the Work that was lost or damaged because of the temporary use of the Project Site by the public;and • Remove Materials, Equipment,and temporary construction necessitated by temporary maintenance during the suspension,as directed by the Engineer. (c) Compensation and Allowances for Suspension -Compensation and allowance of additional Contract Time due to suspension of any portion of the Work will be authorized only for Agency-initiated suspensions for reasons other than the Contractor's failure or neglect. (refer to 00180.50(e), 00180.65,and 00195.40) 00180.80 Adjustment of Contract Time: (a) General -Contract Time established for the Work will be subject to adjustment, either by increase or decrease, for causes beyond the control of the Contractor, according to the terms of this Subsection. After adjustment, the Contract Time will become, and be designated as, the"Adjusted Contract Time". Except as provided in 00180.65 and 00195.40,an adjustment of Contract Time shall be the Contractor's only remedy for any delay arising from causes beyond the control of the Contractor. (b) Contractor's Request Not Required-The Engineer may increase or decrease the Contract Time or the Adjusted Contract Time if Change Orders or Extra Work orders issued actually increase or decrease the amount of time required to perform the Work. The Engineer may also increase Contract Time in the event of Right-of-Way and Access delays (see 00180.65), and those delays due to causes beyond the Contractor's control specified in 00180.50(e). The Engineer will promptly inform the Contractor of adjustments made to Contract Time according to this Subsection, and will include the reasons for adjustment. If the Agency anticipates delay during performance of the Contract, and specifies its expected duration and time period in the Special Provisions, the Engineer will only consider additional delay beyond the stipulated duration and time period in determining whether to adjust Contract Time. 113 General Conditions Revised 01/27/2026 00180 Conformed to Bid Documents (c) Contractor's Request Required- In the event the Contractor believes that additional Contract Time is due, the Contractor shall submit to the Engineer a timely request for adjustment of Contract Time. The Engineer will not consider untimely requests. The Agency regards as timely only those requests for adjustment of Contract Time that: • Accompany a proposed revised Project Work schedule submitted according to 00180.41, for comparison with the last revision of the Project Work schedule; or • Are not otherwise deemed waived and are submitted within 15 Days after the date of Second Notification, if Second Notification has been issued. The Engineer will not grant an adjustment of Contract Time for events that occurred prior to the date of the last revision of the Project Work schedule. The Engineer will not authorize, nor the Agency pay, acceleration costs incurred by the Contractor prior to its submittal of a request for adjustment of Contract Time to which the acceleration costs relate. The Contractor's request for adjustment of Contract Time shall be submitted to the Engineer on a form provided by, or in a format acceptable to,the Engineer,and shall include a copy of the written notice required under 00180.60. The request shall include without limitation: • Consent of the Contractor's Surety if the request totals more than 30 Calendar Days of additional Contract Time; • Sufficient detail for the Engineer to evaluate the asserted justification for the amount of additional Contract Time requested; • The cause of each delay for which additional Contract Time is requested, together with supporting analysis and data; • Reference to the Contract provision allowing Contract Time adjustment for each cause of delay; • The actual or expected duration of delay resulting from each cause of delay,expressed in Calendar Days; and • A schedule analysis based on the current approved Project Work schedule for each cause of delay, indicating which activities are involved and their impact on Contract completion. (d) Basis for Adjustment of Contract Time- In the adjustment of Contract Time,the Engineer will consider causes that include, but are not limited to: • Failure of the Agency to submit the Contract and bond forms to the Contractor for execution within the time stated in 00130.50, or to submit the Notice to Proceed within the time stated in 00130.90; • Errors, changes, or omissions in the Supplemental Drawings, quantities, or Specifications; • Performance of Extra Work; • Failure of the Agency or Entities acting for the Agency to act promptly in carrying out Contract duties and obligations; • Acts or omissions of the Agency or Entities acting for the Agency that result in unreasonable delay referenced in 00195.40; • Causes cited in 00180.50(e); and • Right-of-way and access delays referenced in 00180.65. The Engineer will not consider requests for adjustment of Contract Time based on any of the following: • Contentions that insufficient Contract Time was originally specified in the Contract; • Delays that do not affect the specified or Adjusted Contract Time; 114 General Conditions Revised 01/27/2026 00180 Conformed to Bid Documents • Delays that affect the Contractor's planned early completion, but that do not affect the specified or adjusted Contract Time; • Shortage or inadequacy of Materials, Equipment or labor; • Work stoppage required by the Engineer to determine the extent of Work defects • Time for the Contractor to correct the Work defects from date of notification of the defects until the correction work is completed and has been approved by the Engineer. • Late delivery of Materials and Equipment to be incorporated into the Work, except under those conditions referenced in 00180.50(e); • Different area of Material source in 00160.40(a); • Substitution of Equipment in 00180.31(c); • Reasonably predictable weather conditions; or • Other matters within the Contractor's control or Contract responsibility. (e) Consideration and Response by Agency-The Engineer will only consider a Contractor's request for Contract Time adjustment submitted according to the requirements of 00180.80(c). The Engineer may elect not to consider claimed delays that do not affect the specified or adjusted Contract Time required to complete the Work. The Engineer may adjust Contract Time for causes not specifically identified by the Contractor in its request. The Engineer will review a properly submitted request for Contract Time adjustment,and within a reasonable time will advise the Contractor of the Engineer's findings. If the Contractor disagrees with the Engineer's findings,the Contractor may request review according to the procedure specified in 00199. 00180.85 Failure to Complete on Time; Liquidated Damages: (a) Time is of the Essence-Time is of the essence in the Contractor's performance of the Contract. Delays in the Contractor's performance of the Work may inconvenience the traveling public, interfere with business and commerce, and increase cost to the Agency. It is essential and in the public interest that the Contractor prosecute the Work vigorously to Contract completion. The Agency does not waive any rights under the Contract by permitting the Contractor to continue to perform the Contract, or any part of it,after the Contract Time or adjusted Contract Time has expired. (b) Liquidated Damages-The Agency will sustain damage if the Work is not completed within the specified Contract Time. However,in certain Agency projects it may be unduly burdensome and difficult to demonstrate the exact dollar value of such damages. The Agency will identify such projects in the Special Provisions related to them. In these projects, the Contractor agrees to pay to the Agency, not as a penalty but as liquidated damages, the amount specified in the Special Provisions for each Calendar Day that expires after the Substantial Completion date, and after Substantial Completion, if Contractor neglects, refuses or fails to complete the remaining work within the Contract Time or adjusted Contract Time Payment by the Contractor of liquidated damages does not release the Contractor from its obligation to fully and timely perform the Contract according to its terms. Nor does acceptance of liquidated damages by the Agency constitute a waiver of the Agency's right to collect any additional damages it may sustain by reason of the Contractor's failure to fully perform the Contract according to its terms. The liquidated damages shall constitute payment in full only of damages incurred by the Agency due to the Contractor's failure to complete the Work on time. If the Contract is terminated according to 00180.90(a),and if the Work has not been completed by other means on or before the expiration of Contract Time or adjusted Contract Time, liquidated damages will be assessed against the Contractor for the duration of time reasonably required to complete the Work. 115 General Conditions Revised 01/27/2026 00180 Conformed to Bid Documents 00180.87 Failure to Comply with COBID Good Faith Requirement Plan The Contractor's failure to comply with the COBID Good Faith Requirement plan may result in a breach of contract, possible disqualification of the Contractor's ability to bid on or receive future contracts., and assessment of penalty. In the event of a breach of contract in Contractor's COBID requirements, in addition to any other remedies the Owner may have,the Owner may take any of the following actions: (a). Owner may withhold all or part of any progress payment(s) until the Contractor has remedies the breach of contract. In the event that progress payments are withheld, the Contractor shall not be entitled to interest on such payments. If a subcontractor has not complied with any COBID requirements imposed by the Contractor upon the subcontractor as part of the Contractor's COBID Good Faith Requirement,the Owner may elect to withhold only such subcontractor's portion of the progress payment. (b). The Owner has an expectation that if a Contractor is awarded a contract, and identifies that it intends to contract with COBID firms,then Contractor shall actually use such COBID firms. i. Contractor acknowledges and agrees that it would be difficult,if not impossible,to assess the actual damage incurred by the Owner for Contractor's failure to comply with the COBID Good Faith Requirements. In such event,the Contractor agrees to pay the sum of$2,000 for each violation. ii. If the Contractor fails to utilizes any COBID firm as identified on the Utilization Plan, on in its Contracting Plan for use of COBID-certified firms,the Contractor shall pay$2,000 for each violation. iii. Exceptions to this requirement are for approved change orders, reductions in scope of work as requested by Owner, failure of COIBID firms to complete work or having breached the subcontract, and substitution requests approved by the Owner. 00180.90 Termination of Contract and Substituted Performance: (a) Termination for Default-Termination of the Contract for default may result if the Contractor: • Fails to comply with the requirements for records; • Violates any material provision of the Contract; • Disregards applicable laws and regulations or the Engineer's instructions; • Refuses or fails to supply enough Materials, Equipment or skilled workers for prosecution of the Work in compliance with the Contract; • Fails to make prompt payment to Subcontractors; • Makes an unauthorized general assignment for the benefit of the Contractor's creditors; • Has a receiver appointed because of the Contractor's insolvency; • Is adjudged bankrupt and the court consents to the Contract termination; or • Otherwise fails or refuses to faithfully perform the Contract according to its terms and conditions. If the Contract is terminated by the Agency, upon demand the Contractor and, if applicable, the Contractor's Surety shall provide the Engineer with immediate and peaceful possession of the Project Site, and of all Materials and Equipment to be incorporated into the Work, whether located on and off the Project Site, for which the Contractor received progress payments under 00195.50. If the Contract is terminated for default, neither the Contractor nor its Surety shall be: • Relieved of liability for damages or losses suffered by the Agency because of the Contractor's breach of Contract; or • Entitled to receive any further progress payments until the Work is completed. However, progress payments for completed Work that remain due and owing at the time of Contract termination may be made according to the terms of 00195.50,except that the Engineer will be entitled to withhold sufficient funds to cover costs incurred by the Agency as a result of the termination. Final payment to the Contractor will be made according to the provisions of Subsection 00195.70. 116 General Conditions Revised 01/27/2026 00180 Conformed to Bid Documents If a termination under this provision is determined by a court of competent jurisdiction to be unjustified, the termination shall be deemed a termination for public convenience. (b) Substituted Performance-According to the Agency's procedures, and upon the Engineer's recommendation that sufficient cause exists, the Agency, without prejudice to any of its other rights or remedies and after giving the Contractor and the Contractor's Surety at least 10 Calendar Days'written notice, may: • Terminate the Contract; • Substitute the Contractor with another Entity to complete the Contract; • Take possession of the Project Site; • Take possession of Materials on the Project Site; • Take possession of Materials not on the Project Site, for which the Contractor received progress payments under 00195.50; • Take possession of Equipment on the Project Site that is to be incorporated into the Work; • Take possession of Equipment not on the Project Site that is to be incorporated into the Work,and for which the Contractor received progress payments under 00195.50; and • Finish the Work by whatever method the Agency deems expedient. If,within the 10 Calendar Day notice period provided above,the Contractor and/or its Surety corrects the basis for declaration of default to the satisfaction of the Engineer, or if the Contractor's Surety submits a proposal for correction that is acceptable to the Engineer,the Contract will not be terminated. (c) Termination for Public Convenience-The Engineer may terminate the Contract for convenience in whole or in part whenever the Engineer determines that termination of the Contract is in the best interest of the public. and for, but not limited to,the following reasons: • If work under the Contract is suspended by an order of a public agency for any reason considered to be in the public interest other than by a labor dispute or by reason of any third party judicial proceeding relating to the Work other than a suit or action filed in regard to a labor dispute; or • If the circumstances or conditions are such that it is impracticable within a reasonable time to proceed with a substantial portion of the Contract;or; • If Agency funding from federal, state, local, or other sources is not obtained and continued at levels sufficient to allow for the purchase of the indicated quantity of services. This Contract may be modified to accommodate a reduction in funds; or • If Federal or State regulations or guidelines are modified, changed,or interpreted in such a way that the services are no longer allowable or appropriate for purchase under this Contract, The Engineer will provide the Contractor and the Contractor's Surety seven Calendar Days'written notice of termination for public convenience. After such notice,the Contractor and,if applicable,the Contractor's Surety shall provide the Agency with immediate and peaceful possession of the Project Site, and of Materials and Equipment to be incorporated into the Work, whether located on and off the Project Site, for which the Contractor received progress payments under 00195.50. Termination under any provision of this paragraph shall not affect any right,obligation,or liability of Contractor or Agency that accrued prior to such termination. If the Contract is terminated for public convenience, neither the Contractor nor its Surety shall be relieved of liability for damages or losses suffered by the Agency as a result of defective, unacceptable or unauthorized Work completed or performed. 117 General Conditions Revised 01/27/2026 00180 Conformed to Bid Documents Compensation for Work terminated by the Engineer under this provision will be determined according to the provisions of 00195.70(b). 118 General Conditions Revised 01/27/2026 00190 Conformed to Bid Documents Section 00190-Measurement of Pay Quantities 00190.00 Scope-The Engineer will measure pay quantities for accepted Work according to the United States standard measure unless otherwise provided in the Contract. Unless otherwise specified in the Contract, the Engineer will round off all quantity computations using the following convention: • The final significant digit will not be changed when the succeeding digit is less than 5. • The final significant digit will be increased by one when the succeeding digit is 5 or greater. The measurement provisions contained in the Specifications for each Pay Item will supplement or modify the above convention by: • Imposing measurement limitations • Describing measurement or computation procedures • Giving conversion factors or adjustment conditions • Providing for determination of reasonably accurate and representative Pay Item quantities Measurements required or allowed to be made by the Contractor will be subject to the Engineer's verification. The Engineer's decision about measurement is final. 00190.10 Measurement Guidelines-Measurement of quantities will be made on the following bases,unless otherwise specified in the Contract: (a) Unit Basis- Unit will be each, unless otherwise specified in the Contract and will be determined by actual count of units in place. (b) Length Basis- Length will be feet or mile, unless otherwise specified in the Contract and will be determined by measuring the length at least to the nearest 0.1 foot or at least to the nearest 0.1 mile, as applicable,unless otherwise specified in the Contract. Measurements will be limited to the dimensions shown or specified, or as directed by the Engineer. (c) Area Basis-Area will be square foot, square yard, or acre, unless otherwise specified in the Contract and will be determined by measuring the width and the length (or height)at least to the nearest 0.1 foot and computed at least to the nearest 0.1 square foot, nearest 0.1 square yard, or nearest 0.1 acre, as applicable, unless otherwise specified in the Contract. (d) Weight Basis-Weight will be pound or ton, unless otherwise specified in the Contract and will be determined as follows: (1) Pound- Pound weight will be determined by the net weight identified on the manufacturer's packaged labels, subject to periodic check weighing. Weight by pound will be measured at least to the nearest 1.0 pound unless otherwise specified in the Contract. Provide a certificate with each shipment together with a certified copy of the weight of each delivery. If the check weight is less than the manufacturer weight by more than 0.4%, the discrepancy will be resolved by the Engineer. (2) Ton -Ton weight will be determined on Contractor-provided scales as required under 00190.20 unless otherwise allowed by the Specifications. Weight by ton will be measured at least to the nearest 0.01 ton unless otherwise specified in the Contract. If bituminous materials, Portland cement, lime,and similar bulk Materials are shipped by truck or rail,the supplier's shipping invoice with net scale weights,or volumes converted to weights,may be used for Pay Item quantity determination in place of weights determined on the Contractor-provided vehicle scales. 119 General Conditions Revised 01/27/2026 00190 Conformed to Bid Documents Shipping invoice weights of the supplier's truck or transport shall be subject to periodic check weighing on the Contractor's vehicle scales, or other scales designated, according to 00190.20. If the check weight is less than the supplier weight by more than 0.4%, the discrepancy will be resolved by the Engineer. No payment will be made: • For quantities in excess of the supplier weight • When Materials have been lost,wasted, or otherwise not incorporated into the Work • For additional hauling costs resulting from the check weighing (e) Volume Basis-Volume will be cubic yard truck measure or in-place measure, gallons, foot board measure(FBM),or thousand foot board measure(MFBM), unless otherwise specified in the Contract and will be measured at least to the nearest 0.1 cubic yard,nearest 1.0 gallon,nearest 0.1 FBM,or nearest 0.1 MFBM, as applicable, unless otherwise specified in the Contract. Truck measure will be the measured and calculated maximum"water level"capacity of the vehicle. Quantities will be determined at the point of delivery, with no allowance for settlement of Material during transit. When required to facilitate measurement,the vehicle load shall be leveled at the point of delivery. Payment will not be made for Material in excess of the maximum "water level" capacity. Deductions will be made for loads below the maximum "water level"capacity. When bituminous materials are measured by volume,the volume will be measured at 60°F or will be corrected to the volume at 60°F using the correction factors found in the MFTP(ODOT TM 321). (f) Time Basis-Time will be hour, Day, or year, unless otherwise specified in the Contract, and will be measured to at least the nearest 0.5 hour,nearest 1.0 Day,or nearest 1.0 year,as applicable,unless otherwise specified in the Contract. (g) Standard Manufactured Items- If standard manufactured items, such as fence, wire, plates, rolled shapes, pipe, conduit and other similar items are specified in the Contract by properties such as gauge, unit weight, or section dimensions, the manufacturing tolerances established by the industry involved will be accepted unless more stringent tolerances are cited in the Contract. (h) Lump Sum Basis-Lump sum,when used, means the Work described shall be completed and accepted without measurement unless changes are ordered in writing by the Engineer. 00190.20 Contractor to Provide Vehicle Weigh Scales: (a) General- If the Specifications require measurement by weighing on vehicle weigh scales,the Contractor shall provide vehicle weigh scales and shall transport Materials to the scales. Subject to the Engineer's approval,weights may be determined by plant or hopper scales according to 00190.30. Contractor-provided scales shall be furnished, installed and maintained by the Contractor or its supplier, or, subject to the Engineer's approval, may be commercial scales located in the vicinity of the Project. Unless otherwise provided in the Contract, Pay Items to be measured by weight shall include all Contractor costs for providing, maintaining, inspecting, and testing scales; for furnishing appropriate weigh tickets; for self-printing scales; and for transporting Materials to the scales or to check weighing. (b) Requirements-The scales shall conform to ORS 618,or the laws of the state in which they are located, and NIST Handbook 44, and shall be: 120 General Conditions Revised 01/27/2026 00190 Conformed to Bid Documents • Licensed by the Oregon Department of Agriculture, or by the analogous regulatory body for scales located outside the State; • Technically suitable for weighing the Materials; • Properly installed and maintained; and • Accurate to the required tolerances. The weight of any Materials weighed by anyone other than the Engineer will be subject to check weighing as the Engineer directs. (c) Approaches-Vehicle scale approaches shall be: • At each end of the scale platform; • Straight and in line with the platform; and • Long enough to accommodate combination vehicles longer than the scale platform so that they are level and allow release of brakes before weighing. (d) Inspections-Contractor shall have all scales certified,that is inspected and their accuracy tested, by the Oregon Department of Agriculture, an analogous regulatory body for scales located outside the State, or a scale service company as follows: • Before use if installed at a new site; • 60 Calendar Days after initial inspection; • As otherwise required by the Oregon Department of Agriculture, or an analogous regulatory body for scales located outside the State; and • Every six months thereafter; and • When the Engineer directs additional inspections. No Materials weighed on scales without current certifications according to this Subsection will be accepted. The Contractor shall provide a copy of all required certifications to the Engineer. Testing by a scale service company within the State of Oregon shall comply with ORS Chapter 618. If additional inspections directed by the Engineer confirm that the scale accuracy is within the required tolerances, the Agency will pay the cost for inspecting and testing the scales. If the scale accuracy is not within these tolerances,the Contractor shall pay the cost for inspecting and testing the scales. (e) Inspection Results- If an inspection indicates the scales have been under-weighing(indicating less than the true weight), the Agency will make no additional payment to the Contractor for Materials previously weighed. If an inspection indicates the scales have been over-weighing (indicating more than the true weight), the weights will be reduced for Materials received after the time the Engineer determines the overweighing began or, if that is not possible, after the last acceptable certification of the scales. The reduction will be the amount of error in excess of the 0.2%maintenance tolerance allowed in the Contract. (f) Contractor-Provided Weigh Technician-The Contractor shall provide a technician to operate Contractor-provided vehicle weigh scales. The Agency may observe procedures and require check weighing according to the following: (1) Scale with Automatic Printer- If the scales have an automatic weigh memo printer that does not require manual entry of gross weight information,the Agency may periodically have a representative at the scales to observe the weighing procedures. In addition, the Engineer may periodically check the 121 General Conditions Revised 01/27/2026 00190 Conformed to Bid Documents weight for a load of Materials by directing the haul vehicle to reweigh on a different scale that has been inspected and certified according to 00190.20(b)and 00190.20(d). If a different scale is not available within a 30 mile round trip from the regular haul route,the Agency will allow check weighing on an approved alternate basis. Check weights within 0.4% of the Contractor- provided weight are acceptable. The Engineer will resolve discrepancies found by check weighing. Agency employee costs will be paid by the Agency. The Contractor shall pay all other costs resulting from the check weighings, including, without limitation,the use of other scales. If more than 50 tons per Day of all types of Materials are received from a scale, the Contractor shall make random check weighings at least every tenth Day on which more than 50 tons is received or at each interval that 10,000 tons has been weighed,whichever occurs first,or as directed by the Engineer. The Contractor shall make at least one check weighing on projects where more than 2,000 tons of all types of Materials are received from a scale. The Contractor shall provide the Engineer with the results of the check weighing. (2) Scale Without Automatic Printer- If the scales require manual entry of gross weight information, the Agency may periodically have a representative weigh witness at the scales to observe the weighing procedures. The Contractor shall inform the Engineer of their intent to use a scale without an automatic printer at least three working Days before weighing begins or before the Contractor changes to a scale that does not have an automatic printer. The Contractor shall pay costs for the weigh witness. The hourly cost of the weigh witness will be as stated in the Special Provisions. In addition, the Engineer may periodically check the weight for a load of Materials by directing the haul vehicle to reweigh on a different scale that has been inspected and certified according to 00190.20(b)and 00190.20(d). If a different scale is not available within a 30 mile round trip from the regular haul route the Agency will allow check weighing on an approved alternate basis. Check weights within 0.4% of the Contractor- provided weight are acceptable. The Engineer will resolve discrepancies found by check weighing. Agency employee costs for check weighings will be paid by the Agency. The Contractor shall pay all other costs resulting from the check weighings, including,without limitation, the use of other scales. If more than 50 tons per Day of all types of Materials are received from a scale, the Contractor shall make random check weighings at least every tenth day on which more than 50 tons is received or at each interval that 10,000 tons has been weighed,whichever occurs first,or as directed by the Engineer. The Contractor shall make at least one check weighing on all projects where materials are received from a scale without an automatic printer. The Contractor shall provide the Engineer with the results of the check weighing. (3) Duties of Weigh Technician-The Contractor's weigh technician shall: • Determine twice a Day, or as otherwise directed by the Engineer, the empty haul weights (tare weights)of hauling vehicles, unless vehicles are tared before each load; • Furnish daily a listing of the tare weights if 10 or more loads are hauled during that Day; • Furnish a note listing the net weight for each consecutive ten loads with the following load; • Furnish a daily listing of the net weights and total weight for each type of Material hauled during that Day; and • Furnish a legible, serially numbered weigh memo for each load of Materials to the Agency's Materials receiver at the point of delivery, or as directed by the Engineer. The memo shall identify the Project,the Materials,the date, net weight(gross and tare as appropriate),and identification of vehicle, driver and weigh technician. 122 General Conditions Revised 01/27/2026 00190 Conformed to Bid Documents (g) Agency-Provided Weigh Technician- If the Contractor provides vehicle weigh scales without a weigh technician meeting the requirements of this Subsection, the Agency will provide a weigh technician at the Contractor's expense. The hourly cost for the weigh technician will be as stated in the Special Provisions. The Contractor shall provide a weighhouse for the weigh technician according to Section 00205. The Agency's weigh technician will: • Determine tare weights; • Prepare weigh memos for each load; • Compile the weigh records;and • Not participate in the production of Materials or the loading of haul vehicles. 00190.30 Plant Scales-The Contractor, with the Engineer's written approval, may weigh plant-mixed Materials on scales that have either: • An automatic weight batching and mixing control printer system; or • A weigh hopper printer system. Any additional costs resulting from the use of these scales shall be borne by the Contractor. Check weighing will be done according to 00190.20(f). Except for 00190.20(c) regarding approaches, the Contractor's use of plant scales shall comply with all provisions of 00190.20. The Engineer's approval for the Contractor's use of plant scales to determine pay weights will be rescinded if check weighing or scale inspections indicate the scales do not consistently determine weights within the tolerances allowed by state law. 123 General Conditions Revised 01/27/2026 00195 Conformed to Bid Documents Section 00195-Payment 00195.00 Scope and Limit: (a) General-The Agency will pay only for measured Pay Item quantities incorporated into the Work or performed according to the terms of the Contract. The Contractor understands and agrees that Pay Item quantities listed in the Schedule of Items do not govern payment. Payment constitutes full compensation to the Contractor for furnishing all Materials, Equipment, labor, and Incidentals necessary to complete the Work; and for risk, loss, damage, and expense arising from the nature or prosecution of the Work or from the action of the elements, subject to the provisions of 00170.80. The Contractor shall include the costs of bonds and insurance for the Project in the unit price for each Pay Item of Work to be performed. (b) Essential or Incidental Materials or Work-When the Specifications state that the unit price for a Pay Item is compensation for certain Materials or Work essential or Incidental to the Pay Item,the same Materials or Work will not be measured or paid under any other Pay Item. 00195.10 Payment For Changes in Materials Costs-On certain projects, as identified in the Special Provisions, an escalation/de-escalation clause with respect to steel materials or asphalt cement will be in effect during the life of the Contract. 00195.12 Steel Material Price Escalation/De-Escalation Clause - Subsections 00195.12, 00195.12(a), 00195.12(b), 00195.12(c),and 00195.12(d)contain the price escalation/de-escalation clause relating to steel materials(as defined in 00195.12(d))that is included in this Contract regardless of the number of steel material Pay Items, if any, that are included, and whether or not the Contractor elects to participate in the steel escalation/de-escalation program according to 00195.12(d). (a) Steel Material Price Escalation/De-Escalation Participation —The Contractor may select individual Pay Items to include in the steel escalation/de-escalation program from those Pay Items listed for this Project under 00195.12(d) by following the directions provided in 00195.12(d). The Contractor is not obligated to select any Pay Items. Before or within 5 business days after the date of the preconstruction conference, the Contractor shall submit in writing to the Project Manager the Pay Items selected by the Contractor to be included in the steel escalation/de-escalation program, in the manner required under 00195.12(d). If the Contractor fails to inform the Project Manager of the Pay Items to include in the steel escalation/de-escalation program in the manner and within the time limits stated in 00195.12(d)(or the Contractor otherwise elects not to participate in the program), the Contractor thereby elects not to participate in the program and forfeits all present and future rights to participate in the program for this Project. The Agency reserves all of its rights under the Contract, including, but not limited to, its rights for suspension of the Work under 00180.70 and its rights for termination of the Contract under 00180.90, and this steel material price escalation/de-escalation provision will not limit those rights. Adjustment for fluctuations in the cost of steel material will apply only to the Pay Items individually selected by the Contractor from the Pay Items listed under 00195.12(d), and will be made using the respective steel cost basis (CB)listed. (b) Monthly Steel Materials Value (MV) and Base Steel Material Value (BV) — The Monthly Steel Materials Value (MV)will be established by the Agency from the IDWPUSISTEEL1 Bureau of Labor Statistics (BLS), Producer Price Indexes (PPI) using non-seasonally adjusted indexes only. Preliminary numbers may be referenced on the IDWPUSISTEEL1 BLS PPI for 6 months or more before IDWPUSISTEEL1 BLS PPI determines they are final numbers. The Base Steel Materials Value(BV)for this Project will be the MV published on the ODOT Estimating website (see 00110.05(e))for the month of the Bid Opening for this Project. The Agency will only publish values on the ODOT Estimating website for use after the IDWPUSISTEEL1 BLS PPI establishes the numbers as final numbers.The final values of MV and BV will be available at the ODOT Estimating website. 124 General Conditions Revised 01/27/2026 00195 Conformed to Bid Documents The Agency has no control of when the IDWPUSISTEEL1 BLS PPI establishes final values. The Agency steel material price escalation/de-escalation adjustments made under 00195.12 through 00195.12(d) may not be reflected on payments made to the Contractor for up to 2 months after the IDWPUSISTEEL1 BLS PPI applicable values become final. This timing for steel material price escalation/de-escalation adjustments is an agreed term of this Contract and shall not constitute late payment under ORS 279C.570, nor shall the Agency be responsible to pay interest on any such steel material price adjustments. If the Agency-selected index ceases to be available for any reason,the Agency in its discretion will select and begin using a substitute price source or index to establish the MV each month. The MV will only apply to Pay Items selected by the Contractor and provided in writing to the Project Manager from the Pay Item list contained under,and in the manner and within the time limits required by, 00195.12(d). The Agency does not guarantee that steel material will be available at any stated or implied materials price. (c) Monthly Steel Materials Price Adjustment — If the Contractor has properly informed the Project Manager of Pay Items to include in the steel escalation/de-escalation program as required by 00195.12(a), and 00195.12(d)a price adjustment evaluation will be made for the Pay Items individually selected. No adjustments will be made using the BV or MV until such time as they are listed as final values by the IDWPUSISTEEL1 BLS PPI. The price adjustment as calculated in this provision for a given Pay Item will use the MV for the month the Work associated with that Pay Item is performed and added to the monthly progress estimate. A price adjustment for that Pay Item will only be made if the MV for the month the Work associated with the Pay Item is performed and added to the monthly progress estimate differs by more than 10%from the BV. A price adjustment will be made, as and when required by 00195.12 through 00195.12(d), only for the Pay Items, if any, that were selected by the Contractor in the manner and within the time limits required under 00195.12(a)and 00195.12(d). The Monthly Steel Materials Price Adjustment will be determined as follows: • If the MV is within 10% 0 of the BV, there will be no adjustment. • If the MV is more than 110%of the BV,then: PA= (((MV-BV)=BV)-0.10 )x(CB x PIP) • If the MV is less than 90%of the BV,then: PA= (((MV-BV)=BV)+ 0.10 )x(CB x PIP) Where: PA= Price Adjustment, dollars MV= Monthly Steel Materials Value from BLS PPI for the month determined above(after becomes final) BV= Base Steel Materials Value from month of the Bid Opening (after becomes final) PIP =Amount paid for the Pay Item for the month for which the adjustment is made CB=Cost Basis for the applicable steel material, in percent(see 00195.12(d)) (d) Steel Materials Pay Item Selection-The Agency has a process using estimated quantities to determine which Pay Items containing steel material qualify for the steel escalation/de-escalation program by meeting a minimum threshold, and are therefore included in the eligible Pay Items listed in the Special Provisions. For purposes of 00195.12 through 00195.12(d), "steel material" means structural and reinforcing steel, steel studs, sheet piling, guardrail, ductile iron pipe and other steel products used for the construction, reconstruction or major renovation of a road or Highway. The Contractor may elect to participate in the steel escalation/de-escalation program for this Project by marking the list in the Special Provisions, checking each box next to each Pay Item the Contractor wants 125 General Conditions Revised 01/27/2026 00195 Conformed to Bid Documents included in the program and submitting this information in writing, signed and dated by the Contractor, to the Project Manager before or within seven (7) Calendar Days after the date of the preconstruction conference. The steel material price escalation/de-escalation clause for price adjustments for fluctuations in the cost of steel material will apply only to the Pay Items selected by the Contractor,from the Pay Item list included in the Special Provisions, and provided in writing to the Project Manager in the manner and within the time limits stated above. If the Contractor fails to inform the Project Manager of Pay Items to include in the steel escalation/de- escalation program in the manner and within the time limits stated above (or the Contractor otherwise elects not to participate in the program), the Contractor thereby elects not to participate in the program and forfeits all present and future rights to participate in the program for the Contract and this Project. 00195.13 Asphalt Cement Material Price Escalation/De-Escalation Clause - Subsections 00195.13, 00195.13(a), 00195.13(b), 00195.13(c), and 00195.13(d) contain the price escalation/de-escalation clause relating to asphalt cement materials(as defined in 00195.13(d)). (a) Monthly Asphalt Cement Material Price (MACMP)—The Monthly Asphalt Cement Material Price (MACMP)will be established by the Agency each month and will be based on the published prices of PG 64 22 asphalt cement furnished by Poten & Partners, Inc. The MACMP will be based on the average prices for the Pacific Northwest, Portland Oregon area. Each MACMP for a given month will be the average of the published prices for that MACMP for each Friday in that month. For information regarding the calculation of the MACMP, and for the actual MACMP, go to the ODOT website at: https://www.oregon.gov/ODOT/HWY/business/pages/asphalt-fuel-price.aspx If the ODOT selected index ceases to be available for any reason, the Agency in its discretion will select and begin using a substitute price source or index to establish the MACMP each month. The MACMP will apply to all asphalt cement including but not limited to paving grade, polymer modified,and emulsified asphalts,and recycling agents. The Agency does not guarantee that asphalt cement will be available at the MACMP. (b) Base Asphalt Cement Material Price(Base)-The Base price for this Project is the MACMP published on the ODOT website for the month immediately preceding the bid opening date. (c) Monthly Asphalt Cement Adjustment Factor-The Monthly Asphalt Cement Adjustment Factor will be determined each month as follows: • If the MACMP is within±5%of the Base,there will be no adjustment. • If the MACMP is more than 105%of the Base,then: Adjustment Factor= (MACMP)-(1.05 x Base) • If the MACMP is less than 95%of the Base,then: Adjustment Factor= (MACMP)-(0.95 x Base) (d) Asphalt Cement Price Adjustment—If specified in the Special Provisions, an asphalt cement escalation/de-escalation clause will be in effect during the life of the Contract. A price adjustment will be made for each pay item in the bid schedule containing asphalt cement. The price adjustment as calculated in 00195.13(c)above will use the MACMP for the month the asphalt is incorporated into the Project. The price adjustment will be determined by multiplying the asphalt incorporated during the month for subject Pay Items by the Adjustment Factor. The Agency reserves all of its rights under the Contract, including, but not limited to, its rights for suspension of the Work under 00180.70 and its rights for termination of the Contract under 00180.90, and this escalation/de-escalation provision shall not limit those rights. 00195.20 Changes to Plans or Character of Work: 126 General Conditions Revised 01/27/2026 00195 Conformed to Bid Documents (a) Insignificant Changed Work- If the changes made under 00140.30 do not significantly change the character, quantity or unit cost of the Work to be performed under the Contract, the Agency will pay for such work at the Pay Item price. (b) Significant Changed Work- If the changes made under 00140.30 significantly alter the character, unit cost, or lump sum cost of the Work, the Agency will adjust the Contract. The Contractor shall not be entitled to compensation for any loss in profits resulting from elimination of, reduction of, or other change to, a part of the Work. Any such adjustments may be less than, but will not be more than the amount justified by the Engineer on the basis of the established procedures set out in Section 00197 for determining rates for Extra Work, but those procedures shall account for the decrease or elimination of Work as well as for increases in the Work. This does not limit the application of Section 00199. The term"Significant Changed Work"shall apply only to that circumstance in which the character of the Work, as changed, differs materially in kind, nature, or unit cost from that involved or included in the originally proposed construction. For purposes of this Section, "Significant"is defined as: a) An increase or decrease of more than 25 percent of the total cost of the Work calculated from the original proposal quantities and the unit contract prices; or, b) An increase or decrease of more than 25 percent in the quantity of any one major contract item. For condition b)above, a major item is defined as any item that amounts to 10 percent or more of the original total contract price. 00195.30 Differing Site Conditions-Upon written notification, as required in 00140.40, the Engineer will investigate the identified conditions. If the Engineer determines that the conditions are differing Project site conditions under 00140.40 and cause an increase or decrease in the cost or time required to perform any Work under the Contract,an adjustment in the Contract Amount or Contract Time,excluding loss of anticipated profits,will be made,and the Contract modified accordingly, in writing. The Engineer will notify the Contractor as to whether or not an adjustment of the Contract is warranted. No Contract adjustment which benefits the Contractor will be allowed unless the Contractor has provided the required written notice. Any such adjustments will be made according to 00195.20. 00195.40 Unreasonable Delay by the Agency- If the Contractor believes that performance of all or any portion of the Work is suspended,delayed,or interrupted for an unreasonable period of time in excess of that originally anticipated or customary in the construction industry, due to acts or omissions of the Agency, or persons acting for the Agency, and that additional compensation, Contract Time, or both, are due the Contractor because of the suspension, delay or interruption, the Contractor shall immediately file a written notice of delay according to 00180.60. The Contractor shall then promptly submit a properly supported request for any additional compensation, Contract Time, or both, according to the applicable provisions in 00180.60 through 00180.80 and Section 00199. The Engineer will promptly evaluate a properly submitted request for additional compensation. If the Engineer determines that the delay was unreasonable, and that the cost required for the Contractor to perform the Contract has increased as a result of the unreasonable suspension, delay or interruption, the Engineer will make an equitable adjustment, excluding profit, and modify the Contract in writing accordingly. The Engineer will notify the Contractor of the determination and whether an adjustment to the Contract is warranted. Under this provision, no Contract adjustment will be allowed: • Unless the Contractor has provided the written notice required by 00180.60; 127 General Conditions Revised 01/27/2026 00195 Conformed to Bid Documents • For costs incurred more than 10 Calendar Days before the Engineer receives the Contractor's properly submitted written request; • For any portion of a delay that the Engineer deems to be a reasonable delay,or for which an adjustment is provided for or excluded under other terms of the Contract; or • To the extent that performance would nevertheless have been suspended, delayed or interrupted by causes other than those described in this Subsection. 00195.50 Progress Payments and Retained Amounts: (a) Progress Payments-The Agency's payment of progress payments, or determination of satisfactory completion of Pay Items or Work or release of retainage under 00195.50(d), shall not be construed as Final Acceptance or approval of any part of the Work, and shall not relieve the Contractor of responsibility for defective Materials or workmanship or for latent defects and warranty obligations. The estimates upon which progress payments are based are not represented to be accurate estimates. All estimated quantities are subject to correction in the final estimate. If the Contractor uses these estimates as a basis for making payments to Subcontractors, the Contractor assumes all risk and bears any losses that result. Progress payments shall be determined through the use of forms developed by the Engineer. (1) Progress Estimates-At the same time each month, the Engineer will make an estimate of the amount and value of Pay Item Work completed. The amount of Work completed will be the sum of the estimated number of units completed for unit price Pay Items plus the estimated percentage completed of lump sum Pay Items. The estimated value of the Work completed will be determined by using the Contract unit price for unit price Pay Items,and by using one of the following methods to determine the value of the lump sum Pay Items: • A Contractor-submitted, Engineer-approved Schedule of Values;or • Engineer's determination,when there is no approved, Contractor-submitted Schedule of Values. The amounts to be allowed for lump sum Pay Items in progress payments will not exceed the reasonable value of the Work performed,as determined by the Engineer. Incidentals such as formwork,falsework, shoring,and cribbing shall be included in the unit prices for the various Pay Items requiring their use,unless specified as a separate Pay Item. No payment will be made for Pay Items that include Incidentals until units or portions of such Pay Item Work are in place and completed. The costs of Incidentals will be paid in proportion to the percentage of Pay Item Work completed. (2) Limitations on Value of Work Completed- In determining the "value of Work completed", the Engineer's estimate will be based on the unit prices for the various Pay Items. Any amounts not included in progress payments due to substantial mathematical unbalancing of Pay Item prices will be included in the final payment issued according to 00195.90(b). (3) Reductions to Progress Payments-With each progress payment, the Contractor will receive a Contract payment voucher and summary setting forth the value of Work accomplished reduced by the following: • Amounts previously paid; • Amounts deductible or owed to the Agency for any cause specified in the Contract; 128 General Conditions Revised 01/27/2026 00195 Conformed to Bid Documents • Additional amounts retained to protect the Agency's interests according to Subsection (e)below. (b) Retainage-The amount to be retained from progress payments will be 5% of the value of Work accomplished, and will be retained in one of the forms specified in Subsection (c)below. As provided in 00170.65(b)(3)(a)additional retainage of 25%of amounts earned will be withheld and released according to ORS 279C.845 when the Contractor fails to file the certified statements required in ORS 279C.845, FHWA Form 1273, and 00170.65. (c) Forms of Retainage—Moneys retained by the Agency under ORS 279C.570(7)shall be retained in a fund by the Agency and paid to the Contractor in accordance with ORS 279C.570. Upon written request from the Contractor,other forms of acceptable retainage are specified below in Subsections(1)through(3). "Cash, Alternate A"is the Agency-preferred form of retainage. If the Agency incurs additional costs as a result of the Contractor's election to use a form of retainage other than Cash, Alternate A, the Agency may recover such costs from the Contractor by a reduction of the final payment. (1) Cash, Alternate A-Retainage will be deducted from progress payments and held by the Agency until final payment is made according to 00195.90, unless otherwise specified in the Contract. Except as otherwise provided,The Agency will deposit the cash retainage withheld in an interest-bearing escrow account in a bank,trust company,or other financial institution savings association for the benefit of the Agency, as provided by ORS 279C.560. Interest earned on the account shall accrue to the Contractor. Amounts retained and interest earned will be included in the final payment made according to 00195.90 Any retainage withheld on Work performed by a Subcontractor will be released to the Contractor according to 00195.50(d). (2) Cash,Alternate B(Retainage Surety Bond)- Upon receipt of an approved retainage surety bond, the Agency will limit the amount of cash retainage withheld to$10,000.The surety bond must be in the bond form provided by the Agency. The bond must be provided by the same Surety that provides the Performance and Payment Bonds. If the Contractor elects this form of retainage,the Agency will withhold from progress payments up to 5% of the value of the Work accomplished as cash retainage until the retained amount equals$10,000. After that amount is retained, no further cash retainage will be withheld until the additional required retainage that would have been withheld exceeds the face amount of the retainage surety bond provided. Thereafter, retainage will be withheld from progress payments according to these Specifications. According to 00195.50(b), if at any time the Agency determines that satisfactory progress is not being made on the Work, the Agency may withhold up to 5% of the value of the Work accomplished from subsequent progress payments. If an acceptable retainage surety bond is provided, the Contractor shall notify all Subcontractors of the existence of the retainage surety bond and shall advise them of their rights under ORS 279C.560(7)and ORS 701.435. Amounts of retainage withheld under the provision will be included in the final payment according to 00195.90. Any retainage withheld on Work performed by a Subcontractor shall be released to the Contractor according to 00195.50(d). (3) Bonds, Securities, and Other Instruments- In accordance with ORS 279C.560, unless the Agency finds in writing that accepting a bond, security or other instrument poses an extraordinary risk that is not typically associated with the bond, security or other instrument, the Agency will approve the 129 General Conditions Revised 01/27/2026 00195 Conformed to Bid Documents Contractor's written request to deposit bonds, securities or other instruments with the Agency or in a custodial account or other account satisfactory to the Agency with an approved bank or trust company, to be held instead of cash retainage for the benefit of the Agency. In such event,the Agency will reduce the cash retainage by an amount equal to the value of the bonds, securities and other instruments. Interest or earnings on the bonds, securities and other instruments shall accrue to the Contractor. Bonds, securities and other instruments deposited instead of cash retainage shall be assigned to or made payable to the Agency and shall be of a kind approved by the Director of the Oregon Department of Administrative Services, including but not limited to: • Bills, certificates, notes or bonds of the United States; • Other obligations of the United States or agencies of the United States; • Obligations of a corporation wholly owned by the federal government; • Indebtedness of the Federal National Mortgage Association; • General obligation bonds of the State of Oregon or a political subdivision of the State of Oregon; • Irrevocable letters of credit issued by an insured institution,as defined in ORS 706.008. The Contractor shall execute and provide such documentation and instructions respecting the bonds, securities and other instruments as the Agency may require to protect its interests. When the Engineer determines that all requirements for the protection of the Agency's interest have been fulfilled,the bonds and securities deposited instead of cash retainage will be released to the Contractor. (d) Reduction of Retainage-As the Work progresses, the amounts to be retained under (b) of this Subsection are subject to reduction in the Engineer's sole discretion. Retainage reductions will be considered only as follows: • When the Work is 97.5% or more completed, the Engineer may, without application by the Contractor, reduce the retained amount to 100%of the value of the Work remaining. • For a project funded by the FHWA,when a subcontractor has satisfactorily completed all of its Work, it may request release of retainage for that Work from the Contractor. The Contractor shall request reduction of retainage in the amount withheld for the subcontractor's Work after certifying to the Agency that the subcontractor's Work is complete, and that all contractual requirements pertaining to the subcontractor's Work have been satisfied. Within 60 Calendar Days of the end of the month in which the Agency receives the Contractor's certification regarding the subcontractor's Work, the Agency will either notify the Contractor of any deficiencies which require completion before release of retainage, or verify that the subcontractor's Work complies with the Contract and release all retainage for that Work with the next scheduled progress payment. Within 10 Calendar Days of receipt of retainage,the Contractor shall pay to the subcontractor all such retainage released except for latent defects or warranty. • The Agency will only release retainage for satisfactorily completed portions of the Work represented by Pay Items in the Schedule of Items, or by Pay Items added by Change Order. Work not represented by a Pay Item, but which constitutes part of an uncompleted Pay Item, will not be regarded as satisfactorily completed Work for the purposes of this Subsection. If retainage has been reduced or eliminated,the Agency reserves the right to protect its interests by retaining amounts from further progress payments at the rates provided in 00195.50(b). A determination of satisfactory completion of Pay Items or Work, or the release of retainage, shall not be construed as acceptance or approval of the Work and shall not relieve the Contractor of responsibility for defective Materials or workmanship, or for latent defects and warranty obligations. 130 General Conditions Revised 01/27/2026 00195 Conformed to Bid Documents The Contractor shall comply with all applicable legal requirements for withholding and releasing retainage, and for prompt payments, including, but not limited to, those in ORS Chapters 279C and 701, and 49 CFR 26.29. (e) Withholding Payments- In addition to any other rights the Agency may have to withhold payments under other provisions of the Contract, the Engineer may withhold such amounts from progress payments or final payment as may reasonably protect the Agency's interests until the Contractor has: • Completed all Final Trimming and Cleanup according to 00140.90 and Punch List work according to 00150.90(a). An amount of up to twice the Engineer's estimated value of Final Trimming and Cleaning and Punch List work may be withheld. • Complied with all orders issued by the Engineer according to the Specifications;and • Satisfied all legal actions filed against the Agency, the Agency's governing body and its members, and Agency employees that the Contractor is obliged to defend. (see 00170.72) Notwithstanding ORS 279C.555 or ORS 279C.570 or 00195.50(d),if a Contractor is required to file statements on the prevailing rate of wages,but fails to do so,the Agency will retain 25%of any amount earned as required in 00170.65. (f) Prompt Payment Policy- Payments shall be made promptly according to ORS 279C.560, ORS 279C.570, ORS 279C.580 and other applicable legal requirements. Owner may withhold payments under this Contract as provided under the GFE Program, Enforcement section and Section 00180.87. 00195.55 Monthly or Periodic Subcontractor Payment and Utilization Report(GFE Form 3): Contractor shall submit with the Progress Payment Pay Request, or at such other time as directed by the City's Project Manager,the GFE Form 3. 00195.60 Advance Allowance for Materials on Hand: (a) General—If the total value of materials on hand is at least$1000,or the total value of a single class of Materials on hand is at least$500,the Engineer may authorize an advance allowance for the Materials in the progress payments.The Agency will not make advance allowances on the Materials unless the following three conditions are satisfied: (1)Request for Advance Allowance - If Materials on hand meet the requirement of (2) below, an advance allowance will be made if: • A written request for advance allowance for Materials on hand has been received by the Engineer at least 5 Calendar Days before the pay period cutoff date;and • The request is accompanied by written consent of the Contractor's Surety, if required by the Agency. (2) Stored or Stockpiled Conditions—The Materials shall have been delivered and/or acceptably stored or stockpiled according to the Specifications and as follows: • At the Project Site; • On Agency-owned property; • On property in the State of Oregon on which the property owner has authorized storage in writing. The written authorization must allow the Agency to enter upon the property and remove Materials for at least 6 months after completion of the Project. The Contractor shall furnish a copy of the written permission to the Agency; or 131 General Conditions Revised 01/27/2026 00195 Conformed to Bid Documents • On property outside the State of Oregon on which the property owner has authorized storage in writing, provided that such storage location is allowed by the Special Provisions or authorized in writing by the Engineer. The permit must allow the Agency to enter upon the property and remove Materials for at least 6 months after completion of the Project. The Contractor shall furnish a copy of the written permission to the Agency. To be eligible for advance allowance, the Materials shall: • Meet Specification requirements; • Have the required Materials conformance and quality compliance documents on file with the Engineer(see Section 00165); • Be in a form ready for incorporation into the permanent Work; and • Be clearly marked and identified as being specifically fabricated, or produced,and reserved for use on the Project. • See Special Provisions (3) Responsibility for Protection —The Contractor has full control and responsibility for the protection of materials on hand from the elements and against damage, loss, theft, or other impairment until the entire Project has been completed and accepted by the Agency. If the materials are damaged, lost, stolen, or otherwise impaired while stored, the monetary value advanced for them, if any,will be deducted from the next progress payment. If these conditions in 00195.60(a)(1) through 00195.60(a)(3) have been satisfied, the amount of advance allowance, less the retainage described in 00195.50, will be determined by one of the following methods as elected by the Engineer: • Net cost to the Contractor of the Materials,f.o.b. the Project Site or other approved site; or • Price (or portion of it attributable to the Materials), less the cost of incorporating the Materials into the Project, as estimated by the Engineer. (b) Proof of Payment—The Contractor shall provide the Engineer with proof of payment to the materials Suppliers for purchased Materials within 30 Calendar Days of the date of the progress payment that includes the advance allowance. If proof of payment is not provided, sums advanced will be deducted from future progress payments, and the Engineer will not approve further prepayment advance allowance requests. (c) Terminate Contract—If the Contract is terminated, the Contractor shall provide the Agency immediate possession of all Materials for which advance allowances have been received, as provided above. If, for any reason, immediate possession of the Materials cannot be provided, the Contractor shall immediately refund to the Agency the total amount advanced for the Materials. The Agency may deduct any amount not so refunded from final payment. 00195.70 Payment under Terminated Contract-Payment for Work performed under a Contract that is terminated according to the provisions of 00180.90 will be determined under(a)or(b)of this Subsection. (a) Termination for Default-Upon termination of the Contract for the Contractor's default,the Agency will make no further payment until the Project has been completed. The Agency will make progress payments to the party to whom the Contract is assigned,but may withhold an amount sufficient to cover anticipated Agency costs, as determined by the Engineer,to complete the Project. 132 General Conditions Revised 01/27/2026 00195 Conformed to Bid Documents Upon completion of the Project, the Engineer will determine the total amount that the defaulting Contractor would have been entitled to receive for the Work, under the terms of the Contract, had the Contractor completed the Work(the"cost of the completed Work"). If the cost of the completed Work, less the sum of all amounts previously paid to the Contractor, exceeds the expense incurred by the Agency in completing the Work, including, without limitation, expense for additional managerial and administrative services, the Agency will pay the excess to the Contractor, subject to the consent of the Contractor's Surety. If the expense incurred by the Agency in completing the Work exceeds the Contract Amount, the Contractor or the Contractor's Surety shall pay to the Agency the amount of the excess expense. The Engineer will determine the expense incurred by the Agency and the total amount of Agency damage resulting from the Contractor's default. That determination will be final as provided in 00150.00. If a termination for default is determined by a court of competent jurisdiction to be unjustified,it shall be deemed a termination for public convenience, and payment to the Contractor will be made as provided in Subsection (b)below. (b) Termination for Public Convenience: (1) General-Full or partial termination of the Contract shall not relieve the Contractor of responsibility for completed or performed Work, or relieve the Contractor's Surety of the obligation for any just claims arising from the completed or performed Work. (2) Mobilization- If mobilization is not a separate Pay Item, and payment is not otherwise provided for under the Contract, the Agency may pay the Contractor for mobilization expenses, including moving Equipment to and from the Project Site. If allowed, payment of mobilization expenses will be based on cost documentation submitted by the Contractor to the Engineer. (3) All Other Work-The Agency shall pay the Contractor at the unit price for the number of Pay Item units of completed, accepted Work. For units of Pay Items partially completed, payment will be as mutually agreed,or, if not agreed,as the Engineer determines to be fair and equitable. No claim for loss of anticipated profits will be allowed. The Agency will purchase Materials left on hand according to 00195.80. 00195.80 Allowance for Materials Left on Hand: (a) Purchase of Unused Materials- If Materials are delivered to the Project Site, or otherwise acceptably stored at the order of the Engineer, but not incorporated into the Work due to complete or partial elimination of Pay Items, changes in Plans, or termination of the Contract for public convenience according to 00180.90, and it is not commercially feasible for the Contractor to return them for credit or otherwise dispose of them on the open market; the Agency may purchase them according to the formula and conditions specified in Subsection (b)below. (b) Purchase Formula and Conditions: (1) Formula-The Agency will apply the following formula in determining the Contractor's allowance for Materials left on hand: Contractor's Actual Cost, plus 5% Overhead Allowance, minus Advance Allowances under 00195.60, but no markup or profit. (2) Conditions-The Agency will not purchase the Contractor's Materials left on hand unless the Contractor satisfies the following conditions: 133 General Conditions Revised 01/27/2026 00195 Conformed to Bid Documents • Requests the Agency's purchase of unused Materials; • Shows acquisition of the Materials according to 00160.10; • Shows that the Materials meet Specifications; • Provides receipts, bills and other records of actual cost of Materials delivered to the designated delivery points; and • Demonstrates to the satisfaction of the Engineer that the materials cannot be returned for credit or otherwise disposed of on the open market. 00195.90 Final Payment: (a) Final Estimate-As soon as practicable after Final Inspection of the Project, as provided in 00150.90, the Engineer will prepare a final estimate of the quantities of the Pay Items completed. With this estimate of quantities as a base, the total amount due the Contractor will be determined according to the terms of the Contract, including,without limitation, any amounts due for Extra Work performed. (b) Final Payment-The amount of final payment will be the difference between the total amount due the Contractor and the sum of all payments previously made. All prior partial estimates and payments shall be subject to correction in the final estimate and payment. If Contractor is a Foreign Contractor, the Contractor shall promptly report to the Oregon Department of Revenue on forms provided by the Department of Revenue, the Contract Price, terms of payment, Contract duration and such other information as the Department of Revenue may require before final payment can be made on the Contract.A copy of the report shall be forwarded to the Engineer. [OAR 137-049-0490]. After computation of the final amount due,and after Engineer's issuance of the Third Notification,final payment will be mailed to the Contractor's last known address as shown in the records of the Agency. Beginning 30 Calendar Days after the date of Third Notification, interest will begin to accrue at the rate established by ORS 279C.570 on any money due and payable to the Contractor as final payment,determined as described above. No interest will be paid on money withheld due to outstanding amounts owed by the Contractor under the provisions of 00170.10. (c) No Waiver of Right to Make Adjustment-The fact that the Agency has made any measurement, estimate, determination or certification either before or after completion of the Project, Final Acceptance, Agency assumption of possession of the Project Site, determination of satisfactory completion of Pay Items or Work or release of retainage under 00195.50(d) or payment for any part of the Work, shall not prevent either party from: • Showing the true amount and character of the Work; • Showing that any measurement, estimate,determination or certification is incorrect; • Recovering from the other party damages that may have been suffered because the other party failed to comply with the Contract. (d) Evidence of Contractor Payments—As a condition of final payment, the Engineer may require the Contractor to submit evidence, satisfactory to the Engineer, that all payrolls, material bills, and other indebtedness connected with the project have been paid,except that in case of any disputed indebtedness or liens, the Contractor may submit in lieu of evidence of payment, a surety bond satisfactory to the Agency guaranteeing payment of all such disputed amounts when adjudicated in cases where such payment has not already been guaranteed by surety bond. 00195.95 Error in Final Quantities and Amounts: 134 General Conditions Revised 01/27/2026 00195 Conformed to Bid Documents (a) Request for Correction of Compensation - If the Contractor believes the quantities and amounts detailed in the final Contract payment voucher, prepared by the Engineer according to 00195.90, to be incorrect,the Contractor shall submit an itemized statement to the Engineer detailing all proposed corrections. This statement must be submitted to the Engineer within 90 Calendar Days from the date the voucher was mailed to the Contractor, according to 00195.90(b). Any request for compensation not submitted and supported by an itemized statement within the 90 Calendar Day period will not be paid by the Agency. This does not limit the application of Section 00199. (b) Acceptance or Rejection of Request: (1) Consideration of Request-The Engineer will consider and investigate the Contractor's request for correction of compensation submitted according to 00195.95(a), and will promptly advise the Contractor of acceptance or rejection of the request in full or in part. (2) Acceptance of Request- If the Engineer accepts the Contractor's request(s) in full or in part, the Engineer will prepare a post-final Contract payment voucher, including all accepted corrections,and will forward it to the Contractor. (3) Rejection of Request- If the Engineer rejects the request(s)in full,the Engineer will issue a written notice of rejection and mail it to the Contractor. (4) Contractor Objection to Revised Voucher or Notice of Rejection- If the Contractor disagrees with the revised voucher or notice of rejection,the Contractor may seek review and resolution according to the procedure specified in 00199. If the Contractor fails to submit a request for 00199 review within 30 Calendar Days after the Engineer mails a post-final Contract payment voucher or notice of rejection, the Contractor waives all rights to a claim based on errors in quantities and amounts. 00195.96 Waiver of Claims (a) The making and acceptance of final payment will constitute: (1) A waiver of all Claims by Agency against Contractor, except Claims arising from unsettled Liens, from defective Work appearing after final inspection pursuant to 00150.90, from failure to comply with the Contract Documents or the terms of any special guarantees specified therein, or from Contractor's continuing obligations under the Contract Documents; and (2) A waiver of all Claims by Contractor against Agency other than those previously make in accordance with the requirements herein and expressly acknowledged by Agency in writing as still unsettled. 135 General Conditions Revised 01/27/2026 00196 Conformed to Bid Documents Section 00196-Payment for Extra Work 00196.00 General-Only work not included in the Contract as awarded but deemed by the Engineer to be necessary to complete the Project(see 00140.60)will be paid as Extra Work. Regardless of alterations and changes,any item of Work provided for in the Contract will not constitute Extra Work. Payment for alterations and changes to Work will be made according to 00195.20. Compensation for Extra Work will be paid only for Work authorized in writing by the Engineer and performed as specified. Work performed before issuance of the Engineer's written authorization shall be at the Contractor's risk. Extra Work will be paid as determined by the Engineer, according to 00196.10 and 00196.20. 00196.10 Negotiated Price- If the Engineer can reasonably determine a price estimate for Extra Work, the Engineer may then give written authorization to the Contractor to begin the Extra Work. As soon as practicable, but within 10 Calendar Days after that authorization,the Contractor shall respond in writing to the Engineer's Extra Work price estimate by submitting to the Engineer an Extra Work price quote. The price quote shall detail the following items related to the Extra Work: • Types and amounts of Materials • Hours of Equipment use and hours of labor • Travel • Overhead and profit • Other costs associated with the proposed Extra Work Pending approval of the price quote, the Engineer will maintain force account records of the Extra Work. As soon as practicable, but within 10 Calendar Days of receipt of a properly supported price quote,the Engineer will review the price quote and advise the Contractor if it is accepted or rejected. The Engineer will not accept a price quote that cannot be justified on a Force Account basis. If the Contractor's price is accepted, the Engineer will issue a Change Order, and the Extra Work will be paid at the accepted price. 00196.20 Force Account- If the Engineer and the Contractor cannot agree on a price for the Extra Work, the Engineer may issue a Force Account Work order requiring the Extra Work to be paid as Force Account Work. Force Account Work records and payment will be made according to Section 00197. 136 General Conditions Revised 01/27/2026 00197 Conformed to Bid Documents Section 00197 -Payment for Force Account Work 00197.00 Scope- The Materials, Equipment and Labor rates and procedures established in this Section apply only to Extra Work ordered by the Engineer to be performed as Force Account Work. 00197.01 General: (a) Extra Work on a Force Account Basis- Before ordering Force Account Work,the Engineer will discuss the proposed work with the Contractor, and will seek the Contractor's comments and advice concerning the formulation of Force Account Work specifications. The Engineer is not bound by the Contractor's comments and advice, and has final authority to: • Determine and direct the Materials, Equipment and Labor to be used on the approved Force Account Work; and • Determine the time of the Contractor's performance of the ordered Force Account Work. Force account work performed by subcontractors will be measured and paid for on the same basis and in the same manner as force account work performed directly by the Contractor. If the Engineer orders the performance of Extra Work as Force Account Work, the Engineer will record, on a daily basis, the Materials, Equipment, Labor, and Special Services used for the Force Account Work during that day. The Engineer and the Contractor shall sign the record daily to indicate agreement on the Materials, Equipment, Labor,and Special Services used for the Force Account Work performed on that day. The following shall be reflected on the daily record: • Materials used in the Force Account Work as directed by the Engineer,except those furnished and paid under rental rates for use of Equipment; • Equipment that the Engineer considers necessary to perform the Force Account Work. Equipment hours will be recorded to the nearest quarter hour; • Labor costs, including that of Equipment operators and supervisors in direct charge of the specific operations while engaged in the Force Account Work; • Special Services; and • The Engineer's and Contractor's signatures confirming its accuracy. (b) Other Work-When according to other Sections this Section 00197 applies, the following exceptions apply to the Work under those other Sections,except for Extra Work ordered by the Engineer to be performed as Force Account Work. • 00197.01(a)does not apply. • Cost Efficiency-The Agency will not be responsible for additional costs that are a direct or indirect result of the Contractor's inefficient means and methods,or that reasonably could have been avoided if the Materials, Equipment, labor or services had been obtained at a more commercially reasonable cost. • Standby Time- Equipment that is necessary for the Work but is not being operated to progress the Work will be considered to be on standby and will be limited to the standby rates and hour limitations in 00197.20(e). Equipment costs will be limited to a combination of operating time and standby time of not more than eight (8)hours in a 24 hour period or 40 hours in a one (1)week period. The Equipment must be onsite and available for use to be eligible for standby time. For a period of seven (7)or fewer Calendar Days: If a continuous period of standby time for a piece of Equipment does not exceed seven (7)Calendar Days, the accumulated standby cost for that 137 General Conditions Revised 01/27/2026 00197 Conformed to Bid Documents continuous period of standby time shall be limited to the standby rates and hour limitations in 00197.20(e). For a period of more than seven (7)Calendar Days: Unless the Engineer has otherwise agreed in advance in writing, if a continuous period of standby time for a piece of Equipment exceeds seven (7) Calendar Days, the accumulated standby cost shall be limited to: • For the first seven (7) Calendar Days,the standby rates and hour limitations in 00197.20(e), and • For the portion of the continuous period of standby time after the first seven(7)Calendar Days,the lesser of: • The standby rates and hour limitations in 00197.20(e);or • The cost for moving that piece of Equipment to and from the Project Site according to 00197.20(d). 00197.10 Materials: (a) General -The Contractor will be paid for Materials actually used in the Force Account Work as directed by the Engineer,except for those furnished and paid for under rental rates included with the use of Equipment. Payments will be at actual cost, including transportation costs to the specified location, from the supplier to the purchaser,whether the purchaser is the Contractor,a Subcontractor,or other forces. All costs are subject to the provisions of this Subsection. (b) Trade Discount- If a commercial trade discount is offered or available to the purchaser, it shall be credited to the Agency,even though the discount may not have actually been taken. The Agency will not take any discounts for prompt or early payment,whether or not offered or taken. (c) Not Directly Purchased From Supplier- If Materials cannot be obtained by direct purchase from and direct billing by the supplier,the cost shall be considered to be the price billed to the purchaser less commercial trade discounts, as determined by the Engineer, but not more than the purchaser paid for the Materials. No markup other than actual handling costs will be permitted. (d) Purchaser-Owned Source- If Materials are obtained from a supply or source wholly or partly owned by the purchaser,the cost shall not exceed the price paid by the purchaser for similar Materials furnished from that source on Pay Items, or the current wholesale price for the Materials delivered to the Project Site, whichever is lower. 00197.20 Equipment: (a) General -Equipment approved by the Engineer to perform the Force Account Work will be eligible for payment at the established rates only during the hours it is operated or on standby if so ordered by the Engineer. Equipment hours will be recorded on the daily record to the nearest quarter hour. Except as modified by these provisions, Equipment use approved by the Engineer will be paid at the rental rates given in the most current edition of the Rental Rate Blue Books for Construction Equipment ("Blue Book"), Volumes 1, 2, and 3, published by Penton Media, Inc., and available from EquipmentWatch (phone 1-800-669-3282). (b) Equipment Description-On the billing form for Equipment costs, the Contractor shall submit to the Engineer sufficient information for each piece of Equipment and its attachments to enable the Engineer to determine the proper rental rate from the Blue Book. (c) Rental Rates(without Operator): (1) Rental Rate Formula-Rental rates for Equipment will be paid on an hourly basis for Equipment and for attachments according to the following formula: 138 General Conditions Revised 01/27/2026 00197 Conformed to Bid Documents ' - Monthly Base Rate x Rate Adjustment Factor Hourly -._ _ , _ r 176 hours/month Rate = + Hourly Operating Rate Some attachments are considered "standard Equipment"and are already included in the monthly base rate for the Equipment. That information can be obtained from EquipmentWatch. (2) Monthly Base Rate-The monthly base rate used above for the machinery and for attachments represents the major costs of Equipment ownership, such as depreciation, interest, taxes, insurance, storage, and major repairs. (3) Rate Adjustment Factor—The rate adjustment factor used above will be determined by applying only the Model Year Adjustment to the Blue Book Rates. The Regional and User Defined Ownership/Operating Adjustments shall not apply. (4) Hourly Operating Rate-The hourly operating rate used above for the machinery and for attachments represents the major costs of Equipment operations, such as fuel and oil, lubrications,field repairs, tires or ground engaging components,and expendable parts. (5) Limitations If multiple attachments are included with the rental Equipment, and are not considered "standard Equipment", only the attachment having the higher rental rate will be eligible for payment, provided the attachment has been approved by the Engineer as necessary to the Force Account Work. Rental will not be allowed for small tools that have a daily rental rate of less than $5, or for unlisted Equipment that has a fair market value of$400 or less. The above rates apply to approved Equipment in good working condition. Equipment not in good working condition, or larger than required to efficiently perform the work, may be rejected by the Engineer or accepted and paid for at reduced rates. (d) Moving Equipment- If it is necessary to transport Equipment located beyond the Project Site exclusively for Force Account Work, the actual cost to transport the Equipment to, and return it from, its On- Site Work location will be allowed as an additional item of expense. However,the return cost will not exceed the original delivery cost. These costs will not be allowed for Equipment that is brought to the Project Site for Force Account Work if the Equipment is also used on Pay Item or related Work. If transportation of such Equipment is by common carrier, payment will be made in the amount paid for the freight. No markups will be allowed on common carrier transportation costs. If the Equipment is hauled with the Contractor's own forces,transportation costs will include the rental rate of the hauling unit and the hauling unit operator's wage. If Equipment is transferred under its own power,the rental rate allowed for transportation time will be 75% of the appropriate hourly rate for the Equipment, without attachments, plus the Equipment operator's wage. (e) Standby Time- If ordered by the Engineer, standby time will be paid at 40% of the hourly rental rate calculated according to this Subsection, excluding the hourly operating rate. Rates for standby time that are calculated at less than$1 per hour will not be paid. Payment will be limited to not more than 8 hours in a 24- hour period or 40 hours in a one week period. Standby Time provisions shall also apply to Section 00195— Payment. (f) Blue Book Omissions- If a rental rate has not been established in the Blue Book,the Contractor may: 139 General Conditions Revised 01/27/2026 00197 Conformed to Bid Documents • If approved by the Engineer, use the rate of the most similar model found in the Blue Book, considering such characteristics as manufacturer, capacity, horsepower, age and fuel type; • Request EquipmentWatch to furnish a written response for a rental rate on the Equipment, which shall be presented to the Engineer for approval; or • Request that the Engineer establish a rental rate. (g) Outside Rental Equipment- If Contractor-owned or Subcontractor-owned Equipment is not available, and Equipment is rented from outside sources, payment will be based on the actual paid invoice. Approval of the Engineer to rent from outside sources must be obtained prior to renting the equipment. If the invoice specifies that rental rate does not include fuel, lubricants,field repairs, and servicing,an amount equal to the Blue Book hourly operating cost may be added for those items that were excluded. The Agency may reduce the payment when the invoice amount plus allowance is higher than the amount authorized under(c)through (f)of this Subsection. The provisions of 00180.20(c)apply to owner-operated Equipment. 00197.30 Labor-The Contractor will be paid for all labor engaged directly on Force Account Work, including Equipment operators and supervisors in direct charge of the specific force account operations,as follows: (a) Wages-The actual wages paid to laborers and supervisors, if those wages are paid at rates not more than those for comparable labor currently employed on the Project, or at the recognized, current, prevailing rates in the locality of the Project. (b) Required Contributions-The actual cost of industrial accident insurance, unemployment compensation contributions, payroll transit district taxes, and social security for old age assistance contributions incurred or required under statutory law and these Specifications. The actual cost of industrial accident insurance is the National Council on Compensation Insurance(NCCI)rate for the assigned risk pool for the appropriate work class multiplied by the experience modification factor for the Contractor. (c) Required Benefits-The actual amount paid to, or on behalf of, workers as per diem and travel allowances, health and welfare benefits, pension fund benefits,or other benefits when such other benefits are required by a collective bargaining agreement or other employment contract generally applicable to the classes of labor employed on the Project. No overtime will be compensated unless authorized by the Engineer, in advance of performing the Work. No percentage markup will be allowed other than that specified in 00197.80. 00197.80 Percentage Allowances-To the Contractor's actual costs incurred, as limited in this Section 00197, amounts equal to a percentage markup of such costs will be allowed and paid to the Contractor as follows: Subsection Percent 00197.10 Materials 17 00197.20 Equipment 17 00197.30 Labor 22 00197.40 Special Services 8 When a Subcontractor performs ordered Force Account Work, the Contractor will be allowed a supplemental markup of 8%on each Force Account Work order. 140 General Conditions Revised 01/27/2026 00197 Conformed to Bid Documents These allowances made to the Contractor will constitute complete compensation for bonds, insurance, overhead, general and administrative expense, profit, and all other Force Account Work costs that were incurred by the Contractor, or by other forces that the Contractor furnished. No other reimbursement, compensation, or payment will be made. 00197.90 Billings-Billings for Force Account Work by the Contractor shall be submitted for the Engineer's approval on forms provided by the Agency or approved by the Engineer. Billings for Materials (other than Incidental items out of the inventory of the Contractor or Subcontractors),rental Equipment from sources other than the Contractor or Subcontractors, and Special Services, shall be accompanied by copies of invoices for the goods and services. The invoices shall be fully itemized showing dates, quantities, unit prices, and complete descriptions of goods and services provided. Invoices for amounts of$10 or less per invoice are not required, unless requested by the Engineer. Costs included on the billings shall comply with 00197.01(a)and 00197.10 through 00197.40. When a billing for Force Account Work has been paid at the Project level, no further corrections will be made because of further review if those corrections amount to less than$10. 141 General Conditions Revised 01/27/2026 00199 Conformed to Bid Documents Section 00199-Disagreements, Protests, and Claims 00199.00 General-This Section details the process through which the parties agree to resolve any claims (including disagreements and protests).The Agency will not consider direct disagreements,protests,or claims from subcontractors, suppliers, or any other Entity not a party to the Contract. 00199.10 Engineer's Decision Required-All Claims, except those waived pursuant to 00195.96, shall be referred to the Engineer for decision. A decision by Engineer shall be required as a condition precedent to any exercise by Agency or Contractor of any rights or remedies either may otherwise have under the Contract Documents or by Laws and Regulations in respect of such Claims. 00199.20 Notices-Written notice stating the general nature of each Claim,shall be delivered by the claimant to Engineer(Contractor Claim)or by the Agency to the Contractor(Agency Claim), and the other party to the Contract promptly (but in no event later than 30 days) after the start of the event giving rise thereto. The responsibility to substantiate a Claim shall rest with the party making the Claim. Notice of the amount or extent of the Claim,with supporting data shall be delivered to the other party to the Contract within 60 days after the start of such event(unless Engineer allows additional time for claimant to submit additional or more accurate data in support of such Claim). A Claim for an adjustment in Contract Price shall be prepared in accordance with the provisions of 00195 and 00197. A Claim for an adjustment in Contract Time shall be prepared in accordance with the provisions of 00180 and 00195. Each Claim shall be accompanied by claimant's written statement that the adjustment claimed is the entire adjustment to which the claimant believes it is entitled as a result of said event. The opposing party shall submit any response to the claimant within 30 days after receipt of the claimant's last submittal (unless Engineer allows additional time). No Claim for an adjustment in Contract Price or Contract Times will be valid if not submitted in accordance with this 00199. 00199.30 Engineer's Action: Engineer will review each Claim and, within 30 days after receipt of the last submittal of the claimant or the last submittal of the opposing party, if any,take one of the following actions in writing: (a) deny the Claim in whole or in part, (b) approve the Claim, or (c) notify the parties that the Engineer is unable to resolve the Claim if, in the Engineer's sole discretion, it would be inappropriate for the Engineer to do so. For purposes of further resolution of the Claim, such notice shall be deemed a denial. 00199.40 Engineer's Inaction- In the event that Engineer does not take action on a Claim within said 30 days,the Claim shall be deemed denied. 00199.50 Engineer's Decision - Engineer's written action under 00199.30 or denial pursuant to 00199.40 will be final and binding upon Agency and Contractor, unless Agency or Contractor invoke the dispute resolution procedure set forth herein within 30 days of such action or denial. 00199.60 Dispute Resolution - (a) Meet to Confer and Negotiate— (1) Engineer's action under 00199.30 or a denial pursuant to 00199.40 shall become final and binding 30 days after receipt of written notice of Engineer's action or decision unless,within that time period,Agency or Contractor gives to the other party written notice of intent to submit the Claim to a process of bilateral negotiations as set forth below. 142 General Conditions Revised 01/27/2026 00199 Conformed to Bid Documents (2) Within 30 days of the delivery of such notice, Agency and Contractor shall meet and confer regarding the Claim. A good-faith effort to negotiate resolution shall be made by both parties. (3) If the negotiations contemplated by 00199.60(a)(2) are unsuccessful, management representatives of Agency and Contractor at least one tier above the individuals who met under 00199.60(a)(2) shall meet, confer, and negotiate within 30 days of the closure of the unsuccessful negotiations. (4) If the Claim is not resolved by negotiation,Engineer's action under 00199.30 or a denial pursuant to 00199.40 shall become final and binding 30 days after termination of the negotiations unless, within that time period,Agency or Contractor: • Elects in writing to demand arbitration of the Claim, pursuant to 00199.60(b),or • Agrees with the other party to submit the Claim to another dispute resolution process. (b) Arbitration— (1) All Claims or counterclaims, disputes, or other matters in question between Agency and Contractor arising out of or relating to the Contract Documents or the breach thereof (except for Claims which have been waived by the making or acceptance of final payment as provided by 00195.96)including but not limited to those not resolved under the provisions of 00199.60(a)will be decided by arbitration in accordance with the rules and procedures of the arbitrator or arbitration provider,subject to the conditions and limitations of this subsection. This agreement to arbitrate and any other agreement or consent to arbitrate entered into will be specifically enforceable under the prevailing law of any court having jurisdiction. (2) The demand for arbitration will be filed in writing with the other party to the Contract and with the selected arbitrator or arbitration provider(unless the parties agree otherwise, the arbitrator provider shall be the Arbitration Service of Portland),and a copy will be sent to Engineer for information. The demand for arbitration will be made within the 30 day period specified in 00199.60(a)(4), and in all other cases within a reasonable time after the Claim or counterclaim, dispute, or other matter in question has arisen,and in no event shall any such demand be made after the date when institution of legal or equitable proceedings based on such Claim or other dispute or matter in question would be barred by the applicable statute of limitations. (3) No arbitration arising out of or relating to the Contract Documents shall include by consolidation, joinder, or in any other manner any other individual or entity (including Engineer, and Engineer's consultants and the officers, directors, partners, agent, employees or consultants of any of them) who is not a party to this Contract unless: • the inclusion of such other individual or entity is necessary if complete relief is to be afforded among those who are already parties to the arbitration; and • such other individual or entity is substantially involved in a question of law or fact which is common to those who are already parties to the arbitration and which will arise in such proceedings. (4) The award rendered by the arbitrator(s)shall be consistent with the agreement of the parties, in writing, and include: (i) a concise breakdown of the award; (ii) a written explanation of the award specifically citing the Contract Document provisions deemed applicable and relied on in making the award. 143 General Conditions Revised 01/27/2026 00199 Conformed to Bid Documents (5) The award will be final. Judgement may be entered upon it in any court having jurisdiction thereof, and it will not be subject to modification or appeal, subject to provisions of the Controlling Law relating to vacating or modifying an arbitral award. (6) The fees and expenses of the arbitrators and any arbitration service shall be shared equally by Agency and Contractor. (c) Mediation— (1) Notwithstanding the formal claims procedure specified above, the parties may enter into nonbinding mediation by mutual agreement at any time, in which case the parties may also agree to suspend the time requirements in Section 00199 pending the outcome of the mediation process. The rules,time and place for mediation,as well as selection of the mediator,shall be established by mutual agreement. Costs shall be divided equally between the Contractor and the Agency. Either party may terminate mediation at any time upon five Calendar Day's notice to the other, after which the time requirements of Section 00199 shall be automatically reinstated and shall resume from the point at which the time requirements were suspended. 144 General Conditions Revised 01/27/2026 Conformed to Bid Documents Conformed to Bid Documents WO 378 2026 PAVEMENT REHABILITATION PROJECT Special Provisions Table of Contents PART 00100 — GENERAL CONDITIONS 4 Section 00110—Organization, Conventions,Abbreviations, and Definitions 4 Section 00120—Bidding Requirements and Procedures 5 Section 00130—Award and Execution of Contract 7 Section 00140—Scope of Work 8 Section 00150—Control of Work 8 Section 00160—Source of Materials 10 Section 00165—Quality of Materials 10 Section 00170—Legal Relations and Responsibilities 11 Section 00180—Prosecution and Progress 13 Section 00190—Measurement of Pay Quantities 17 Section 00195—Payment 17 PART 00200 — TEMPORARY FEATURES AND APPURTENANCES 17 Section 00205—Field Laboratory, Weigh house, Etc. 17 Section 00210—Mobilization 17 Section 00220—Accommodation for Public Traffic 17 Section 00221—Common Provisions For Work Zone Traffic Control 21 Section 00222—Temporary Traffic Control Signs 22 Section 00223—Work Zone Traffic Control Labor And Vehicles 23 Section 00270—Temporary Fences 23 Section 00280—Erosion and Sediment Control 24 Section 00290—Environmental Protection 25 PART 00300 - ROADWORK 26 Section 00305—Construction Survey Work 26 Section 00310—Removal Of Structures And Obstructions 27 Section 00320—Clearing and Grubbing 27 Section 00331—Subgrade Stabilization 27 2026/WO 378 Special Provisions-1 Revised 02-04-2022 Conformed to Bid Documents Section 00350—Geosynthetic Installation 27 PART 00400 - DRAINAGE AND SEWERS 28 Section 00405—Trench Excavation, Bedding, and Backfill 28 Section 00440—Commercial Grade Concrete 28 Section 00470—Manholes, Catch Basins, And Inlets 28 Section 00490—Work On Existing Sewers And Structures 29 Section 00495 -Trench Resurfacing 30 PART 00600 - BASES 30 Section 00610—Reconditioning Existing Roadway 30 Section 00620-Cold Plane Pavement Removal 30 Section 00641—Aggregate Subbase, Base and Shoulder 31 Section 00730—Emulsified Asphalt Tack Coat 31 Section 00744—Asphalt Cement Pavement 32 Section 00748—Asphalt Concrete Pavement Repair 48 Section 00749 - Miscellaneous Asphalt Concrete Structures 48 Section 00759 - Miscellaneous Portland Cement Concrete Structures 48 PART 00800 - PERMANENT TRAFFIC SAFETY AND GUIDANCE DEVICES 50 Section 00850—Common Provisions For Pavement Markings 50 Section 00850—Common Provisions For Pavement Markings 50 Section 00855—Pavement Markers 50 Section 00865—Longitudinal Pavement Markings—Durable 50 Section 00867—Transverse Pavement Markings—Legends and Bars 51 Section 00905—Removal And Reinstallation Of Existing Signs 51 Section 00940—Signs 51 Section 00950- Removal Of Electrical Systems 52 Section 00960—Common Provisions For Electrical Systems 52 Section 00962—Metal Illumination And Traffic Signal Supports 53 Section 00990—Traffic Signals 54 Section 01030-Seeding 58 Section 01040- Planting 59 Section 01070—Mailbox Supports 59 2026/WO 378 Special Provisions-2 Revised 02-04-2022 Conformed to Bid Documents Section 01095—Site Furnishings 59 PART 01100 -WATER SUPPLY SYSTEMS 60 Section 01140—Potable Water Pipe and Fittings 60 Section 01150—Potable Water Valves 62 Section 01170—Potable Water Service Connections, 2 Inch And Smaller 62 PART 02000 - MATERIALS 63 Section 02030—Supplementary Cementitious Materials 63 Section 02050—Curing Materials 63 Section 02320-Geosynthetics 63 Section 02450—Manhole and Inlet Materials 63 Section 02470—Potable Water Pipe Materials 64 Section 02475—Potable Water Fitting Materials 64 Section 02480—Potable Water Valve Materials 64 Section 02485—Hydrant and Appurtenance Materials 65 Section 02490—Potable Water Service Connection Materials, 2 Inch and Smaller 65 Section 02560- Fasteners 65 Section 02910—Sign Materials 65 2026/WO 378 Special Provisions-3 Revised 02-04-2022 Conformed to Bid Documents SPECIAL PROVISIONS CITY OF LAKE OSWEGO PART 00100—GENERAL CONDITIONS Section 00110—Organization, Conventions,Abbreviations,and Definitions Comply with Section 00110 of the Standard Specifications modified as follows: 00110.05(e) Reference to Websites-Add the following bullet list to the end of this subsection: • American Traffic Safety Services Association (ATSSA) www.atssa.com • BidExpress www.bidx.com • EquipmentWatch www.equipmentwatch.com • ODOT Construction Section www.oregon.gov/odot/construction/pages/index.aspx • ODOT Construction Section-Qualified Products List(QPL) www.oregon.gov/ODOT/Construction/Pages/Qualified-Products.aspx • ODOT Construction Surveying Manual for Contractors www.oregon.gov/ODOT/ETA/Documents Geometronics/Construction-Survey-Manual-Contractors.pdf • ODOT Electronic Bidding Information Distribution System (eBids) (Also referred to as ODOT eBids website) https://ecmnet.odot.state.or.us/ebidse • ODOT Estimating-Steel Material Values www.oregon.gov/ODOT/Business/Pages/Steel.aspx • ODOT Oregon Trucking Online-"Highway Restriction Notice-Size and/or Weight" (Form No. 734-2357) www.oregontruckingonline.com/cf/MCAD/pubMetaEntry/restriction/ • ODOT Procurement Office-Conflict of Interest Guidelines and Disclosure Forms www.oregon.gov/ODOT/Business/Procurement/Pages/PSK.aspx • ODOT Procurement Office-Construction Contracts Unit Notice of Intent www.oregon.gov/ODOT/Business/Procurement/Pages/NOI.aspx • ODOT Procurement Office-Construction Contracts Unit prequalification forms www.oregon.gov/odot/business/procurement/pages/bidaward.aspx • ODOT Traffic Control Plans Unit www.oregon.gov/ODOT/Enqineerinq/Paqes/Work-Zone.aspx • ODOT Traffic Standards www.oregon.gov/ODOT/Engineering/Pages/Signals.aspx 2026/WO 378 Special Provisions-4 Revised 02-04-2022 Conformed to Bid Documents • Oregon Legislative Counsel www.oreqonlegislature.gov/Ic • Oregon Secretary of State: State Archives sos.oregon.gov/archives/Pages/default.aspx 00110.10 Abbreviations-Add the following abbreviations to the list: LS - Lump Sum SQYD - Square Yard SQFT - Square Foot LOCOM- Lake Oswego Communications Center 00110.20 Definitions-Add the following definitions to this subsection: Design Engineer—The Design Engineer is Consor North America, Inc. &Wallis Engineering. General Conditions—General Conditions for Construction for the City of Lake Oswego. Project Manager—The Project Manager is the City of Lake Oswego. Section 00120—Bidding Requirements and Procedures Comply with Section 00120 of the General Conditions modified as follows: 00120.01 Receipt of Bids; Opening -Add the following: Bids shall be submitted by ELECTRONIC MEANS ONLY and must be received up to the Bid Closing Time. To submit electronic(PDF)bids,a bidder must accurately complete the required fields and upload bid forms at: www.ci.oswego.or.us/formslf/BI Dupload?BME=sbroadus@lakeoswego.city&BCD=04/21/2026 Once submitted, the Bidder will receive an automated email confirmation. Bidder may also verify receipt by phone: 503.635.0267 Bids will not be accepted after the Bid closing time 2:00 p.m.April 21, 2026. Bidders are encouraged to submit bids early. Because the City's estimate of the contract value is$100,000 or greater, Bidders must submit a First Tier Subcontractor Disclosure Form, provided in the Bid Documents,to the City no later than 4:30 p.m. local time on the date for receipt of the Bids. The First Tier Subcontractor Disclosure Form shall be submitted electronically to the same link as the Bid. 00120.02 Prequalification of Bidders-Add the following: Special minimum experience qualifications apply to portions of this project. Qualification of the Bidder for the project scope of work is a requirement for this project. Only Bidders who submit the required Supplemental Qualification Statement and determined by the Owner to meet the qualification requirements may be considered. Bidders are considered qualified to perform the work by having completed at least two (2)contracts in the past ten (10)years consisting of similar size and scope, meaning containing all of the elements of the Scope of Work proposed. SCOPE OF WORK:Approximately 9,500 lineal feet of asphalt roadway rehabilitation paving with associated curbs, sidewalk, curb ramps, storm sewer,waterline, signing,striping, and signal modifications. Since the special minimum experience qualifications apply,the three(3)apparent low Bidders determined at the Bid Closing Time must submit a Supplemental Qualifications Statement, provided in the Bid Documents, to the City no later than 4:00 pm local time,two (2)days following the date for receipt of Bids. 2026/WO 378 Special Provisions-5 Revised 02-04-2022 Conformed to Bid Documents Classes of work for which the Contractor(or Contractor in combination with the proposed subcontractor)must be prequalified are listed below: • Earthwork and Drainage (Inlets) • Asphaltic Concrete Paving and Oiling (Paving) • Curbs and Sidewalks • Signing and Pavement Markings • Electrical • Other-Water Lines • Etc. The Agency will confirm the prequalification status of Contractor and any proposed subcontractor after bid closing Bidders are considered qualified to perform the work by having completed at least two(2)contracts in the past ten (10)years consisting of similar size and scope, meaning containing all of the elements of the Scope of Work proposed. 00120.03 Request for Solicitation Documents-Add the following: The Contract Documents may be reviewed, examined, by: • Electronic: To download the Contract Documents, and to receive all notifications, addenda, and view the Planholder's list, a person or company must create an account and add its individual name or company to the Planholder's list at www.ci.oswecio.or.us/bids. If you have website questions concerning this invitation,please call Cindy Waggener at 503.635.0289. Copies of the Oregon Standard Specifications are available for download or purchase at: https://www.oregon.gov/odot/Business/Specs/2024 STANDARD SPECIFICATIONS.pdf. 00120.04 Pre-Bid Meeting-Add the following: A Mandatory Pre-Bid Conference will be held at 2:00 p.m., local time on Wednesday, April 8th 2026. Bids will be accepted only from Bidders attending the Mandatory Pre-Bid Conference. If a Bid is submitted by a Bidder having not attended the Mandatory Pre-Bid Conference, it will not be accepted and will be returned unopened. Interested bidders may attend by: • In-person only: City Hall 380 A Ave, Lake Oswego, OR 97034— Ponderosa conference room. If a bidder has accessibility concerns, please contact the Project Manager at least four(4) business days prior to the meeting. Prospective Bidders will be given the opportunity to ask questions relating to any details involved in the performance of the work under the Contract. Information distributed,statements made,or responses given to questions by the Agency's representatives at the Pre- Bid Conference will not in any way alter or affect any of the provisions contained in the Solicitation Documents or Contract requirements and will not be binding upon the Agency unless confirmed by Addenda. 00120.25 Subsurface Investigations-Add the following to the first paragraph: The report of geologic investigations is included in Appendix A — Geotechnical Data Report entitled Pavement Evaluation— City of Lake Oswego 2026-2030 Pavement Management Program: 2026 Paving Design Project by GRI dated March 20, 2026. 00120.40(f) Good Faith Requirement: Divisions Of Work The following Divisions of Work("DOW")have been selected for this project. Bidders may search for subcontractors certified through the State's Certification Management System (COBID)at https://oregon4biz.diversitysoftware.com/FrontEnd/SearchCertifiedDirectory.asp?XID=2315&TN=oregon4biz by using 2026/WO 378 Special Provisions-6 Revised 02-04-2022 Conformed to Bid Documents the National Institute of Governmental Purchasing (NIGP)codes. Bidders may also identify potential subcontractors certified by COBID by searching COBID certified suppliers and firms registered with the Certification Office for Business Inclusion and Diversity at https://oregon4biz.diversitysoftware.com/FrontEnd/SearchCertified Directory.asp?XI D=2315&TN=oregon4biz. The NIGP Codes selected below are unique to this project: NIGP Codes/Work Description 91395 Asphalt Paving 91345 Sewer,Water&Storm Drain Work 91219 Clearing/Grubbing/Mowing/Brushing 91276 Striping 91382 Concrete Cutting 92586 Surveying 91430 Concrete Work 96884 Traffic Control Services 91240 Demolition 96880 Traffic Sign Installation/Removal 91438 Electrical 91244 Excavating 91223 Grading Section 00130—Award and Execution of Contract Comply with Section 00130 of the General Conditions. 2026/WO 378 Special Provisions-7 Revised 02-04-2022 Conformed to Bid Documents Section 00140—Scope of Work Comply with Section 00140 of the General Conditions. Section 00150—Control of Work Comply with Section 00150 of the General Conditions modified as follows: 00150.15(a) Agency Responsibilities—Add the following sentence to the end of this subsection: The Engineer will perform all responsibilities described in the Construction Surveying Manual for Contractors, Chapter 1.5(see Section 00305). 00150.15(b) Contractor Responsibilities—delete this subsection: Consor-Agency to perform survey, contractor to request survey from Consor. 00150.35 Submittals, (c)Shop Drawings and Product Submittals, (6)-Add the following: Engineer's cost for submittal review beyond the first resubmittal shall be as follow: • City Project Manager-$200 per hour • City Inspector-$135_per hour • Design Engineer-$150 per hour Contractor shall reimburse the Agency for such costs. 00150.50(a) General—Add the following paragraph to the end of this subsection: The locations, depth and description of existing utilities shown were compiled from available GIS mapping, records and/or field observations. The Engineer or Utility Companies do not guarantee the accuracy or the completeness of such locations. Additional utilities may exist in the project area. 00150.50 Cooperation with Utilities-Add the following: 00150.50(f) Utility Information: There are no anticipated conflicts with the Utilities listed below. Minor adjustments of manholes, or boxes may need to be adjusted to finish grade by the Utility owner and the Contractor shall coordinate this work to be completed during construction. The Contractor shall contact those Utilities having buried facilities and request that they locate and mark them for their protection prior to construction. Additionally, the Contractor shall notify all utility owners which may be affected by the construction operation at least 48 hours in advance when their services may be affected by the work, and coordinate with affected utilities as necessary. It is the Contractor's responsibility to adjust utility structures and maintain adequate access to those utilities (in the judgement of the Engineer)regardless of cooperation (or lack thereof)from affected utilities. Utility Contact Person's Name and Phone Number 1. Sanitary Sewer,Water, Storm Sewer Daniel Payne, 503-675-3998 City of Lake Oswego 2. Lumen "Fiber" Travis-503.416.1507 3. Ziply Fiber Rui Wu, 971-990-7269 2026/WO 378 Special Provisions-8 Revised 02-04-2022 Conformed to Bid Documents 4. Clackamas Broadband Exchange(CBX) Duke Dexter, 503-721-6663 5. Comcast-"Cable" Matt Bravo, 503-351-9311 6. Crown Castle—"Cable" Ben Davis,206-336-7389 7. Integra Telecom/Zayo Group—"Cable" Brian Davidson, 360-907-5528 8. Lake Grove Water District—"Water" Bruce Goldson, PE, 503-481-8822 9. NW Natural Gas—"Gas" Ryan Winfree-503.610.7765, Steve Monier, 217-741-4403 10. Portland General Electric-"Power" Rick Eisenblatter, 503-612-6698 11.Astound John Gaylord, 503-302-3441 12. City of Tigard Water—"Water" Aaron Beattie, 503-718-2591 13.Verizon Wireless-"Telecommunication Company" Daniel Ruiz, 503-350-3251 14. Trimet—"Public Transportation" Shirley Block, 503-661-8117 15. Republic Services—"Waste Collection" Frank Lonergan, 503-636-3011 16. Clean Water Services Chris Faulkner, 831-214-2320 17.AT&T Corp Terrance Walker, 360-606-7318 The Contractor shall notify Northwest Natural Gas, in writing,with a copy to the Engineer,at least 15 Calendar Days before beginning Work within 10 feet of a high-pressure gas pipeline. An on-site safety watcher will be required, at no cost to the Contractor. In the event of an emergency, and in addition to the calls required by the Utilities notification system, the Contractor shall call: • Northwest Natural Gas 1-800-882-3377. 00150.55 Cooperation with Other Contractors-Add the following to the end of this subsection: The following contract work will be ongoing within the Project site during the following times: Estimated Times Contract Name (From -To) Bonita Road Paving Project(Clackamas County CI-3-26410) July 2026—August 2026 Jon Sparks, 503-964-4522 00150.60 Construction Equipment Restrictions, (a) Load and Speed Restrictions for Construction Vehicle and Equipment- Add the following bullet to the end of the bullet list: • The Contractor shall follow approved truck routes when hauling all materials and equipment beyond the limits of the Project Site. The proposed truck routes to be used by the Contractor shall be submitted to the Engineer for review and approval prior to the start of work. 00150.70 Detrimental Operations-Add the following to the end of this subsection: 2026/WO 378 Special Provisions-9 Revised 02-04-2022 Conformed to Bid Documents Portions of this project will be constructed in close proximity to existing private improvements.All private improvements and parking/staging areas used for the project disturbed by the Contractor's operations shall be repaired or replace to equal of better conditions at the Contractor's expense. Section 00160—Source of Materials Comply with Section 00160 of the General Conditions modified as follows: 00160.20 Preference for Materials, (a) Buy America—Add the following sentence to the end of this subsection: Federal highway or other federal funds are not involved on the project. 00160.30 Agency-Furnished Materials-Add the following paragraph to the end of this subsection: The Agency will furnish: • Project Information signs for use under Section 00220 • Door hangers for use under 00220.03 • Water Valve Can lids per 00490(34 Total)only Lake Oswego for City WATER • PSST Sign Supports per 00905(5 Total) • Extended range radar detection unit and associated equipment(9 total) • Stop bar radar detection unit and associated equipment(18 total) • Radar detection mount(27 total) • SDLC cable(25 feet) • Cabinet interface unit(5 total) • Mounting shelf and hardware kit(5 total) • Radar control cable(7,000 feet) • Audible pedestrian signal pushbuttons(36 total) Items will be made available for pick-up from Lake Oswego Public Works at 17601 Pilkington Road, Lake Oswego, Oregon 97035. Coordinate pick-up with the Dan Payne at dpayne(c�ci.oswego.or.us. Section 00165—Quality of Materials Comply with Section 00165 of the General Conditions modified as follows: Add the following subsection: 00165.02 Testing by Contractor-The Contractor is responsible for providing quality control testing in accordance with the ODOT Manual of Field Test Procedures per Section 00165.10, including sampling and testing,furnishing material of the quality specified, and furnishing QL levels during aggregate production. The Contractor's Quality Control technician must perform or observe the sampling operations. Testing operations will be performed by a Certified Technician. The Certified Technician performing the sampling and testing procedures must sign the testing documentation. Copies of testing reports shall be provided to the Project Manager. 00165.03 Testing by Agency-Add the following to the end of this subsection: The Agency may provide additional quality assurance testing in accordance with ODOT Manual of Field Test Procedures per Section 00165.10.. Areas showing failing compaction results shall receive further attention without undue delay by Contractor. Further attention may involve additional compaction efforts,other compaction methods, removal and recompaction of material or removal and replacement of material as required to obtain passing results. 2026/WO 378 Special Provisions-10 Revised 02-04-2022 Conformed to Bid Documents All additional Agency testing costs as a result of failing tests shall be borne entirely by the Contractor. All associated costs arising from any necessary additional work due to failing compaction test results, nor shall Contractor be entitled to a claim for the delay. Including removal and replacement of material, shall be borne by the Contractor. Any subsequent settlement of any backfilled area during the Correction Period shall be considered to be the result of improper compaction and shall be promptly corrected by the Contractor at no cost to the Agency. 00165.04 Costs of Testing-Add the following: The Contractor shall conduct source-review tests of aggregates, asphaltic concrete and concrete for submittal to and approval by the Agency. 00165.30 Field-Tested Materials-Add the following subsections: (b) Contractor's Duties—The Contractor shall: • Furnish Materials of the quality specified in the Contract. • Provide and administer a quality control program as described in the Quality Assurance Program portion of the MFTP. Upon request, the Contractor shall provide the Engineer the names, telephone numbers, and copies of certifications for all personnel performing field testing; and • Perform other testing as required by the Contract. (c) Types of Tests—The types of tests and testing methods generally required are described in the MFTP. Section 00170—Legal Relations and Responsibilities Comply with Section 00170 of the General Conditions modified as follows: 00170.02 Permits, Licenses,and Taxes-Add the following paragraph and bullets to the end of this subsection: The following permits are summarized for the Contractor's convenience, but not guaranteed to be an exhaustive list of all applicable permits: • City of Lake Oswego Traffic Control Permit per Section 00221 • City of Lake Oswego Erosion Control Permit per Section 00280. 00170.05 Assignment of Antitrust Rights-Replace the bullet that reads"ORS 646.725;and"with the following bullet: • ORS 646.725; or 00170.65 Minimum Wage and Overtime Rates for Public Works Projects, (e) Additional Requirements When Federal Funds are Involved -Add the following sentence to the end of this subsection: Federal funds are not involved in the Project. 00170.70 Insurance, (a) Insurance Coverages-Add the following table to the end of this subsection: In the second paragraph of the sub-section titled Commercial Automobile Liability with Pollution Coverage, delete the first sentence which reads in part"Commercial Automobile Liability with Pollution coverage is required for this Project..." Amend to include the following information, coverages and requirements: 2026/WO 378 Special Provisions-11 Revised 02-04-2022 Conformed to Bid Documents Required Type of Insurance Minimum Coverage City named as Additional Insured Yes Comprehensive general or $2,000,000 per occurrence and Yes, and also commercial general $3,000,000 in the aggregate Consor North liability America,Inc&Wallis Property Damage (XCU Engineering as coverage) (incl. in liability additional insured. insurance) Products — On-going and Completed Operations (inc. in liability insurance)* Yes Pollution Yes Contractor's Pollution Liability(CPL)** No Contractor's Endorsement for Lead No Pollution endorsement for Asbestos Yes Transportation Pollution Liability (TPL) endorsement** No Protection and Indemnity $2 million per accident US L&H $1 million per person per accident No Builders All Risk Yes Limit per Person Medical $5,000 minimum Expense Yes Fire Legal Liability $500,000 Yes Automobile liability $2,000,000 per accident- (owned, hired, & non- combined single limit or owned) $2,000,000 bodily injury and $1,000,000 property damage Yes Workers Compensation Statutory Coverage No Employer's Liability $1,000,000 (incl. in Worker Comp. insurance) * Additional insured coverage by endorsement shall be for on-going operations via ISO Form CG 2010 or its equivalent, and products and completed operations via ISO Form CG 2037 or its equivalent. Waiver of Subrogation endorsement via ISO form CTG 2404 or its equivalent shall be provided. ** If Contractor's Pollution Liability coverage is required by these Special Provisions, such coverage shall also include a Transportation Pollution Liability endorsement that also extends coverage for damages or pollution conditions arising out of the ownership, maintenance, use or the entrustment to others of any auto owned or operated, rented or loaned to the Contractor. 00170.70 Insurance, (e)Additional Insured-Add the following to the end of this subsection: Additional insured coverage under Contractor's Commercial General Liability and Excess Liability Policy(ies)as applicable,will be provided by endorsement. Additional insured coverage shall be for on-going operations via ISO Form CG 2010 or its equivalent, and products and completed operations via ISO Form CG 2037 or its equivalent. Waiver of Subrogation endorsement via ISO form CG 2404 or its equivalent shall be provided. Include Consor North America, Inc. &Wallis Engineering as additional insured. 2026/WO 378 Special Provisions-12 Revised 02-04-2022 Conformed to Bid Documents Additional insured coverage under Contractor's Commercial General Liability and Excess Liability Policy (ies) as applicable,will be provided by endorsement. Add the following subsection: 00170.77 Third Party Property Improvements-Add the following subsection: The Contractor shall not enter into any agreements with third party property owners within the project limits,or perform any work for these property owners,without written authorization from the Agency. Section 00180—Prosecution and Progress Comply with Section 00180 of the General Conditions modified as follows: 00180.20 Subcontracting Limitations, (a)General -Add the following to the end of this subsection: The Contractor's own organization shall perform Work amounting to at least 30%of the original Contract Amount. 00180.40 Limitations of Operations, (a) In General-Add the following to the end of this subsection: Work hours shall be as indicated below: • Normal construction hours: • 9am to 3pm unless otherwise noted. • Grinding and paving: M-F&s; 8pm to 5am unless otherwise noted • Ada, signal,waterline: M-F; 7am to 6pm unless otherwise noted • Pavement markings: M-F; daytime 9am-3pm; nights 8pm-5am All times noted are local time. Any variations in allowed work hours shall be subject to approval in writing by the Engineer. Work is prohibited on the holidays listed below, unless approved in writing by the Engineer: • New Year's Day(January 1) • Memorial Day(last Monday of May) • Juneteenth Day(June 19) • Independence Day(July 4) • Labor Day(first Monday of September) • Thanksgiving Day and the following Friday and Saturday • Christmas Day(December 25) • Monday when New Year's or Christmas fall on the preceding Sunday • Friday when New Year's or Christmas falls on the succeeding Saturday. • Friday afternoon preceding a Monday holiday 00180.40(b) On-Site Work-Add the following bullets to the end of the bullet list: • Distribute supplied project information signs a minimum of one week in advance of construction activities. • Deliver supplied door hanger notifications 48 hours to 72 hours before traffic is significantly impacted. Add the following subsection: 2026/WO 378 Special Provisions-13 Revised 02-04-2022 Conformed to Bid Documents 00180.40(c) Specific Limitations- Limitations of operations specified in these Special Provisions include, but are not limited to, the following: Limitations Subsection Cooperation with Utilities 00150.50 Cooperation with Other Contractors 00150.55 On-Site Work 00180.40(b) Contract Completion Time 00180.50(h) Traffic Lane Restrictions 00220.40(e) Special Events 00220.40(e) Maintenance Under Traffic 00620.43 00180.41 Project Work Schedules-After the paragraph that begins"One of the following Type..."add the following: In addition to the"look ahead"Project Work schedule, a Type B schedule as detailed in the Standard Specifications is required on this Contract. The Contractor shall obtain Agency approval of the work schedule a minimum of 7 days in advance of any street closures indicating the date work is planned for each closure. Should rescheduling become necessary, no work shall be done until the Agency approves the revised schedule and residents are provided notice with adequate time before the work commences. Prior to performing each specific work task,the Contractor is required to inform the Agency's inspector specifically what tasks will be performed and precisely when and where those tasks will be performed. Work performed without providing advance notice to the Agency's inspector may be rejected for failure to provide advance notice, even if no other reason is documented for such rejection. Add the following subsection: 00180.41(i) Customer Service Element to Construction Schedule—Construction will be executed with the highest level of customer service. Critical to that effort is planning of work sequence to minimize disruption and inconvenience to residents and commuter traffic. As a supplemental document to the Contractor's construction schedule,the Contractor shall submit, prior to the pre-construction conference, a plan to the Engineer that identifies: construction sequencing and timing, expected disruptions to residents, and a public safety plan that explains procedures on how the Contractor will maintain safe continuous ingress and egress for pedestrians and vehicular traffic including personal use by residents, mail and newspaper delivery, garbage collection and other daily deliveries, as applicable. 00180.42 Preconstruction Conference-Add the following to the end of this subsection: The Contractor is required to contact the Agency to schedule the preconstruction conference. In addition to the Contractor, the intended project superintendents,foremen, subcontractor foremen and major suppliers—those who will be involved in construction activities—should attend the preconstruction conference. The Contractor must be prepared for a thorough discussion and review, as well as revision,which may be deemed necessary in the opinion of the Engineer,of the following: Major subcontractors to attend: electrical, concrete, utility crew, ac paving; in addition to prime contractor. (Note: These materials SHALL be brought to the preconstruction conference for discussion followed by Engineer review. Some items may also require submittal in advance of the preconstruction meeting per the specifications.) 2026/WO 378 Special Provisions-14 Revised 02-04-2022 Conformed to Bid Documents • Contractor's plan of operation and progress schedule(3+copies) • List of 24-hour emergency phone numbers for the project manager,site foreman,and traffic control supervisor • List of subcontractors, names,addresses and phone numbers • List of quality control subcontractor(s), name(s), address(s)and phone number(s) • List of materials fabricated or manufactured off the project • Material sources for the project • Names of principal suppliers • Detailed equipment list • "Project Labor List"for all employee classifications anticipated to be used on the project • Cost percentage breakdown for lump sum bid item(s) • Shop drawings(bring preliminary list) • Traffic Control Plans-electronic is acceptable • Erosion and Sediment Control Plan -electronic is acceptable • Pollution Control Plan -electronic is acceptable • Proposed site for waste material disposal and any necessary permits required for placing this material • Proposed truck haul route During the preconstruction conference, be prepared to discuss the following items: • Bonds and Insurance • Weekly project meetings—schedule and responsibilities • Provision for inspection for materials from outside sources • Responsibility for locating utilities—Contractor to manage utility coordination • Responsibility for damage • Time schedule for relocations, if by other than Contractor(coordinate with utilities) • Compliance with Contract Documents • Hours of work • Acceptance and approval of work • Labor compliance, payrolls, and certifications • Safety regulations for Contractor's and Owner's employees and representatives • Suspension of work,time extensions • Change order procedures • Progress estimates—procedures for payment • Special requirements of funding agencies • Construction engineering,advance notice of special work • Any interpretation of the Contract Documents requested by the Contractor • Any conflicts or omissions in the Contract Documents • Any other problems or questions concerning the work • Processing and administration of public complaints • Rights-of-way, Easements and Temporary Construction Easements • Submittal for approval; to pm • Testing results;copy to Project Manager • Three week schedule updates to Project Manager • Rfi's to Project Manager • Traffic control, pedestrian control—24 hr contact 00180.44 Project Meetings-Add the following 00180.44 Project Meetings, (g) Progress Meetings - Replace the second subsection that begins, "(2) Attend regularly scheduled bi-weekly...",with the following subsection: (2)Attend regularly scheduled weekly progress meetings conducted by the Project Manager. Add the following subsection: (9) Discuss neighbor impacts and maintaining access, mail service, garbage collection and other services to private properties impacted by construction. School buses, Parks&Rec activities. 2026/WO 378 Special Provisions-15 Revised 02-04-2022 Conformed to Bid Documents 00180.44 Project Meetings, Pre-Event Meetings - Replace this subsection, except for the subsection number and title,with the following: The Contractor shall prepare for and attend the following: (1)A traffic control meeting per Section 00221. (2)An asphalt pre-paving conference per Section 00744. (3)A concrete preplacement conference per Section 00759. (4) Pre-stripe meeting (5)Signals and radar w/Clackamas County (6)Survey—meeting 00180.50 Contract Time to Complete Work, (a) General-Add the following to the end of this subsection: Project Substantial Completion shall be September 26, 2026. Project Final Completion shall be 20 days from Engineer's notification to Contractor of Substantial Completion. Project Milestone Completions shall be: • Signalized Intersections:Traffic Signal Radar detection installation shall be substantially complete prior to any traffic signal impacts requiring vehicle detection downtime or timing/phasing modifications. Including ADA corners. • Traffic Signal Radar detection at the Bonita Road and Bangy Road intersection shall be substantially complete by July 1st, 2026. Prior to traffic signal impacts requiring detection downtime and before the Bonita Road Paving Project CI-3-26410 per section 00150. • Project work on Hallmark Drive,Collins Way&Douglas Way shall be substantially complete by July 31st,2026. • Project work on Indian Creek Drive shall be substantially complete by August 28th, 2026. 00180.85 Failure to Complete on Time; Liquidated Damages, (b) Liquidated Damages-Add the following to the end of this subsection: The amount of liquidated damages shall be as indicated below for not meeting the following Contract Times: • Substantial Completion - $500 per Calendar Day that expires after the time specified for Substantial Completion plus any extension thereof until the Work is determined to be substantially complete (Second Notification)by the Agency. • Final Completion—After Substantial Completion,$1,500 per Calendar Day that expires after the time specified for Final Completion plus any extension thereof until the Work is determined to be finally complete (Third Notification) by the Agency. • Milestone Completion-$1,500 per Calendar Day that expires after the time specified for Milestone Completion plus any extension thereof until the Work is determined to have met the Milestone Completion by the Agency. Add the following subsection: 00180.85(c) Lane Closures-Lane closures beyond the limits specified will inconvenience the traveling public and will be a cost to the Agency. 2026/WO 378 Special Provisions-16 Revised 02-04-2022 Conformed to Bid Documents Section 00190—Measurement of Pay Quantities Comply with Section 00190 of the General Conditions modified as follows: 00190.20 Contractor to Provide Vehicle Weigh Scales, (f) Contractor-Provided Weigh Technician, (2) Scale Without Automatic Printer-Add the following paragraph after the paragraph that begins,"If the scales require manual entry...": Pay costs for the weigh witness at that person's contract billing rate. Just need tickets with pay qty at point of supply. 00190.20 Contractor to Provide Vehicle Weigh Scales,(g)Agency-Provided Weigh Technician-Add the following paragraph to the end of this subsection: Section 00195—Payment Comply with Section 00195 of the General Conditions modified as follows: 00195.10 Payment For Changes in Materials Costs - Replace this subsection, except for the subsection number and title,with the following: For this Contract, an Asphalt Cement Material Price Escalation/De-escalation Clause IS NOT in effect. PART 00200—TEMPORARY FEATURES AND APPURTENANCES Section 00205—Field Laboratory,Weighhouse, Etc. Delete Section in its entirety. Section 00210—Mobilization 00210.00 Scope—Add the following to the subsection: • Obtaining required bonds, insurance, permits and licenses. • Preparing and submitting shop drawings, "as-built"drawings and other submittals. • Removing equipment and extra materials from site upon completion of Work. • All other work not identified in a separate bid items. Section 00220—Accommodation for Public Traffic Comply with Section 00220 of the Standard Specifications modified as follows: Add the following subsection: 2026/WO 378 Special Provisions-17 Revised 02-04-2022 Conformed to Bid Documents 00220.01(d) Terminology-According to 00110.05(a),for the purposes of this Contract,the terms"sidewalk ramp" and "sidewalk ramps"shall respectively refer to and shall be read to mean"curb ramp"and"curb ramps". 00220.02 Public Safety and Mobility— In the eighth "bulletized" item, add the following between the words "TCD" and "as shown": "as required in this subsection,and" 00220.02(a) General Requirements—Replace the bulleted item that begins, "Do not stop or hold vehicles...",with the following: • Do not stop or hold vehicles for more than 10 minutes. Replace the bulleted item that begins, "Do not block driveways...",with the following: • Provide and maintain in a safe condition temporary access to all residence driveways, temporary intersections, and temporary connections with roads, streets, bikeways, sidewalks and foot paths throughout the life of the project. Communicate with all adjacent properties 48 hours in advance of any work affecting access to allow necessary arrangements to take place between the property owner,Agency, and Contractor. Communications shall be in the form of written text, verbal communication or other means and shall be documented by the Contractor and that documentation shall be available to the Agency. Unless specifically agreed upon in writing by the property owners, no closure to property access may occur during the contract. Add the following bullets to the end of the bullet list: • When performing trench excavation or other excavation across or adjacent to a Traffic Lane on a roadway having a pre-construction posted speed greater than 35 mph, backfill the excavation, install surfacing, and open the roadway to traffic by the end of each work shift. • When an abrupt edge is created by excavation, protect traffic according to the "Excavation Abrupt Edge" and the "Typical Abrupt Edge Delineation"configurations shown on the Standard Drawings. • Manage all employee and subcontractor parking. Contractor shall relocate employee and subcontractor parking areas to address complaints from residential and commercial properties. The Contractor shall specifically encourage employee and subcontractor parking within the right-of-way. Contractor shall document parking areas prior to construction according to Section 00210.41 and restore areas to their pre-construction condition if damaged during the project according to Section 00150.70. Add the following: All streets shall remain open to traffic throughout construction unless otherwise described in subsection 00220.40(e) or 00220.40(f). The Contractor must obtain the Engineer's approval of a traffic control and signage plan for each street on which traffic will be disrupted at least 7 days before work on that street begins,shall implement the plan before occupying any portion of the street,and shall maintain traffic control in accordance with that plan, or as otherwise directed by the Engineer,for the duration of the work.Apply for TCP—electronically naming:WO378 CIP, Dan Payne listed as Project Manager The amount of time that a roadway is left unstriped must be minimized or temp marking upon engineers approval until Permanent striping must be replaced on the roadway as soon as feasible; a maximum of 10 calendar days after construction activities removes or covers roadway striping. The amount of time that a roadway is left with a rough surface from pavement grinding must be minimized. Pavement overlays must be constructed as soon as feasible; Contractor should plan to pave within 48 hours after pavement taper/wedge grinding. For Kruse Way and Bangy Road,traffic is allowed on ground pavement for up to 24 hours with related street sweeping activities required. 2026/WO 378 Special Provisions-18 Revised 02-04-2022 Conformed to Bid Documents Street sweeping required prior to allowing vehicular traffic on ground surface at the end of the shift. Street sweeper must also be available within 4hr call out or remain onsite while vehicles are being allowed on the ground surface. Do not place work zone signs or supports that will block existing walkways or bikeways unless otherwise approved by the Engineer. The Engineer and/or inspector may order immediate stoppage of work and restoration of normal traffic patterns at any time if, in their judgment,such action is necessary to reduce excessive delays and/or protect public safety. Coordinate with TriMet to minimize impacts and delays for transit routes. 00220.02(b) Temporary Pedestrian Accessible Route Plan—Add the following bullets to the end of the bullet list: • TPARs with appropriate signing will be required for all curb ramp corners on Bangy Road, Kruse Way,and Hallmark Drive as communicated through the Plans. Maximum closure time for any ramp location is two weeks. Multiple corners may be approved by project manager for intersection corners needing additional requirements see the following: o Kruse Way at Westlake Drive: Closure of the westbound right lane on Kruse Way is allowed for 5 calendar working days. During closure, route pedestrians to cross Westlake Drive at southern parking lot entrance,Temporary walks shall be provided at the NW corner of the Kruse Way at Westlake for pedestrians to cross Kruse Way. o Bangy Road at Meadows Road: Closure of the NW and SW corners to pedestrians is allowed. These corners cannot be closed simultaneously. Reroute pedestrian traffic to cross Bangy Road at the nearest legal intersection crossing. o Bangy Road at Bonita Road: Closure of the SW corner is allowed. Close the eastbound thru lane and combine the thru, left-turn,and right-turn vehicular movements for eastbound traffic. 00220.03(b) Closures-Add the following bullet to the end of the bullet list: • On Street Parking—Request should be a minimum of seven (7)calendar days before closing on-street parking. After receiving written approval, provide 48 hours'public notification before limiting the on-street parking. 00220.03 Work Zone Notifications, (c) Public Notifications—Add the following to the end of this subsection: The City shall furnish temporary project information signs. The Contractor shall install project signs on Type II barricade supports at each street end or entry point on which the Contractor will be working to notify residents and street users of the specific schedule for work on that street. Signs shall be placed a minimum of 7 days before any work affecting use of the street. Contractor shall fill in the type of work and dates with removal tape in the blanks provided. The Agency will provide door-hangers for the Contractor to add schedule information. The Contractor shall deliver door-hanger notifications to properties surrounding the streets to be paved. The Agency will provide a map showing the specific properties where door hangers are to be hung. Door-hangers shall be marked with the dates and times that the street and/or its traffic would be significantly affected. Door-hangers shall be delivered 48 to 72 hours before traffic would be significantly impacted on that street. In the event of a significant schedule change, door-hangers shall be redelivered with the revised work dates/times 24 hours before significant street impacts. Work may be not allowed if timely notification has not been provided. Notify emergency services and organizations listed below at least 10 calendar days in advance of street closures. The following information is provided for the contractor's convenience: • Emergency Services 911 • City of Lake Oswego Police Department(Non-Emergency) 503-635-0238 • City of Lake Oswego Fire Department(Non-Emergency) 503-635-0275 • United States Post Office(Non-Emergency& Emergency Services) 800-275-8777 • Lake Oswego School District 503-534-2000 2026/WO 378 Special Provisions-19 Revised 02-04-2022 Conformed to Bid Documents • TriMet 503-661-8117 • Republic Disposal 503-636-3011 Provide a minimum 48-business hours notification prior to any signal shutoff or road closure. A notification shall also be provided once the signal is turned back on, or road re-opened. The Contractor shall notify the following services/organizations within this LOCOM notification (confirm the list below): • Director of Special Projects-sbroadus@ci.oswego.or.us • City Construction Manager—dpayne@ci.oswego.or.us • Assistant City Engineer—wfarley@ci.oswego.or.us • Events Supervisor—sburgess@ci.oswego.or.us • Chief of Police—gburke@ci.oswego.or.us • Lake Oswego Communications Manager(LOCOM) Manager—tburgess@ci.oswego.or.us • LO Police/Traffic—police-traffic@ci.oswego.or.us • Fire Marshal—mamos@ci.oswego.or.us 00220.40 General Requirements, (d)Adjacent to Excavations— In the first"bulletized" item, delete the words "as shown on the Standard Drawings". 00220.40 General Requirements, (e) Lane Restrictions,(1)Closed Lanes— Replace this subsection, except for the subsection number and title,with the following: Allowable work hours and lane closures are as follows:Work on ADA 7am-6pm if working in dedicated turn lane or thru lane closure, check with Project Manager for specifics. • Kruse Oaks Drive& Bangy Road (Bonita Road to Burma Road): o Single lane closure (in either direction) allowed Monday through Friday 9:00am to 3:00pm and Saturday 7:00am to 6:00pm. Day work activities allowed for all other work except mainline grinding and paving, as allowed. Single lane closure (in either direction) allowed Monday through Friday 8:00pm to 5:00am and Saturday 8:00pm to 7:00am. • Bangy Road (Kruse Way to Bonita Road): o Single lane closure (in either direction) allowed Monday through Friday 9:00am to 3:00pm and Saturday 7:00am to 6:00pm. Day work activities allowed for all other work except mainline grinding and paving, as allowed. Single lane closure (in either direction) allowed Monday through Friday 8:00pm to 5:00am and Saturday 8:00pm to 7:00am. Traffic may be shifted into median to allow closure of two side-by-side lanes.When shifting lanes into the existing median, provide a flagger at each end of the lane shift. Night work required for mainline grinding and paving activities. Flaggers are required at signalized intersections when a Temporary Pedestrian Diversion Plan is implemented to direct pedestrians through the work area and to activate the pedestrian signal as necessary. • Kruse Way Kruse at West Lake—close WB Kruse for ADA work: o Single lane closure (in either direction) allowed Monday through Friday 9:00am to 3:00pm and Saturday 7:00am to 6:00pm. Day work activities allowed for all other work except mainline grinding and paving, as allowed. Single lane closure (in either direction) allowed Monday through Friday 8:00pm to 5:00am and Saturday 8:00pm to 7:00am. Night work required for mainline grinding and paving activities. Flaggers are required at signalized intersections when a Temporary Pedestrian Diversion Plan is implemented to direct pedestrians through the work area and to activate the pedestrian signal as necessary. • Hallmark Drive, Collins Way, &Douglas Way: o Full closure of roadway is allowed.When road closure is in effect,only two of the 3 three streets may be closed at one time and not Douglas Way/Collins Way at the same time. Hallmark Drive stage closure around 15455 Hallmark Drive driveway to maintain access. Local access must be maintained to all properties throughout construction.AC paving may require up to 2 hours closure for top lift paving. The Engineer reserves the right to impose additional lane restrictions depending on observed traffic conditions. The Engineer and/or inspector may order immediate stoppage of work and restoration of normal traffic patterns at any time if, in their judgment,such action is necessary to reduce excessive delays and/or protect public safety. Add the following to the subsection: 2026/WO 378 Special Provisions-20 Revised 02-04-2022 Conformed to Bid Documents Traffic Control Plans will likely have certain restrictions that may affect the timing of Work. Road classifications are determined by the City's Transportation System Plan. Work on Major or Minor Arterials, may be restricted to 9 AM to 3 PM, weekdays; or night Work may be allowed, as approved by the Engineer. Events-Add the following to the end of this subsection. The following special events will occur during this Project: • Sunday Market: Sunday's on Hallmark Drive beginning August 2nd, 2026 • Concerts in the Park(Westlake Park):Wednesday Evenings in August 00220.40 General Requirements, (f)Traffic and Access Constraints, Restrictions and Requirements— Traffic and Access Constraints (1) Limited Duration Road Closure Add the following to this section: Kruse Oaks Drive and Hallmark Drive shall not be fully opened to traffic until top lift paving has occurred. Kruse Way (westbound right lane only)at Westlake Drive is allowed to be closed for 10 calendar working days. Hallmark Drive from Collins Way to Mercantile Drive is allowed to be closed for the duration of waterline installation. Hallmark Drive, Collins Way, and Douglas are allowed to be closed. Local access must be maintained for 15455 Hallmark Drive. Only two of these three streets may be closed simultaneously. 00220.70 Opening Sections To Traffic— In the second paragraph, delete the phrase "except watering ordered to protect the work or to alleviate dust will be paid as provided in Section 00340". Section 00221 —Common Provisions For Work Zone Traffic Control Comply with Section 00221 of the Standard Specifications modified as follows: 00221.00 Scope-Delete the phrase"according to the standard drawings,the traffic control plan(TCP)for the Project, these Specifications,or as directed"and replace with the phrase"traffic control plan (TCP)for the Project submitted by the Contractor and accepted by the Agency,these Specifications,or as directed". Furnish all permits required for Work under this section from the City of Lake Oswego per Section 00170.02. 00221.02 General Requirements—Add the following paragraphs to the end of this subsection: The Contractor is reminded of their responsibility to provide a clear zone for their crews to work in. This may necessitate temporary'no parking'signage,conversations with neighbors about removing objects or vehicles obstructing the work area, etc. The Contractor shall obtain the Engineer's approval of all signage and communication methods to be used for this project. Notify the Engineer and/or inspector of any non-cooperative neighbors at least 24 hours before work would be affected. The Contractor is reminded it is their responsibility to protect their work from damage caused by traffic or other factors, especially when the sealant is setting or drying. Damaged crack seal or slurry seal shall be repaired by the contractor at no cost to the City, and the contractor is reminded of their responsibility for damage to vehicles in such cases. 2026/WO 378 Special Provisions-21 Revised 02-04-2022 Conformed to Bid Documents 00221.06 Traffic Control Plan—Replace this subsection, except for the subsection number and title,with the following: 00221.06(b)Contractor Modified Traffic Control Plan Delete the text of the subsection in its entirety and replace with the following: The Contractor shall submit a proposed TCP prepared for the Agency's review and acceptance at least 14 days prior to start of any construction. The proposed TCP shall address all operational aspects of the Contractor's work,and shall include provisions for areas used by the Contractor for staging and storage of materials and equipment. The proposed TCP shall include order and duration of the TCP, all TCMs, TCDs, lane and street closures, and detours. If additional modifications are proposed by the Contractor to the Contractor's TCP as accepted by the Agency,submit modifications prepared by an engineer currently licensed in Oregon at least 7 days before beginning the construction activities that require the TCP changes. The following parameters shall apply to the Contractor's Traffic Control Plan: • Constraints, restrictions and coordination requirements as per 00220.40(e)(1), 00220.40(e)(2)(b) and 00220.40(f). • Curb ramp design checklists meeting the requirements of ODOT. • Traffic control shall be designed to move traffic past the area smoothly, with proper and adequate advance signing. Wherever the existing roadway surface is disturbed by construction and except where temporary paving is required, the Contractor shall regularly grade and maintain a smooth gravel surface for vehicular traffic traveling through and within the project area until the project is complete. Following acceptance of the proposed TCP by the Engineer, the Contractor shall follow the Agency's standard procedure for obtaining a TCP permit via the link below: https://www.ci.oswego.or.us/FormsLF/TTCPApplication 00221.07(c)(1) Paving-Replace this subsection, except subsection number and title,with the following: When the longitudinal joint is greater than 1 inch in height, install additional TCD according to 00221.03. Complete the placing of ACP and construction of paving joints according to 00735.48, 00735.49, 00743.45, 00744.44, 00744.45, 00745.47, and 00745.48,as applicable. Add the following subsection: 00221.08 Traffic Control Meeting-All personnel who will directly supervise the traffic control must attend the traffic control meeting per Section 00180.44(k). Contractor to produce and distribute meeting minutes within seven (7)days following the meeting. Section 00222—Temporary Traffic Control Signs Comply with Section 00222 of the Standard Specifications modified as follows: 00222.10(a) Temporary Signs-Add the following bullet(s)to the end of the bullet list: • Seven Calendar Days before closing the sidewalks, place a"SIDEWALK CLOSED, Full Time"(CW11-4) sign in advance of each future closure point. Locate the sign so it is legible from the nearest alternate pedestrian pathway facing incoming pedestrian traffic. The sign may be mounted between the panels of a Type II barricade or on a single-post TSS. Do not place the sign or sign support such that it narrows the pedestrian pathway to a width of less than 4 feet. 2026/WO 378 Special Provisions-22 Revised 02-04-2022 Conformed to Bid Documents • Before opening the TPAR, place TPAR signing and other TCM as shown, or as directed. Maintain the "SIDEWALK CLOSED, Full Time" (CW11-4)signs while the TPAR is open to pedestrian traffic. • Install an 18 by 24-inch "NO PARKING" (R8-3a)sign in every block where on-street parking is prohibited, facing incoming traffic. • When construction requires bicycles to use the Traffic Lanes, install a "Bicycle ON ROADWAY" (CW11-1) symbol sign on 1/2 mile spacing through the affected area. Keep the signs in place until completion of the Shoulder or bikeway final surface. 00222.15(b) Portable Changeable Message Signs-Add the following paragraph to the end of this subsection: Furnish and operate four(4) PCMS and verify location with the Inspector prior to placement. Place PCMS on streets 7 days in advance of any lane closure and maintain the signs until all work is completed within the work zone. PCMS shall be set-up onsite within 24-hours, if requested by Agency and be available for the duration of the project. Section 00223—Work Zone Traffic Control Labor And Vehicles Comply with Section 00223 of the Standard Specifications modified as follows: Add the following subsections: 00223.22 Flagger Station Lighting -Add the following bullet to the end of the bullet list: • In addition to the products listed on the QPL, tripod mounted or cart mounted flagger station lights that were purchased on or before January 1,2014 and that were on the QPL before January 1,2014 may also be used. Provide proof of the original purchase date to the Engineer. 00223.31(a) Traffic Control Supervisor-- Replace the sentence that begins"In the event of a Work Zone..."with the following sentence: When the bid schedule does not include an item for a TCS, appoint a trained person on the Project Site during workhours and on call at all other times who is not a laborer,operator or foreman and who: • Meets the requirements of 00225.31. • Inspects and maintains TCD location, operation, quality,cleanliness, and effectiveness. • Is equipped with a cellular telephone. • Is equipped with a two-way radio,when necessary. • Has the authority to assign and control flagging operations. • Has filed their name and phone number with the Engineer and local police. • Notifies the Engineer of any corrective measures made to the TCP if the TCP is not functioning as required, or to accommodate site conditions. Maintain the original intent of the TCP. 00223.90 Payment-Add the following to the end of this subsection: Payment for item (a) includes all Equipment, labor, and Incidentals necessary to complete the Work as specified for Railroad Flagger Services. No separate payment will be made for this work,as it is considered incidental to other work on this project. Section 00270—Temporary Fences Comply with Section 00270 of the Standard Specifications as modified: 00270.10 Material—Replace the sentence that begins"Provide new Material..."with the following paragraph: 2026/WO 378 Special Provisions-23 Revised 02-04-2022 Conformed to Bid Documents Provide new Material meeting the requirements of 01050.10. Used Materials in like new condition may be provided if approved. See 00270.70. 00270.40 Construction—Replace the first sentence that begins"Construct temporary fences, gates..."with the following paragraph: Construct temporary fences according to the City of Lake Oswego requirements,applicable parts of Section 01050,and as shown.Temporary chain link fence is shown on the plans generally coincident with the circumference of each tree's critical root zone, modified for applicable right-of- way or construction restrictions. If temporary chain link fence installation shown is limited by pre-made fence panel widths, install fence to encapsulate the critical root zone. Furnish and install temporary chain link fence appurtenances, including panel connections and footing support system. Attach a sign approved by the City of Lake Oswego to all fencing at intervals of every 3rd fence panel/section. 00270.80 Measurement—Replace the first paragraph of this subsection that begins"The quantities of temporary fence...",with the following paragraph: The quantities of temporary fence will be measured on the length basis of each type of temporary fence. Measurement of temporary chain link fence will be made using the protected tree's critical root zone circumference. No measurement will be made for plastic mesh fencing. 00270.90 Payment—Add the following sentence to the end of this subsection: No separate or additional payment will be made for installing tree protection signage, or moving or adjusting temporary chain link fence. Section 00280—Erosion and Sediment Control 00280.00 Scope—Add the following to the subsection: The Agency has applied for an Oregon NPDES 1200-C Permit and the accompanying Erosion and Sedimentation Control Plan (ESCP) prepared by the Agency for areas to be disturbed is included in the Supplemental Drawings. Through submittal of Action Plans for approval,the Contractor may prepare revisions to best illustrate the Contractor's planned ESC BMPs at each location within the Project that requires an Action Plan.The ESCP and Action Plans identify BMP's to prevent contamination of stormwater and includes the elements specified in Schedule A of the 1200-C PERMIT, and discuss management of non-stormwater sources (i.e., landscaping irrigation, pipe flushing, street washing and dewatering)as per the requirements of the 1200-C PERMIT.The Contractor shall submit the Action Plans to the Agency for submittal to Oregon DEQ. Any comments from DEQ to the Action Plans will be returned to the Contractor for response and Action Plan updating,in a timely manner,prior to resubmittal to DEQ and ultimate approval. The ESCP and Action Plans shall be approved by DEQ prior to initiation of ground disturbing activities.The Contractor shall be responsible for full implementation of the ESCP and Action Plans and shall take proper actions to prevent contaminants, including sediment,from entering the storm drain system or otherwise being conveyed to Waters of the State. Take immediate corrective action if directed by the Agency or Engineer, or if the Contractor observes contaminants, including sediment entering the storm drain system. (a) Notify the Agency of the need to prepare additional Action Plans to amend the ESCP, whenever there is a change in construction activities or operations that may affect the discharge of significant quantities or pollutants to surface waters,ground waters,storm drainage systems.The ESCP shall be amended via Action Plans if the ESCP is in violation of conditions of the 1200-C PERMIT, or has not effectively achieved the objective of reducing pollutants in stormwater discharges. Add the following to the end of the is subsection: Following acceptance of the proposed Erosion and Sediment Control Plan by the Engineer,the Contractor shall follow the Agency's standard procedure for obtaining an ESCP permit via the link below: https://www.ci.oswecio.or.usfformslf/ErosionControlApp The Contractor shall furnish an Erosion Control Permit from the City of Lake Oswego. 2026/WO 378 Special Provisions-24 Revised 02-04-2022 Conformed to Bid Documents 00280.05 Erosion and Sediment Control Plan on Non-Agency Controlled Lands- In the last sentence of the first paragraph,delete"before"and replace with "after". 00280.06 Erosion and Sediment Control Manager-Delete this subsection 00280.16(i) Concrete Washout-Delete the bullet that begins"Geotextile-Type 2 drainage...". 00280.62 Inspection and Monitoring- Replace this subsection, except for the subsection number and title,with the following: Inspect the Project Site and all ESC devices for potential erosion or sediment movement on a weekly basis and when 1/2 inch or more of rainfall occurs within a 24-hour period, including weekends and holidays. If a significant noncompliance or serious water quality issue occurs that could endanger health or the environment, verbally report it to the Engineer within 24 hours. 00280.90 Payment-- In the paragraph that begins"Item (a)includes..."delete the bullet that specifies"providing the Erosion and Sediment Control Manager". Replace the paragraph that begins"When only Item (a)is..."with the following paragraph: When only item (a)is listed in the Contract Schedule of Items, additional ESC devices required for permit compliance will be paid for as Extra Work according to Section 00196. Section 00290—Environmental Protection Comply with Section 00290 of the Standard Specifications modified as follows: 00290.32 Noise Control—Delete the first"bullet"and replace with the following: The Contractor shall comply with all requirements regarding noise control, in accordance with City of Lake Oswego Code 34.10.539 and Clackamas County Code 6.05. 00290.36(a) Migratory Birds-Add the following paragraphs to the end of this subsection: Bird management performed activities to comply with the Migratory Bird Treaty Act(16 U.S.C. 703 712)will be by the City of Lake Oswego and its permitted agents, as documented in the City of Lake Oswego MBTA Permit, Section K. Ensure that the City of Lake Oswego and its permitted agents have access to the project area, as needed to prevent migratory bird nesting. Nesting prevention may include daily bird harassment and the installation and maintenance of devices that exclude birds. Do not disturb migratory bird nesting habitat(shrubs,trees, and structures), or clear vegetation from March 1 to September 1 of each year without prior written approval from the Engineer. Notify the Engineer, in writing, a minimum of 10 calendar days prior to starting activities that could harm nesting birds. 00290.90 Payment—Replace this subsection, except for the subsection number and title,with the following: No separate payment will be made for this work, as it is considered incidental to other work on this project. 2026/WO 378 Special Provisions-25 Revised 02-04-2022 Conformed to Bid Documents PART 00300 -ROADWORK Section 00305—Construction Survey Work Comply with Section 00305 of the Standard Specifications modified as follows: 00305.00 Scope—Survey staking will be required for curb ramp construction. The Consultant shall develop and make all detail surveys necessary for layout and construction. Complete all survey staking as needed using information contained in the plans and adjusted as necessary to meet ADA requirements. Surveyed field layout shall be reviewed by the Engineer prior to demolition and again prior to concrete placement. AGENCY TO Provide construction survey work according to the current edition on the date of Advertisement,of the ODOT"Construction Surveying Manual for Contractors"(CSMC). This manual is available on the web at: http://www.oregon.gov/ODOT/ETA/Documents_Geometronics/Construction-Survey-Manual-Contractors.pdf Provide line and grade verification according to Chapter 8 of the ODOT CSMC when directed by the Engineer. Add the following subsection: 00305.02 As-Built Survey Work- Add the following: Contractor will provide post-construction as-built stormwater&waterline survey services described as follows: • Field locate the horizontal location and rim elevations of all constructed stormwater catch basins. • Complete measure downs within the above constructed facilities to determine as-constructed invert elevations, pipe material, and pipe diameter for pipes entering and exiting the structures including sump elevations. • Field locate the horizontal location and rim elevations of all existing catch basins within the street rehabilitation limits. • Complete measure downs within the above existing stormwater catch basins to determine existing invert elevations, pipe material, and pipe diameter for pipes entering and exiting the structures including sump elevations. This activity does not include existing stormwater/sewer manholes, and is focused on the stormwater catch basins/inlets within the streets receiving rehabilitation paving. Contractor shall provide all obtained as-built stormwater survey information within an AutoCAD (2019 or newer) file. The vertical datum for this survey is NGVD29.The basis of bearings for this survey is based on observations using the Oregon real-time GNSS network(orgn).The horizontal datum: NAD 83_2011,state plane coordinates(Oregon north zone 3601)distances shown hereon are ground distances. 00305.90 Payment—Add the following paragraph to the end of this section: The accepted as-built survey work in Section 00305.02 will be paid for at the contract lump sum amount for the item "As-Built Survey Work". 2026/WO 378 Special Provisions-26 Revised 02-04-2022 Conformed to Bid Documents Section 00310—Removal Of Structures And Obstructions Comply with Section 00310 of the Standard Specifications modified as follows: Add the following subsection: 00310.46 Excavation of Existing Surfaces—Remove sidewalk and surfacings as shown on the Plans. Sidewalk and surfacings to be removed shall be cut in neat, straight lines with vertical edges along the limits of removal. The cut lines for removal of asphaltic or cement concrete pavement shall be reviewed and approved by the Engineer in the field before cutting. Demolish and remove concrete curbs, islands and other surfacings as directed by the Engineer or as shown. Make a vertical saw cut between any existing curb that is to remain and portion that is to be removed. Remove roadway pavement and aggregate base in the street adjacent to curbs and islands as shown on the Plan or as directed by the Engineer6 00310.90 Payment-Add the following paragraph to the end of this subsection. No separate or additional payment will be made for removal or disposal Work included in Section 00330 according to 00310.02. 00310.92 Separate Item Basis-Replace the sentence that begins, "Item (d)includes..."with the following: Item (d)includes all work associated with curb ramp removal including but not limited to saw cutting, removal of existing asphalt, aggregate base,curbs, islands, sidewalks and other surfacings to the limits and grades shown on the plans. Section 00320—Clearing and Grubbing 00320.40 Clearing Operations, (b) Preserving Vegetation and Other Natural Materials,(3)Trees to be Saved Delete the first paragraph and replace with the following: Existing trees and tree limbs or significant shrubs whether on public right-of-way,public property or private property are not to be removed or trimmed without an approved tree protection plan and permit, pursuant to Lake Oswego Code (LOC)Chapter 55. When trees are to be saved, the engineer will identify and mark them in accordance with the plan and permit. Section 00331 —Subgrade Stabilization 00331.10 Materials-Subgrade Stabilization material shall be imported crushed rock with a maximum size of 3 inches, free from dirt, clay balls and organic material,with less than 8 percent passing the No. 200 sieve. Section 00350—Geosynthetic Installation Comply with Section 00350 of the Standard Specifications. 2026/WO 378 Special Provisions-27 Revised 02-04-2022 Conformed to Bid Documents PART 00400—DRAINAGE AND SEWERS Section 00405—Trench Excavation, Bedding, and Backfill Comply with Section 00405 of the Standard Specifications. Section 00440—Commercial Grade Concrete Comply with Section 00440 of the Standard Specifications modified as follows: Add the following subsection: 00440.01 Terminology-According to 00110.05(a),for the purposes of this Contract,the terms"sidewalk ramp"and "sidewalk ramps"shall respectively refer to and shall be read to mean "curb ramp"and "curb ramps". 00440.40(b) Placing -Add the following bullet to the end of the bullet list: When haul time or placement conditions warrant exceeding the time of discharge, submit a detailed breakdown of the estimated time needed from batching to discharge of a load along with the measures that will be taken to ensure slump, temperature and uniformity will be maintained. Submit in advance to establish a new time limit at the Engineer's discretion. Section 00470—Manholes, Catch Basins,And Inlets Comply with Section 00470 of the Standard Specifications modified as follows: 00470.01 Cast-in-Place and Precast Construction—Replace the second sentence with the following sentence: Concrete inlets and siphon boxes shall be cast-in-place. Pre-cast inlets are also acceptable. 00470.42 Precast Concrete Catch Basins and Inlets-Add the following sentence to the end of this subsection: Grade adjustments using a bolt system from the QPL is allowed. 00470.90 Payment-Add the following: Add the following pay items to the pay item list: Pay Item Unit of Measurement (I) Snout and Oil Debris Stop Each Add the following paragraphs: Payment for items within this section shall include the supply and installation of all ancillary fittings as shown,for the Snout&Oil Debris Stops and sumps require 2ft min sump if possible. Payment also includes removal of the existing inlet, curb and gutter,and any curb height transitions within the inlet pay limits necessary to complete the Work. Payment for item (i)will be payment in full for furnishing all equipment, labor, and incidentals necessary to set the new monument box in the location identified by the City's surveyor including all coordination necessary to establish the location. Add the following bullet to the bullet list: 2026/WO 378 Special Provisions-28 Revised 02-04-2022 Conformed to Bid Documents Restoring the surrounding roadway pavement section beyond what is paid for under 00640 and 00744. Section 00490—Work On Existing Sewers And Structures Comply with Section 00490 of the Standard Specifications modified as follows: 00490.01 Descriptive Terms—Supplement the definition of adjust with the following: When activities necessitate paving over existing manholes, place building paper over structure lid prior to placing tack and remove/clean any asphalt from the lid following the paving activities. Manholes that are paved over must be uncovered within 14 calendar days. Adjusting structures(manhole rims,valves, boxes, and catch basins)shall also include hand removal of existing asphalt pavement around the structure as required to overlay or inlay the proposed pavement section. Sawcut for the minor adjustment of manholes shall be a circle cut. Adjusting inlets shall also include additional work associated with maintaining or revising the finish grade surrounding the catch basins to maintain or provide positive drainage. 00490.40 General—Supplement this section with the following: Where shown, boxes to be adjusted shall be made parallel or perpendicular(as applicable)to the proposed roadway curbing and sidewalk scoring unless approved otherwise by the Engineer. 00490.48 Adjusting Boxes, Cleanout Lids and Similar Structures—Add the following to the end of this subsection: A pre-construction monument survey was performed by the Engineer's surveyor prior to construction. Multiple survey monuments may be present throughout the project areas, located outside monument boxes. The Contractor shall protect all monuments from damage to the maximum extent feasible and install new boxes,where shown in the Plans. Including installing new monument boxes over existing monument pins located within the roadway that do not have an existing box. The Contractor shall be responsible for installing monument boxes at the exact horizontal location of any monument that has been disturbed. The Engineer's surveyor will reset the horizontal and vertical location of monuments that are disturbed after construction. Coordination with the Engineer's surveyor and protection of existing monuments shall be incidental to other work under this project. 00490.90 Payment:Add the following: Add the following pay items to the pay item list: Pay Item Unit of Measurement (j) Remove and Replace Valve Boxes Each (k) Concrete Monument Box Each (I) Replace Concrete Water Meter Box Each Modify this section as follows: Delete pay item(h). No separate or additional payment will be made for filling abandoned structures. Filling abandoned structures is considered incidental to Section 00310. Add the following to the end of this subsection: Item (e)includes all extra or additional costs necessary to remove existing concrete from the existing catch basin as necessary to adjust the structures and fully adjust the catch basin. Add the following to the end of this subsection: 2026/WO 378 Special Provisions-29 Revised 02-04-2022 Conformed to Bid Documents Item (j)includes removing the existing valve box and installing a new water valve box that meets City of Lake Oswego standards as specified in the plans. Valve boxes shall be installed in accordance with Standard Detail W6- 01 —Typical Valve Box. Item (k)includes removing existing monument boxes and furnishing and installing a new monument box in the same location as the existing box or furnishing and installing a new monument box over an existing monument to complete the work as approved by the Engineer. Coordination with the Engineer's surveyor and protection of existing monuments shall be incidental to other bid items and will not be paid separately under this bid item. Item (I)applies to Nicor Read-Rite polymer water box lid (B12NLGRYWATSIGthN9)and Armorcast polymer concrete meter box(A6000485SA)shown in Standard Detail W1-01A. Section 00495-Trench Resurfacing Comply with Section 00495 of the Standard Specifications. PART 00600—BASES Section 00610—Reconditioning Existing Roadway Comply with Section 00610 of the Standard Specifications modified as follows: 00610.80 Measurement- Replace this subsection, except for the subsection number and title,with the following: The quantities for Reconditioning will be measured on an area basis. Measurement will be the finished surface, limited to the Neat Lines shown or directed. 00610.90 Payment- Delete the paragraph that starts"Payment for reconditioning and preparation Work and replace with "Payment for reconditioning and preparation Work will be made on an area basis for"Reconditioning Existing Roadway—. Delete the paragraph, "Removal and disposal of Unsuitable Materials will be paid for according to 00140.30". Section 00620-Cold Plane Pavement Removal Comply with Section 00620 of the Standard Specifications modified as follows: 00620.00 Scope—Add the following to the end of the subsection: The plans show preliminary locations of pavement removal and grind/inlay areas. The engineer may modify these areas by marking the existing pavement to show the final locations of pavement removal and grind/inlay areas. The depth of edge grind across driveway drops shall be 2"unless otherwise shown on the plans or directed by the engineer. 00620.40(a) General-Replace this subsection, except for the subsection number and title,with the following: 2026/WO 378 Special Provisions-30 Revised 02-04-2022 Conformed to Bid Documents Remove the existing pavement to the depth,width, grade and cross section shown or as directed. The use of a heating device to soften the pavement is not allowed. 00620.43 Maintenance Under Traffic- Replace this subsection, except for the subsection number and title,with the following: Traffic is not allowed on consistent depth cold planed surfaces for Hallmark Drive and Kruse Oaks Drive. Before opening the area to traffic, pave the surface according to 00744. Traffic will be allowed on tapered cold planed surfaces (e.g. 0-2 inch taper/wedge grinds)for up to 48 hours after removing the existing surface. Sweep and clean the cold planed surface before opening to traffic. Traffic will be allowed on the cold planed surface up to 1 Calendar Day after removing the existing surface on Bangy Road and Kruse Way. Sweep and clean the cold planed surface before opening to traffic. Before beginning paving operations, make repairs to the existing cold planed surface as directed. Payment for the repairs will be made according to 00195.20.Add the following subsection: 00620.44 Cold Planing Operations The Contractor shall coordinate the work limits with the Engineer. The Engineer must approve the limits prior to the Contractor beginning the work. All edges remaining after cold plane pavement removal shall be vertical to accept the succeeding full depth asphalt lift. Vertical edges left at the edge of the grinding drum are acceptable. Rounded edges where the face of the grinding drum is terminated are not allowed. Rounded edges shall be ground vertical by rotating the grinding machine. Where rounded edges cannot otherwise be ground vertical as part of the cold plane removal operations, saw cut edges and remove pavement according to Section 00310. Section 00641 —Aggregate Subbase, Base and Shoulder 00641.10 Materials,(a) Base and Shoulder Aggregate-Base rock aggregate shall be 1"-0 or Y4"-0 in accordance with Section 02630, Table 02630-1. 00641.44 Shaping and Compacting, (a) Aggregate Base Courses, (1) Dense-graded Aggregates - Delete "95 percent of the maximum density"and replace with "95% relative density per ASTM D1557(AASHTO T-180)". Section 00730—Emulsified Asphalt Tack Coat Comply with Section 00730 of the Standard Specifications modified as follows: 00730.11 Emulsified Asphalt-In the paragraph that begins"Obtain samples according to AASHTO T 40..." replace the words"AASHTO T 40"with the words"AASHTO R 66". 00730.22 Asphalt Distributor—Add the following to the end of this subsection: Apply emulsified asphalt material to vertical surfaces(curb faces,catch basin faces, butt joints,etc.). Avoid excess tack coat overspray being applied to vertical surfaces. Shields protecting vertical faces shall be provided and used during tacking operations. All overspray shall be promptly removed. 00730.44 Applying Tack Coat—Replace the sentence beginning with"Apply the emulsified asphalt..."with the following sentence: 2026/WO 378 Special Provisions-31 Revised 02-04-2022 Conformed to Bid Documents Apply the emulsified asphalt to the prepared surface at a rate between 0.08 and 0.20 gallons per square yard as directed and with the emulsified asphalt temperature between 140 °F and 185 °F as recommend by the manufacturer. Additional application of tack may be required,as directed by the Inspector,to obtain the necessary residual asphalt. 00730.90 Payment- Replace this subsection,except for the subsection number and title,with the following: No separate or additional payment will be made for Emulsified Asphalt tack coat.Approximately Tons of Emulsified Asphalt in tack coat will be required on this Project. Section 00744—Asphalt Cement Pavement Replace Section 00744 of the Standard Specifications with the following Section 00744. 00744.00 Scope—Replace this subsection with the following: This work consists of constructing asphalt concrete pavement(ACP)to the lines, grades,thicknesses, and cross sections shown or established. Where shown,work shall include furnishing all materials, equipment, labor, and incidentals for mixing aramid fiber into ACP,when aramid fiber is required as a mixture ingredient.The fiber reinforced ACP will be subject to all requirements for ACP in this Section. 00744.01 Abbreviations: HMAC - Hot Mix Asphalt Concrete MDT - Maximum Density Test RAM - Recycled Asphalt Material TSR - Tensile Strength Ratio VFA - Voids Filled with Asphalt VMA - Voids in Mineral Aggregate WMAC - Warm Mix Asphalt Concrete 00744.02 Definitions: Asphalt Concrete Pavement-Uniformly coated mixture of asphalt cement, graded Aggregate, and additives as required. The use of ACP in this section refers to either hot mix or warm mix asphalt concrete. Hot Mix Asphalt Concrete-A hot plant mixed ACP. Level 2 ACP-ACP for use in applications with low traffic volumes and low volume truck traffic. Level 2 not used. Level 3 ACP-ACP for use in applications exposed to moderate truck traffic. Recycled Asphalt Material-The combination of reclaimed asphalt Pavement(RAP)and recycled asphalt shingles (RAS). Warm Mix Asphalt Concrete-An asphalt concrete mix following all requirements of HMAC, except that through use of approved additives or processes, it is mixed, placed, and compacted at lower temperatures. Forta-Fi Reinforcing Fibers-ACP with Forta-Fi fibers mixed in. 00744.03 Quality Control Plan—Submit a comprehensive and project specific paving quality control plan for approval. Submit a draft Quality Control Plan prior to the Pre-paving Conference and re-submit the Quality Control Plan for approval based on comments received at the Pre-paving Conference. The plan shall include, but not limited to, a brief narrative addressing each of the following items: 2026/WO 378 Special Provisions-32 Revised 02-04-2022 Conformed to Bid Documents • List of personnel to be used meeting the requirements of 00744.30, including: • Contractor • Mix Supplier • Mix Design Technicians • QC Officer • Backup QC Officer • Plant Technicians • Density Technicians • Source of all materials • Trucking plan that ensures continuous paving operation. • Sampling and testing plan meeting the requirements of 00744.10, 00744.11, 00744.16 and 00744.50. • JMF meeting the requirements of 00744.12, 00744.13 and 00744.14. • List of equipment to be used in the paving operation. • List of best management practices used during construction to ensure the specifications are met. Practices shall address the following items: • Subgrade and surface preparation • Utility adjustments(valve cans, manholes,etc.) • Tack • Temperature • Release agent(diesel not allowed) • Cleanout location for delivery trucks • Joint construction • Joint location • Segregation • Depth • Cross Slope • Roller pattern • Compaction • Smoothness • Correction of surface defects (segregation, separated joints,etc.) Materials 00744.05 Forta-Fi Reinforcing Fibers- Forta-Fi treated ACP shall be mixed and installed in accordance with the manufacturer's recommendations. 00744.10 Aggregate- Furnish new Aggregate, RAP Aggregate,and RAS Aggregate meeting the following requirements: (a) New Coarse and Fine Aggregates-Produce coarse and fine Aggregate from crushed Rock or other inert material of similar characteristics. Blend sand is allowed for Levels 1,2, and 3 mixes. Do not use more than 6 percent natural or uncrushed blend sand, by weight, in the total Aggregate. Provide a means of verifying and documenting the amount of blend sand added to the Aggregate. Provide test results showing Aggregates meet requirements for soundness, durability,fractured faces and harmful substances as described below. No sandstone, shale or other soft material will be allowed. (1) Soundness-Provide coarse and fine Aggregate with a weighted loss not exceeding 12 percent when subjected to five cycles of the soundness test using sodium sulfate solution according to AASHTO T 104. (2) Durability-Provide Aggregate not exceeding the following maximum values: 2026/WO 378 Special Provisions-33 Revised 02-04-2022 Conformed to Bid Documents Test Test Method Aggregates ODOT AASHTO Coarse Abrasion T 96 30.0% Degradation Passing No.20 sieve TM 208 30.0% Sediment Height TM 208 3.0" (3) Fractured Faces-Provide crushed Aggregate with not less than the minimum number of fractured faces as determined by AASHTO T 335 as follows: Percent of Fracture(by Weight) Material Retained on 1",3/4", 1/2" Material Retained and No.4 Sieve on No. 8 sieve Type of Mix (two fractured faces) (one fractured face) All ACP 75 75 (4) Harmful Substances- Do not exceed the following maximum values: Test Test Method Aggregates ODOT AASHTO Coarse Fine Lightweight pieces T 113 1.0% Wood Particles TM 225 0.10% Elongated Pieces TM 229 10.0% (at a ratio of 5:1) Plasticity Index T 90 0 or NP Sand Equivalent T 176 45 min. (b) Reclaimed Asphalt Pavement- RAP material used in the production of new ACP is optional. No more than 30 percent RAP material will be allowed in the new ACP Pavement. Use RAP Aggregates in the ACP that are no larger than the specified maximum allowable Aggregate size before entering the cold feed. Blend the RAP material with new Aggregate to provide a mixture conforming to the JMF within the tolerances specified. (c) Recycled Asphalt Shingles- RAS used in the production of new ACP is optional. Either manufacturer waste (post-manufacturer)RAS or tear-off(post-consumer)RAS may be used. Manufacturer waste RAS is processed asphalt shingle material derived from manufacturer's shingle scrap. Tear-off RAS is processed asphalt shingle 2026/WO 378 Special Provisions-34 Revised 02-04-2022 Conformed to Bid Documents material derived from shingle scrap removed from Structures. All percentages are based upon dry weights for calculations. (1) Processing Shingles-Process the RAS by grinding at ambient temperature so that 100 percent of the shredded pieces are less than 1/2 inch in any dimension and that 90 percent are less than 3/8 inch in any dimension when sampled according to AASHTO T 2 and tested according to AASHTO T 27. Sample and test the processed RAS for gradation at a frequency of one test for every 50 tons of RAS processed. (2) Harmful Substances-Certify that the RAS does not contain asbestos fibers according to the policies and procedures established by the Department of Environmental Quality. Test deleterious materials according to ODOT TM 335 at a frequency of one test for every 50 tons of RAS material. Limit the percentage of deleterious materials to 1.0 percent. If fine Aggregate is added as an anti-clumping agent, sample and test processed RAS for harmful substances before adding the fine Aggregates. (3) Anti-Clumping Additive-Fine Aggregate meeting the requirements of 00744.10(a)may be added to the RAS in a quantity not to exceed 4 percent by weight of RAS to keep the material workable and to prevent conglomeration of the shingle particles in the stockpile. Include these added fine Aggregates in the mix design. RAS may also be blended with RAP in controlled percentages to preclude clumping. Do not contaminate stockpiled RAS with dirt or other foreign materials. (4) Allowable Percentages-No more than 5.0 percent RAS by total weight of Aggregate is allowed in ACP mixtures. Restrict the maximum allowable percentage of asphalt binder replacement to 20.0 percent for Base Courses and 15.0 percent for wearing Courses in ACP containing only RAS. When RAS is used in conjunction with RAP, restrict the maximum allowable percentage of binder replacement to 30.0 percent for Base Courses and 25.0 percent for wearing Courses. (5) Establishing Mix Design Inputs- For ACP mixtures containing RAS or RAM,following any addition of fine Aggregate as an anti-clumping agent, test the material according to ODOT TM 319 to establish the asphalt content, material specific gravities,and gradation. Develop mixture designs according to the ODOT Contractor Mix Design Guidelines for Asphalt Concrete. Blend the RAS or RAM with new Aggregate to provide a mixture conforming to the JMF within the tolerances specified. 00744.11 Asphalt Cement and Additives-Furnish the following asphalt cement and additives: (a) Asphalt Cement- Use the grade of asphalt that is specified in the Contract Documents. Provide asphalt cement conforming to the requirement of ODOT's publication "Standard Specifications for Asphalt Materials". Copies of the publication are available from ODOT's website. The applicable Specifications are those contained in the current publication on the date the Project is advertised. (b) Asphalt Cement Additives- Use standard recognized asphalt cement additive products that are of known value for the intended purpose and approved for use on the basis of laboratory tests and capable of being thoroughly mixed. Do not use asphalt cement additives that have detrimental effects on the asphalt material. Do not use silicones as an additive. Add the following asphalt cement additives when required by the JMF: • Anti-stripping asphalt cement additives to prevent stripping or separation of asphalt coatings from Aggregates to satisfy the TSR specified in 00744.13. • Asphalt cement admixtures used to aid in the mixing or use of asphalt mixes or for experimental purposes. When WMAC is used, select one of the WMAC technologies and process and additive types identified on ODOT's publication "Approved WMAC Technologies". 2026/WO 378 Special Provisions-35 Revised 02-04-2022 Conformed to Bid Documents Submit the proposed WMAC technology to be used and a plan for its implementation at the pre-construction conference. Comply with the manufacturer's recommendations for incorporating additives and WMAC technologies into the mix. Comply with manufacturer's recommendations regarding receiving, storing, and delivering the additives. 00744.12 Mix Type and Broadband Limits- Furnish the mix type specified in the Contract Documents within the broadband limits according to following: (a) Mix Type- Furnish the types of ACP shown or as directed. When the Plans allow an option of two types for a Course of Pavement, use only one type throughout the Course. (b) Broadband Limits-Provide a JMF for the specified mix type within the control points listed below: 1/2"ACP 3/8"ACP 1/4"ACP Sieve Size Control Points Control Points Control Points (%passing (%passing (%passing by Weight) by Weight) by Weight) Min. Max. Min. Max. Min. Max. 3/4" 100 1/2" 90 100 100 3/8" - 90 90 100 100 1/4" - - - - - 90 No. 4 - - - 90 70 80 No. 8 28 58 32 67 40 65 No. 200 2.0 10.0 2.0 10.0 2.0 10.0 00744.13 Job Mix Formula Requirements (a) General -Do not begin production of ACP for use on the project until the Engineer reviews the JMF and provides written consent.Acceptance of the JMF through ODOT is not required.A new JMF is required if the asphalt cement performance grade or any additives change during production. Provide a JMF for the Project meeting the following criteria and that was either developed or verified within 3 years of the date the Contract and was used in another Contract within 1 year of the date the Contract was advertised: Level 2 Level 3 Design Method Superpave Superpave Compaction Level 65 Gyrations 80 Gyrations Air Voids, % 1/2 inch-3.5 1/2 inch-3.5 3/8 inch-4.0 3/8 inch-4.0 2026/WO 378 Special Provisions-36 Revised 02-04-2022 Conformed to Bid Documents 1/4 inch -4.0 1/4 inch -4.0 VMA, % minimum 1/2 inch - 14.0 1/2 inch - 14.0 3/8 inch - 15.0 3/8 inch - 15.0 1/4 inch - 15.0 1/4 inch - 15.0 VMA, % maximum min +2.0% min +2.0% 1/4 inch: min +3.0% 1/4 inch: min +3.0% P No. 200/Eff.AC ratio 0.8 to 1.6 0.8 to 1.6 TSR, % minimum 80 80 VFA, % 1/2 inch: 65-78 1/2 inch: 65-75 3/8 inch: 70-80 3/8 inch: 70-80 1/4 inch: 70-80 1/4 inch: 70—80 TSR 80% 80% Develop the JMF according to the ODOT Contractor Mix Design Guidelines for Asphalt Concrete; or verify according to the ODOT Mix Design Verification process. All Specification Section 00745 references in the ODOT Contractor Mix Design Guidelines for Asphalt Concrete shall be replaced with this project Special Provision Section 00744. Submit the proposed JMF and supporting data to the Engineer for review at least 10 Calendar Days before anticipated use. Submit all Mix Design Verification (MDV)data developed over the last year including air voids. If acceptable,written acceptance will be provided. Perform a new TSR if the source of the asphalt cement changes. (b) Performance Test-For Level 3 wearing Course mixes,the mix design submittal shall include the results of the performance testing as outlined in the latest ODOT Contractor Mix Design Guidelines for Asphalt Concrete in the mix design submittal. (c) Reclaimed Asphalt Material-Reclaimed Asphalt Material (RAP or RAS)material used in the production of ACP is optional. (d)Warm Mix Asphalt Concrete- Issue a separate JMF for WMAC. Do not use RAS in WMAC mixes with minimum compaction temperatures less than 260 °F. When WMAC is used, provide the following information in addition to the requirements listed for ACP: • WMAC technology and WMAC additives information. • WMAC technology manufacturer's established recommendations of usage. • WMAC technology manufacturer's established target rate for water and additives,the acceptable variation for production, and documentation showing the impact of excessive production variation. • WMAC technology material safety data sheets if applicable. • Temperature range for mixing. • Temperature range for compacting. • Except for foaming technology, asphalt binder performance grade test data of the asphalt binder and chemical additive at the manufacturer's recommended dosage rate. • Except for foaming technology,WMAC mixture performance test results. Perform testing for foaming technology on the production mix on specimens compacted at WMAC compaction temperatures. 2026/WO 378 Special Provisions-37 Revised 02-04-2022 Conformed to Bid Documents (e)Asphalt Cement Grade-Provide asphalt cement conforming to the requirement of ODOT's publication "Standard Specifications for Asphalt Materials." Provide a performance grade according to the following: Percent RAP Performance Grade 20 or less PG 64-22 more than 20 PG 64-28 (f)Additives—Use standard recognized asphalt cement additive products that are of known value for the intended purpose and approved for use on the basis of laboratory tests and capable of being thoroughly mixed. 00744.14 Tolerances and Limits- Produce and place ACP within the following JMF tolerances and limits: Gradation ACP Type Constituent 1/2" 3/8" 1/4" 1" 3/4" JMF±5%" 1/2" 90- 100% JMF±5%" 3/8" - 90- 100% JMF±5%" 1/4" JMF±5% JMF±5% 90- 100% No.4 JMF±5% JMF±5% JMF±5% No. 8 JMF±4% JMF±4% JMF±4% No. 30 JMF±4% JMF±4% JMF±4% No. 200 JMF±2.0% JMF±2.0% JMF±2.0% * Maximum not to exceed 100% Constituent of Mixture ACP All Types Asphalt Cement-AASHTO T 308 (Ignition)and ODOT JMF±0.50% TM 323 RAP Content-ODOT TM 321 JMF±2.0% RAS Content-ODOT TM 321 JMF± 1.0% RAM Content-ODOT TM 321 JMF±2.0% Moisture content at time of discharge from the mixing 0.80% max. plant-AASHTO T 329 When a JMF tolerance applies to a constituent,full tolerance will be given even if it exceeds the control points established in 00744.12(b). Full tolerance will be given for RAP, RAS, or RAM content even if it exceeds the limits established in 00744.10. 00744.16 General Testing Requirements (a) Laboratory Requirements—Furnish and maintain an ODOT certified QC laboratory. Furnish the laboratory with the necessary equipment and supplies for performing Contractor QC testing. Calibrate all testing equipment according to the required test methods. The Engineer may inspect measuring and testing devices to confirm both calibration and condition. The laboratory must be operational before beginning the ACP production and be equipped with a telephone or cellular telephone. Provide laboratory equipment meeting the requirements of the applicable test methods identified in these Specifications and selected for use on the Project. (b) Plant Calibration -Calibrate all meters and belt scales at the ACP mixing plant according to ODOT TM 322 before beginning production. 2026/WO 378 Special Provisions-38 Revised 02-04-2022 Conformed to Bid Documents (c)Sampling and Testing- For each 1,000 tons of placement, have a CAT I perform a minimum of one of each of the following test methods as modified in the MFTP: • Asphalt Content-AASHTO T 308 with ODOT TM 323 determined Calibration Factor • Gradation -AASHTO T 30 • Mix Moisture-AASHTO T 329 • Maximum Specific Gravity-AASHTO T 209 • Field Compacted Gyratory Specimens-ODOT TM 326 When less than 1,000 tons of mix is placed in a day, perform a minimum of one series of tests per day. Provide test results to the Engineer by the middle of the following work shift. Provide samples or split samples to the Engineer when requested. The Agency may elect to complete additional Quality Assurance testing at its discretion. 00744.17 Acceptance- If the test result for each mix gradation constituent, asphalt content, and density measurement is within the specification limits, the material will be accepted. If the asphalt content, one or more gradation constituents, or the density measurement are not within the specification limits, the material that is not within the specification limits will be accepted according to 00150.25. Equipment 00744.22 Addition of Forta-Fi Reinforcing Fiber-Add fiber product to the asphalt at the manufacturer's recommended dosage rate. A fiber supplier's representative shall be present onsite during ACP production mixing.This requirement may be waived by the Engineer if the fiber supplier and ACP producer can supply evidence of the supplier's fiber product being successfully produced by the ACP producer. 00744.23 Pavers- Provide pavers that are: • Self-contained, self-propelled, supported on tracks or wheels, none of which contact the mixture being placed. • Equipped with augers and a screed or strike-off assembly, heated if necessary,which: • Can spread and finish the ACP to a uniform texture, in the specified widths,thicknesses, lines, grades and Cross Sections. • Will not segregate, tear, shove or gouge the ACP. • Equipped with a paver control system which: • Controls the ACP placement to specified Slope and grade. • Maintains the paver screed in proper position. • Provides the specified results through mechanical sensors and sensor-directed devices actuated from independent line and grade control references. • Equipped with adequate lighting to illuminate the paver and the roadway in front of and behind the paver during the period from 30 minutes after sunset to 30 minutes before sunrise, or as directed. Shield lighting from adjacent traffic as necessary. Provide a minimum light level of 10 footcandles as measured by the Engineer on the roadway surface at a distance of 16 feet from the front and back edges of the paver. 00744.24 Compactors -Provide the specified self-propelled rollers capable of reversing without backlash, as follows: (a) Steel-Wheeled Rollers-Steel-wheeled rollers with a minimum gross static weight as follows: Level 2 Level 3 Breakdown and Intermediate 8 ton 10 ton Finish 6 ton 8 ton 2026/WO 378 Special Provisions-39 Revised 02-04-2022 Conformed to Bid Documents (b) Vibratory Rollers-Vibratory rollers that: •Are equipped with amplitude and frequency controls. •Are specifically designed to compact ACP. •Are Capable of at least 2000 vibrations per minute. Have a minimum gross static weight meeting the requirements of 00744.24(a). Do not operate in vibratory mode for lifts thinner than or equal to 1 inch for the type of ACP being compacted. If vibratory rollers are used for finish rolling, they shall: • Have a minimum gross static weight meeting the requirements of 00744.24(a). • Not be operated in the vibratory mode. (d) Illumination- Provide adequate lighting to illuminate each compactor and the roadway in front of and behind each compactor during the period 30 minutes after sunset to 30 minutes before sunrise, or as directed. Shield lighting from adjacent traffic as necessary. Provide a minimum light level of 10 foot candles as measured by the Engineer on the roadway surface at a distance of 60 feet from the front and back edges of each compactor. The use of equipment which crushes the aggregate to an appreciable extent will not be permitted. 00744.25 Trucks—Do not use vehicles or transfers with rear drop axles in which raising the drop axle would cause the vehicle to exceed legal load limits. Labor 00744.30 Quality Control Personnel- Provide technicians having CAgT, CAT-I, CAT-II, CDT, and CMDT technical certifications. Providing a reinforcing fiber product representative at each plant site when producing mixture for the Project unless plant submits a minimum of three examples of prior use of suppliers reinforcing fibers. Construction 00744.40 Season and Temperature Limitations-Place ACP when the temperature of the surface that is to be paved is not less than the temperature indicated: Nominal Compacted All Levels Level 2 Level 3 Thickness of Individual Lifts and Courses as shown on the typical section of the Travel Lane All Other plans All Courses Wearing Course Courses Surface From To From To From To Temperature* Inclusive Inclusive Inclusive Less than 2 inches 60°F All Year** 3/15 9/30 All Year** 2 inches-2 1/2 inches 50°F All Year** 3/15 9/30 All Year** Greater than 2 1/2 inches 40°F All Year** 3/15 9/30 All Year** Temporary 40°F All Year** All Year** All Year** * Do not use field burners or other devices to heat the Pavement surface to the specified minimum temperature. 2026/WO 378 Special Provisions-40 Revised 02-04-2022 Conformed to Bid Documents "" If placing ACP between March 15 and September 30,temperature requirement may be lowered 5°F. 00744.41 Pre-paving Conference—Hold a pre-paving conference with all Contractor supervisory personnel,all subcontractors who are to be involved in the paving work, and the Engineer. Meet at a mutually agreed time and discuss all methods of accomplishing all phase of the paving work. The Pre-paving Conference agenda will be prepared by the Agency and distributed to the Contractor prior to the conference. Contractor shall submit a draft Quality Control Plan per Section 00744.03 and a draft Traffic Control Plan per Section 00225 for discussion purposes at the Pre-paving Conference. Contractor shall revise the Quality Control Plan and Traffic Control Plan based on approvals obtained at the Pre-paving Conference. The conference shall address topics such as: • Contractor Key Paving Personnel • Quality Control Plan • Traffic Control Plan • Erosion Control Plan • Review of JMF(mix type(s), asphalt grade, mixing and placement temperatures, etc.) • Haul Vehicles(type and quantity,truck routes, haul distance,clean out areas, release agents, etc.) • Check weights and scales • Manhole and box adjustments • Tack spread rates and certifications, and tack application acceptance • Joint construction means and methods • Laboratory and equipment certifications • Review type of paver, grade control and panel widths, lift sizes and staging • Roller pattern for compaction • Smoothness testing by Contractor • ACP plant testing and compaction testing • Temporary striping 00744.42 Mixing Temperatures -Produce ACP within the temperature ranges recommended by the asphalt cement Supplier for the grade of asphalt being used on the Project. Establish the allowable mixing and placement temperature ranges by the JMF. Measure the mixture temperature at the discharge of the mixer. Measure the placement temperature behind the paver. The allowable production temperatures may be adjusted based on the asphalt cement Supplier's recommendation if approved by the Engineer. The maximum mixture temperature and the minimum placement temperature shall be as follows: Temperature, °F Type Maximum at Mixer Minimum Behind Paver HMAC 350 240 WMAC 275 215 Within the above limits,the Contractor with approval of the Engineer, or the Engineer may adjust this temperature in 10 °F increments from the JMF as follows: • Up- If the aggregate coating, moisture content,workability or compaction requirements are not attained. • Down - If the aggregate coating, moisture content,workability and compaction requirements are attained. 00744.43 Preparation of Underlying Surfaces-All valve boxes, monument boxes, manholes and catch basins shall be adjusted to finish grade in advance of or during the paving operation. No adjustments shall be made after the paving is completed unless approved by the Engineer prior to paving. Minimum paving ring size for manholes shall be two inches. Adjustments made for manhole slopes and/or less than two inches of grade increase shall require a frame adjustment. 2026/WO 378 Special Provisions-41 Revised 02-04-2022 Conformed to Bid Documents Any tree branches or foliage which will hinder the proper placement of the surfacing shall be removed by the Contractor by pruning and sealing the cut ends or tying back in a manner approved by the Engineer. The Contractor shall be responsible for trees damaged that are not properly pruned or tied back. All surfaces to be paved shall be swept clean by the Contractor no more than 24 hours in advance of paving. The Contractor shall remove vegetation prior to washing or sweeping. The Contractor shall use vacuum street sweepers that are self-propelled equipment with rotating brooms and brushes that are capable of loosening dirt and debris from the road surface. In those areas where dirt and debris cannot be removed with sweeping alone,washing of the surface will be required. Coordinate construction of driveway transitions with property owners to minimize disruption of access. 00744.44 Tack Coat-Construct a tack coat before placing each Lift of ACP according to Section 00730. A tack coat is not required before placing ACP on Aggregate Base. Treat all paved surfaces on and against which ACP is to be placed with an asphalt tack coat according to Section 00730. Before applying the tack coat, clean and dry the surface to be tacked. Remove all loose material that will reduce adhesion of the tack by brooming,flushing with water, or other approved methods. Avoid excess tack coat being applied to the concrete gutter or curb face. Shields protecting curb faces shall be provided and used during tacking of curb faces. Any tack coat inadvertently or inappropriately applied to the gutter or curb face shall be promptly removed. The Engineer may require additional tack coat placement as necessary to obtain the residual asphalt needed to ensure bond between lifts as specified. 00744.45 Hauling, Depositing, and Placing-Haul, deposit, and place ACP according to the following: (a) Hauling- Provide vehicles with tight,clean and smooth metal beds equipped with covers to protect against moisture and heat loss. Cover ACP if rain is encountered any time between loading and placement,for all night work, and when the duration between loading and delivery to the paver results in the temperature of the ACP delivered to the paver to be below the upper limit of the compaction temperature range noted in the JMF. ACP will be rejected before placing if one or more of the following occurs: • Placement temperature measured in the truck below limit specified in the approved JMF. • Below temperature limit specified in 00744.42. • Slumping or separating. • Solidifying. • Any other item, in the judgment of the Engineer,would be likely to decrease the quality of the paving. Dispose of rejected loads at no additional cost to the Agency. Vehicles which cause excessive segregation,which leak badly, or which the Engineer has determined delay normal operations, shall be removed from the project. Deliver the mixture to the paving machine at a rate that provides continuous operation of the paving machine, except for unavoidable delay or breakdown. If excessive stopping of the paving machine occurs during paving operations,the Engineer may suspend paving operations until the mixture delivery rate matches the paving machine operation. Do not use diesel oil or fuel as a release agent unless approved by the Engineer. 2026/WO 378 Special Provisions-42 Revised 02-04-2022 Conformed to Bid Documents Do not clean out trucks in front of the paver. Clean trucks in an approved location away from the paving operation. Pick up and restore cleanout area daily. (b) Depositing-Deposit ACP from the hauling vehicles so segregation is prevented. (c) Placing-Alternative equipment and means may be allowed by the Engineer if the use of a paver is impractical. If a dump truck cannot physically deliver the mix to a tight area,a very clean bucket of a loader may be used as an alternate. Do not place ACP during rain or other adverse weather conditions, unless allowed by the Engineer. ACP in transit at the time adverse conditions occur may be placed if: • It has been covered during transit. • The ACP temperature is satisfactory. • It is placed on a foundation free from pools or flow of water. • No other factors are observed by the Engineer that would reduce the quality of paving. Place the mixture in the number of Lifts and Courses, and to the compacted thickness for each Lift and Course, as shown. Place each Course in one Lift unless otherwise specified. Do not exceed a compacted thickness of 3 inches for any Lift, unless otherwise directed. Limit the minimum Lift thickness to twice the maximum Aggregate size in the mix. ACP shall not be placed against concrete,curb or gutter, or other structures, until seven days after the concrete has been placed, adequate strength of the concrete has been achieved,and structures have been backfilled to provide lateral support. When more than one lift of asphalt is required, no subsequent lifts shall be placed until the prior lift has adequately cooled and set sufficiently to prevent marking and has achieved minimum compaction requirements. Any mixture that becomes loose and broken, mixed with dirt or is any way defective shall be subject to removal and to replacement with fresh hot mixture,which shall be compacted to conform to the surrounding area. Any area showing an excess or deficiency of asphalt cement shall be subject to removal and to replacement. Removal and replacement under these provisions shall be at the expense of the Contractor. If hand work is necessary such as at transitions, ramps, beginning, and ending panels, stop material from becoming segregated by excessive raking. If larger aggregate collects on the surface, remove this larger aggregate and introduce fresh, appropriately graded mixture to the area and finish so there is no apparent segregation and the mat is one uniform texture. Do not broadcast mix by shovel across a new mat. If observed,the affected portion of the mat may be rejected. 00744.46 Longitudinal Joints-At longitudinal joints, bond,compact and finish the new ACP equal to the ACP against which it is placed. Roll joints without raking the joint with self-propelled rollers as follows: • Pass no. 1 on the hot side with 6-inch overlap on the cold (or previously-placed)mat • Complete pattern to cover the remainder of the mat (a) Location- Place the ACP in Panel widths which hold the number of longitudinal joints to a minimum. Offset the longitudinal joints in one Panel by at least 6 inches from the longitudinal joints in the Panel immediately below. (1) Base Course- Place Base Course longitudinal joints within 12 inches of the edge of a lane, or within 12 inches of the center of a lane, except in irregular areas, unless otherwise shown. 2026/WO 378 Special Provisions-43 Revised 02-04-2022 Conformed to Bid Documents (2) Wearing Course-Construct longitudinal joints at either lane lines or fog lines, or as shown or directed. See striping plans if part of the Contract Documents for design lane lines and fog lines, as they may be different from the existing layout. (b) Drop-Offs: • Provide warning signs and markings according to Section 00225 where abrupt or sloped edge drop-offs 1 inch or more in height occur. • Protect edges from being broken down. If unable to complete the Pavement without drop-offs according to 00744.46(c)do the following: • Construct and maintain a wedge of ACP at a Slope of 1 V:10H or flatter along the exposed longitudinal joint. • Remove and dispose of the wedge before continuing paving operations. • Construct, maintain, remove,and dispose of the temporary wedge at no additional cost to the Agency. ACP for the temporary wedge will be paid for at the Pay Item price. (c) Placing Under Traffic-When placing ACP Pavement under traffic, schedule Work for the nominal thickness being laid as follows: (1) More Than 2 Inches-Schedule Work so at the end of each working shift the full width of the area being paved, including Shoulders, is completed to the same elevation with no longitudinal drop-offs, unless approved. (2) Less Than or Equal to 2 Inches-Schedule Work so that at the end of each working shift one Panel of new travel lane Pavement does not extend beyond the adjoining Panel of new travel lane Pavement more than the distance normally covered by each shift. At the end of each week complete the full width of the area to be paved, including Shoulders,to the same elevation with no longitudinal drop-offs. 00744.47 Transverse Joints: (a) Travel Lanes-Construct transverse joints on the travel lane portion of all specified Pavement Courses, except Leveling Courses, as follows: (1) Temporary End Panel-Maintain Pavement depth, line and grade at least 4 feet beyond the selected transverse joint location,and from that point,wedge down on the appropriate Slope until the top of the Course being laid meets the underlying surface(assuming a Pavement Course thickness of 2 inches)as follows: • For wedges that will be under traffic for less than 24 hours,construct an 8 foot long wedge(1V:50H taper rate). • For wedges that will be under traffic for 24 hours or longer, construct a 25 foot long wedge(1V:160H taper rate). • Construct, maintain, remove,and dispose of the temporary wedge at no additional cost to the Agency. ACP for the temporary wedge will be paid for at the Pay Item price. When the Pavement Course thickness is different than the above 2 inch example, use the appropriate taper rate to compute the length of the wedge. The wedge length plus the 4 feet or longer Panel form the temporary end Panel. (2) Vertical Face-After the mixture has reached the required density: • Provide a smooth,vertical face the full depth of the Course being laid at the location selected for the joint by sawing, cutting or other approved method. • Remove the ACP material from the joint to the end of the Panel. If removed before resuming paving beyond the joint, reconstruct the temporary end Panel immediately by placing a bond-breaker of paper, dust,or other suitable material against the vertical face and on the surface to be occupied by the 2026/WO 378 Special Provisions-44 Revised 02-04-2022 Conformed to Bid Documents temporary end Panel. Construct a full-depth Panel at least 4 feet long, beginning at the sawed or cut joint, and taper it on a 1V:50H Slope to zero thickness. (3) Excess Asphalt Concrete Pavement-After completing a temporary end Panel as specified, dispose of unused, remaining ACP as directed. Payment will be made for the entire load of ACP, but will be limited to only one load for each joint of each Panel. (4) Resume Paving-When permanent paving resumes, remove the temporary end Panel and any bond- breakers. Clean the surface of all debris and apply a tack coat to the vertical edge and the surface to be paved. (5) Joint Requirements-Compact both sides of the joint to the specified density. When tested with a straightedge placed across the joint,the joint surface shall conform to 00744.70. (b) Abutting Bridge Ends-Compact the ACP abutting bridge ends and other rigid type Structures in the longitudinal direction and either transverse or diagonal direction, as directed. (c) Bridge Deck Overlays-Saw cut the wearing Course of Pavement directly over the joints in bridge decks, bridge end joints and end Panel end joints as soon as practical but within 48 hours of paving each stage of the wearing Course, unless otherwise directed. Saw cut a 3/8 inch wide, ± 1/8 inch, by 1/2 inch less than the thickness of the Panel of Pavement depth or 1 1/2 inches deep,whichever is less. Flush the saw cut thoroughly with a high-pressure water stream after the cut has been made. Before the cut dries out, blow it free of water and debris with compressed air. Fill the joint with a poured filler from the QPL. 00744.49 Asphalt Side Street Connections-Where four or more side street connections are required for a single collector or arterial street beyond the mainline paving, utilize a second paving machine to pave side street connections. Do not stop the mainline paver to complete side street connections. Complete side street connections within two hours of the mainline paving to provide a warm joint between the mainline and side street paving. Functional classifications for the streets within the project are as follows: • Bangy Road—Major Arterial • Kruse Way—Major Arterial • Douglas Way—Local • Collins Way—Local • Hallmark Drive—Local • Kruse Oaks Drive—Local 00744.50 Compaction-After the ACP has been spread, struck off, and surface irregularities and other defects remedied, roll it uniformly until compacted to a minimum of 93 percent of MDT. Perform finish rolling and continue until all roller marks are eliminated. Rollers shall not make sharp turns on the course being compacted and they shall not be parked on the hot asphalt mixture. Complete breakdown and intermediate compaction before the ACP temperature drops below 180°F, unless otherwise directed. When the rolling causes tearing,displacement, cracking or shoving, make necessary changes in compaction temperature,type of compaction equipment, and rolling procedures. Determine compliance with density Specifications by random testing of the compacted surface with calibrated nuclear gauges. Determine the density by averaging QC tests performed by a CDT with the nuclear gauge operated in the backscatter mode according to AASHTO T 335 at one random location for each 100 tons of asphalt concrete placed, but take no less than 10 tests each shift. Do not locate the center of a density test less than 1 foot from the Panel edge. Calculate MDT according to ODOT TM 305. The Engineer may waive compaction testing upon written notice. Compaction to a specified density will not be required for the following: 2026/WO 378 Special Provisions-45 Revised 02-04-2022 Conformed to Bid Documents • Thin Pavements-Leveling, patches,or where the nominal compacted thickness of a Course of ACP will be less than 2 inches. • Other Areas-Temporary Surfacing, guardrail flares, mailbox turnouts, road approaches, and areas of restricted width of less than 8 feet wide or limited length, regardless of thickness. Compact thin Pavements and other areas according to 00749.45. Any displacement of any course, regardless of thickness, occurring as a result of the reversing of the direction of a roller, or from other caused, shall be corrected at once by the use of rakes and addition of fresh mixture when required. The Contractor shall notify the Engineer/Inspector immediately when the average density does not meet 93%or exceeds 95%. An investigation will be initiated to determine if the results indicate that a problem with the mix is developing before laying any more material. Take all actions necessary to resolve compaction problems. Do not resume paving until allowed by the Engineer. Take immediate corrective measures when the specified compaction density is not being achieved. At the Engineer's discretion, corrective measures may include removing and replace areas that fail to comply with compaction requirements. Add the following subsection: 00744.51 Opening Sections to Traffic-Schedule work so that, during the same shift,the surfaces being paved are paved full width and length through the top Base Course before opening to traffic. Traffic will be allowed on the top Base Course up to five Calendar Days. Construction equipment and trucks are not allowed on the base lift of paved streets. 00744.52 Joints-When placing new asphalt concrete adjacent to existing asphalt concrete, in new paving applications, all joints shall be sealed with a heat-applied rubberized sealant.Tack and sand seal will not be accepted. Sealant shall conform to ASTM D6690 Type 1 or approved equal. Maintenance 00744.60 Correction of Defects-Correct all defects in materials and Work, as directed, at no additional cost to the Agency. Corrective measures required by the Engineer may include removal and replacement of the surface course within the defective area. Complete all corrective work within 14 calendar days following notification from the Engineer. After completion of the defective work, if the Engineer finds the work unsatisfactory, perform additional corrective work on the areas still not meeting the requirements. Correct defects according to the following: (a) Fouled Surfaces-Repair, clean, and retack fouled surfaces that would prevent full bond between successive Lifts of mixture. (b) Boils,Slicks,and Oversized Material- Replace boils, slicks, and oversized materials with fresh mixture. (c) Segregation -Take corrective measures when segregation or non-uniform surface texture is occurring in the finished mat. If segregation continues to occur, stop production until a plan for providing uniform surface texture is approved. (d) Roller Damage to Surface-Correct surface damage from rollers with additional fresh mixture or by other approved means. (e) Longitudinal Joints-Take corrective measures when open longitudinal joints are being constructed or when the elevation of the two sides of a longitudinal joint does not match. If problems with the longitudinal joint continue to occur, stop production until a plan for providing tight, equal elevation longitudinal joints is approved. (f) Other Defects- Remove and replace any ACP that: 2026/WO 378 Special Provisions-46 Revised 02-04-2022 Conformed to Bid Documents • Is loose, broken, or mixed with dirt. • Shows visually too much or too little asphalt. 00744.61 Warranty—Provide a one year warranty for all work completed on the project in conformance with the General Conditions. Finishing and Cleaning Up 00744.70 Pavement Smoothness- Furnish a 12-foot straightedge. Test with a 12-foot straightedge parallel to and perpendicular to the centerline, as directed. The Pavement surface shall not vary by more than 1/4 inch. Mark areas not meeting the surface tolerance. These tolerances shall apply when water valve boxes and other utility appurtenances can be adjusted during the paving operations. 00744.75 Correction of Pavement Roughness -Correct Equipment or paving operation procedures when tests show the Pavement smoothness does not comply with 00744.70. In addition, do the following: (a) Methods-Correct surface roughness to the required tolerances, using one of the following methods as approved by the Engineer: • Remove and replace the wearing surface Lift. • Profile to a maximum depth of 0.3 inch with abrasive grinders equipped with a cutting head comprised of multiple diamond blades, and apply an emulsion fog seal as directed. (b) Time Limit-Complete correction of all surface roughness within 14 Calendar Days following notification, unless otherwise directed. 00744.76 Cleanup-Clean and remove all excess asphalt, debris and tack from all facilities including but not limited to manhole covers, valve boxes, catch basins, concrete gutter and curb faces. Keep a sweeper on site at all times to sweep areas as needed and as directed. Measurement 00744.80 Measurement-The quantities of ACP will be measured on the weight basis. No deductions will be made for asphalt cement, mineral filler, lime, anti-strip, or any other additive used in the mixture. Payment 00744.90 Payment-The accepted quantities of ACP incorporated into the Project, whether or not recycled Materials are used, will be paid for at the Contract unit price, per ton,for the item"Level 3 ACP''/2" Mixture The following will be inserted in the blanks: • The level of ACP (2 or 3)will be inserted in the first blank. • The type of ACP(1/2 inch, 3/8 inch, 1/4 inch),will be inserted in the second blank. • The words"in Leveling", "in Temporary", "in Leveling and Temporary"or"with Fibers"will be inserted in the third blank when applicable. Payment will be payment in full for furnishing and placing all Materials, and for furnishing all Equipment, labor, and Incidentals necessary to complete the Work as specified. Payment includes furnishing and placing temporary asphalt placed to open the roadway to traffic. 2026/WO 378 Special Provisions-47 Revised 02-04-2022 Conformed to Bid Documents No separate or additional payment will be made for: • asphalt cement, mineral filler, lime,and anti-stripping or other additives • sawing, cleaning, and filling joints on bridge deck overlays • work completed at night • ACP reinforcing fibers • Quality Control Testing Section 00748—Asphalt Concrete Pavement Repair Comply with Section 00748 of the Standard Specifications. Section 00749 -Miscellaneous Asphalt Concrete Structures Comply with Section 00749 of the Standard Specifications modified as follows: Add the following subsection: 00749.15 Asphalt Berms-Use a 3/8"dense mix for asphalt berms. 00749.91 Method "A"—Weight and Extras Basis—Add the following pay items to the pay item list: Pay Item Unit of Measurement Q) Extra for Spot Grind and Inlays Square Yard Replace the paragraph that begins, "Item (a)includes...",with the following paragraph: Item (a)includes road approaches,street connections, driveways, guardrail flares,and mailbox turnouts. Add the following to the end of this subsection Item (j)includes spot grind and inlay areas shown, and as marked and adjusted by the Engineer in the field. Areas are for localized repairs as shown. Areas will be based on a typical grinder width (7 foot maximum). Asphalt concrete pavement and cold plane pavement removal will be measured and paid for separately. No separate or additional payment will be made for furnishing and placing all materials, including asphalt concrete and asphalt tack coat, and for furnishing all equipment, labor, and incidentals necessary to complete the respective items in place as specified. Section 00759-Miscellaneous Portland Cement Concrete Structures Comply with Section 00759 of the Standard Specifications modified as follows: Add the following subsection: 00759.01 Terminology-According to 00110.05(a),for the purposes of this Contract,the terms"sidewalk ramp"and "sidewalk ramps"shall respectively refer to and shall be read to mean "curb ramp"and "curb ramps". 2026/WO 378 Special Provisions-48 Revised 02-04-2022 Conformed to Bid Documents 00759.02 Definitions—Delete this subsection. 00759.03 Required Submittals-Replace this subsection, except for the subsection number and title,with the following: Material ordered or Work done before the Engineer reviews and returns the documents shall be at the Contractor's risk. Submit the following: (a) ADA Certification for Contractors- For all supervisory personnel who directly supervise the curb ramp Work, submit the names, telephone numbers, and copies of the ODOT ADA Certification for Contractors at least 10 Calendar Days before the preplacement conference. (b) Curb Ramp Work Plan Schedule- Do not begin any curb ramp Work before the plan for completing the Work has been approved.At least 21 Calendar Days before the curb ramp Work is scheduled to begin, submit a plan for accomplishing all phases of the curb ramp Work, including but not limited to the following (also see 00180.41): • Surface preparation • Compliance with Working Drawings and details submitted under 00759.03(c) • Compliance with current Standard Drawings and Plans • Waste handling and disposal 00759.31 Qualifications-Add the following sentence to the end of the paragraph: Provide onsite supervisory personnel that are ODOT ADA Certified during construction of the curb ramps. 00759.50(a) General-Add the following paragraphs to the end of this subsection: Install truncated domes as shown. Place according to the manufacturer's recommendation. Install abutting truncated dome panels with no more than 1/4 inch spacing. Install anchors along cut edges of truncated dome panels according to manufacturer's recommendations. In addition,finish concrete surfaces of Structures to be within the established Slopes and dimensions allowed by the Standard Drawings and Plans. Repair or remove and replace Structures not meeting the Standard Drawings and Plans at no additional cost to the Agency. Add the following subsection: 00759.55 Correction of Deficient Structures-Unless otherwise approved, notify the Engineer before performing corrective action. Correct deficiencies at no additional cost to the Agency. Perform corrective actions as directed, according to the approved corrective action plan, and according to the following: Add the following paragraph to the end of this subsection: After sidewalks are cured and forms are stripped, restore any disturbed adjacent surfacing to prior condition or better. Restoration work includes but is not limited to the roadway surfacing reconstruction work required to retrofit the sidewalk curb ramp,fine grading, bark mulch,sod,joint sealant and any other work necessary to match conditions. Asphalt concrete driveway connections located on private property are addressed under Section 00749. 00759.90 Payment-Add the following paragraphs to the end of this subsection: No separate or additional payment will be made for providing supervisory personnel who have an active ODOT ADA Certification for Contractors to directly supervise the curb ramp Work. 2026/WO 378 Special Provisions-49 Revised 02-04-2022 Conformed to Bid Documents All costs associated with protecting the freshly poured concrete, restoring disturbed landscaping/mulch/seeding/irrigation and surfacings shall be incidental to the Concrete Walks pay item. No separate or additional payment will be made for Preplacement Conference, concrete form verification, and removing, maintaining, reinstalling existing mailboxes. Removal will be paid for according to 00310. Aggregate base will be paid for according to 00640. Concrete curbs will be paid for according to 00759. No separate or additional payment will be made for curb transitions. Payment will be included in payment made for the appropriate items under which this Work is required. PART 00800—PERMANENT TRAFFIC SAFETY AND GUIDANCE DEVICES Section 00850—Common Provisions For Pavement Markings Comply with Section 00850 of the Standard Specifications modified as follows: 00850.43 Prepare and Prime Pavement—Add the following to the end of this subsection: Install pavement markings within ten calendar days of paving operations. Section 00850—Common Provisions For Pavement Markings Comply with Section 00850 of the Standard Specifications modified as follows: 00850.43 Prepare and Prime Pavement—Add the following to the end of this subsection: Install pavement markings within ten calendar days of paving operations. Section 00855—Pavement Markers 00855.40 Pavement Markers, (b)Surface Preparation,second paragraph- Delete this paragraph in its entirety. 00855.90 Payment—Add the following to the end of this subsection: No separate or additional payment will be made for removal of existing pavement markers,as stated prior to completing pavement overlays. Section 00865—Longitudinal Pavement Markings—Durable 00865.90 Payment—Add the following to the end of this subsection: 2026/WO 378 Special Provisions-50 Revised 02-04-2022 Conformed to Bid Documents No separate or additional payment will be made for removal of existing longitudinal pavement markings, as stated prior to completing pavement overlays. Section 00867—Transverse Pavement Markings—Legends and Bars 00867.45 Installation- Delete the fourth sentence in its entirety and replace with the following: Apply the following marking material type only: • Thermo Plastic Type B-Hs 00867.75 Manufacturer Warranty, (b) Failure—Delete fourth bullet and replace with the following: • Skid Resistance-Markings fail to maintain an average skid resistance greater than or equal to 50 British Pendulum Number(BPN)when tested in an equal number of test locations in both wheel path and non- wheel path locations according to ASTM E303. 00867.90 Payment—Add the following to the end of this subsection: No separate or additional payment will be made for removal of existing longitudinal pavement markings, as stated prior to completing pavement overlays. PART 00900—PERMANENT TRAFFIC CONTROL AND ILLUMINATION SYSTEMS Section 00905—Removal And Reinstallation Of Existing Signs Comply with Section 00905 of the Standard Specifications modified as follows: 00905.90 Payment-Add the following to the end of this subsection: No separate or additional payment will be made for placing Agency provided metal sign supports and footings at relocated sign locations,as shown in the Plans. Section 00940—Signs Comply with Section 00940 of the Standard Specifications modified as follows: Add the following subsection: 00940.12 Sign Coating- Furnish all signs on the Project with a shop-applied anti-graffiti coating on both the background and legend sheeting according to 02910.70, regardless of substrate material. 2026/WO 378 Special Provisions-51 Revised 02-04-2022 Conformed to Bid Documents 00940.40 General-Add the following sentence to the end of the paragraph that begins"Fabricate all components...": For signs that require anti-graffiti coating,fabricate all components of each individual sign with sheeting and anti- graffiti coating from the same supplier to ensure that all components are compatible and are warrantable by the manufacturer. 00940.47 Sign Erecting-Add the following paragraph to the end of this subsection: Trim and remove branches,vegetation,or other materials obstructing the visibility of signs by Public Traffic, as directed. 00940.90 Payment-Add the following paragraphs to the end of this subsection: Trimming and removal of branches,vegetation, or other materials will be paid for according to 00320.90. No separate or additional payment will be made for anti-graffiti coating of signs. Section 00950-Removal Of Electrical Systems Comply with Section 00950 of the Standard Specifications modified as follows: 00950.02 Definitions- Delete this subsection. 00950.42 Salvaging and Stockpiling Materials-Add the following to the end of this subsection: All existing traffic signal equipment to be removed that is deemed usable by City of Lake Oswego and Clackamas County shall be delivered to 17601 Pilkington Road, Lake Oswego, Oregon 97035. Contact the Clackamas County Inspector,the Engineer and Carl Olson at(503)742-4684,48 hours prior to removal of existing traffic signal equipment.The Engineer shall inform the Contractor which equipment the Contractor shall deliver to the City and the location of deliveries are to be received. Equipment damaged or missing during removal shall be replaced or paid for by the Contractor. All equipment deemed unusable shall become the property of the Contractor and be removed from the project site. Section 00960—Common Provisions For Electrical Systems Comply with Section 00960 of the Standard Specifications modified as follows: 00960.02 Equipment List and Drawing Submittals—Replace this subsection with the following subsection: 00960.02 Equipment List and Drawing Submittals—Within 30 Calendar Days after execution of the Contract, submit electronic PDF copies of the Blue Sheets (see 00160.00 and 001607.07)and the Green Sheets(see 00160.00 and 00160.07)according to 00150.37 for all materials the Contractor proposes to install. Refer to 00990 for exemptions to the Blue Sheets and Green Sheets on Clackamas County operated traffic signals. Within 14 Calendar Days after receipt of submittals,the Engineer will review the submittals and designate them in writing as"review"or"reviewed with comments".Then within the follow 7 Calendar Days after the Engineer review, Clackamas County Traffic staff will review the submittals and designate them in writing"approved", "approved as noted", or"revise and resubmit". Do not proceed with the Work before receiving written approval of the submittals from the Engineer and Clackamas County. 2026/WO 378 Special Provisions-52 Revised 02-04-2022 Conformed to Bid Documents 00960.10 Materials—Add the following to the end of this subsection: Use only Schedule 80 PVC conduits and fittings for all underground conduits. Add the following subsection: 00960.11 Coating- Prepare and black powder coat equipment where shown according to the applicable portions of Section 00593. Do not coat equipment fabricated of aluminum, stainless steel, or hot-dipped galvanized material, except as shown or specified. Provide the following colors: Item SAE AMS-STD-595 Color Number Pedestrian pedestals, pushbutton posts, caps, frangible bases, and other associated equipment. 27038 00960.30 Licensed Electricians- Replace this subsection, except for the subsection number and title,with the following: According to the Oregon Administrative Rule 918-282-0120(1), no person or Entity shall allow any individual to perform electrical work for which the individual is not properly registered or licensed. Every person who installs electrical systems on the Project shall submit a copy of their electrical license or apprentice registration to the Engineer prior to performing any Work. They must be licensed as an S or a J under Oregon Administrative Rule 918- 282-0140 or 918-282-0170. 00960.43 Foundations—Add the following to the end of this subsection. Separate the aluminum from the concrete with one layer of 30 pound nonperforated, asphalt-saturated felt. Neatly trim the felt pad to the size and shape of the base contact surface. Section 00962—Metal Illumination And Traffic Signal Supports Comply with Section 00962 of the Standard Specifications modified as follows: 00962.10 Materials-Add the following to the end of this subsection: For pedestrian pedestals, pushbutton posts, caps,frangible bases, and other associated equipment, provide a topcoat color of semi-gloss black that matches SAE AMS-STD-595 color#27038. 00962.46(j)(3) Bolt Inspection—Delete this subsection. 00962.48 Coating-Replace this subsection, except for the subsection number and title,with the following Prepare and powder coat supports according to the applicable portions of Section 00593. Provide coating materials for field application, repairing damaged coatings, and coating hardware after installation, according to Section 00593. Do not coat: • Slip plate or arm connection surfaces. • Slip base bolting hardware. • Anchor rods, anchor rod washers, and anchor rod nuts. 2026/WO 378 Special Provisions-53 Revised 02-04-2022 Conformed to Bid Documents Section 00990—Traffic Signals Comply with Section 00990 of the Standard Specifications modified as follows: 00990.00 Scope-Replace this subsection, except for the subsection number and title,with the following: In addition to requirements of Section 00960 and Section 00962, install traffic signals, ramp meters,flashing beacons, interconnect systems, and automatic traffic recorders according to the following Specifications. Add the following subsection: 00990.10 Materials- Furnish backer rod materials meeting the requirements of 02440.14. Furnish hot-melt loop sealant from the QPL. 00990.13 Traffic Signal Circuits All high-voltage wiring smaller than#10 AWG shall be IMSA 19-1 cable. The#14 AWG, multi-conductor cables ran for traffic signal circuits will conform to IMSA Specification 19-1. Color coding of the conductors will be as follows: 2026/WO 378 Special Provisions-54 Revised 02-04-2022 Conformed to Bid Documents Traffic Signal Color Code Clackamas County, Oregon #14 AWG IMSA 19-1 Traffic Signal Cable Mast Arms Only Function 20 Conductor 10 Conductor 7 Conductor 5 Conductor 4 Conductor (Phase) [Feed] [Branch] [Branch] [Branch] [Branch] a Phase Red Red Red Red Red Red N c Phase Yellow Orange Orange Orange Orange Orange Phase Green Green Green Green Green Green a Phase Red Red/Black Red/Black Red Red Red N in Phase Yellow Orange/Black Orange Orange Orange Black 0 -o in Phase Green Green/Black Green/Black Green Green Green Phase Red Red/Black White/Black White/Black Red Red c -,c. Phase Yellow White/Red Black Black Orange Black J Phase Green Black/White Blue Green Green Green Phase Red Red/Green White/Black White/Black Red Red a —°` Yellow/Flashing 45> Yellow Arrow Orange/Red Black Black Orange Black 0 Phase Green Blue/Red Blue Blue Green Green II 2 Phase Don't Red/White Red Red Red - 65 Walk c as Phase Walk Green/White Green Green Green 2Don'taWalk Black Red/Black Red Red - a Phase a Blue/White Green/Black Green Green - cn Walk c Common White/Black White/Black White/Black Orange - 0 m Main Blue Blue Blue Black - Street Phase m a Side Blue/Black Black Black Black - Street Phase Spare White - - - - AC Common Spare White (Branch Only) 00990.30 Video/Radar Detector Manufacturer's Representative-Replace this subsection, except for the subsection number and title,with the following: 2026/WO 378 Special Provisions-55 Revised 02-04-2022 Conformed to Bid Documents When video/radar detection is shown, provide the services of a manufacturer's representative on-site within 1 week in advance of the anticipated electrical installation completion date to set-up devices with Agency electrical crew present. Add the following subsection: 00990.40 Work in Existing Controller Cabinets-Install new field wiring as shown into the existing controller cabinet without terminating. New control equipment installed as shown in an existing controller cabinet will be tested prior to installation according to 00990.70. At existing controller cabinets the Agency will be responsible for: • Storage, delivery, installation, and activation of new control equipment • Any required modifications to existing control equipment or existing field wiring terminations • Terminating new field wiring Prior to the anticipated installation of new control equipment, modification of existing control equipment, or modification of existing field wiring terminations, schedule field testing according to 00990.71 Field testing and activation of the new control equipment or modifications will occur within the same work shift. Be present at the Project Site during field testing. Add the following subsection: 00990.41 Inductive Loop Detectors: (a) General- Do not begin saw cutting until the loop layout has been inspected by the Engineer. Do not place wire in saw cuts until the cuts have been inspected by the Engineer. (b) Saw Cut and Wire Installation-Saw cut in a manner that is the most practicable, direct line between loops and junction boxes. Immediately after saw cutting and before the cuttings dry, thoroughly flush each cut with a high-pressure water stream. Before the cuts dry, blow cuts free of water, debris, rock, and grit with compressed air. Slots may also be cleaned by means of a high-pressure water injection/vacuum extraction system. Remove rocks or other material that may be wedged in the cut. Remove and dispose of all cuttings according to 00290.20. Dry cuts before placing wire. After the saw cut is cleaned of debris, place the loop wire by pushing it into the slot with a blunt nonmetallic object. Use care to avoid damaging the insulation. (c) Sealant- Install the sealant in slots according to the manufacturer's instructions. Furnish a copy of the manufacturer's specifications including application procedures.The Engineer may order a test run of any application method or material before filling saw cuts. In order to prevent heat damage to the insulation, do not allow the temperature of the sealant to exceed 410°F during application. Install hot-melt sealants in layers to prevent damage to wire insulation.Allow each layer to cool before the next layer is installed. Do not use water to accelerate cooling. Sealants that crack or pull away from the saw cuts after curing will be rejected. (d) Resistance and Continuity Testing-The resistance to ground of the loop and loop feeder combinations,shall be 500 M52 or greater when checked at the following conditions: • Before splicing and sealing-continuity test 2026/WO 378 Special Provisions-56 Revised 02-04-2022 Conformed to Bid Documents • Before splicing after sealing -resistance test • After splicing and sealing-resistance test Furnish a report of the resistance and continuity results for each loop at each testing condition. Add the following subsection: 00990.42(a) Loop Feeder Cables—When terminating loop feeder cable inside the controller cabinet, do not remove the outside jacket and shield more than 6 inches from the end of the cable. Crimp lugs used for loop wire field terminals may be insulated or non-insulated. Terminate loop feeder shield drain wire to the cabinet input panel grounding bus nearest the feeder wire termination point. Add the following subsection: 00990.45 Repair Open Holes In Metal Poles, Pedestals,and Mast Arms—Repair holes in metal poles, pedestals, and mast arms caused by removal of equipment using pipe plugs. For holes larger than 1 inch in diameter or of irregular shape, submit method and materials to be used. 00990.50 Signal Covers-Add the following paragraph to the end of this subsection: Signal covers may be omitted for flashing beacon bid items. 00990.70 Testing and Turn-On -Replace this subsection with the following subsection: 00990.70 Chamber Testing -This Work includes testing Equipment that requires chamber testing. (a) Equipment Requiring Chamber Testing-The following Equipment will be tested by the Agency before being installed: • Power supplies • Input devices • Output devices • Auxiliary Equipment in the controller cabinet • Other Equipment required for the operation of the installation • Video/radar/hybrid detection systems • Equipment listed as"chamber tested"on the green sheets Any cost associated with testing the control equipment will be the responsibility of the Contractor. The Equipment will be tested in three categories: physical,functional, and environmental as specified in the Standard Specification for Microcomputer Signal Controller. (b) Equipment Failure-An Equipment failure is any occurrence that results in non_specified operation of the Equipment. Notification of any Equipment failures will be provided. If any Equipment failures are documented,the Contractor shall coordinate with City of Lake Oswego and Clackamas County to replace Equipment and commence testing of new Equipment. (c) Equipment Rejection -The Equipment will be rejected under the following conditions: (1) Twice Fail-The Equipment fails twice in the same testing category. Rejected Equipment will not be accepted for testing or installation on any subsequent project within the State of Oregon. 2026/WO 378 Special Provisions-57 Revised 02-04-2022 Conformed to Bid Documents (d) Equipment Acceptance-Equipment that successfully passes the chamber testing procedure will be certified by the Agency as acceptable for installation.Acceptability for installation does not guarantee final acceptance of the completed installation. The successful completion of the testing does not relieve the Contractor of the responsibility to furnish a complete working electrical installation at the time the Equipment is placed in operation. The Contractor will be notified when the testing has been completed. Pick-up the video/radar/hybrid detection systems at the test facility or as directed by the Engineer. (e) Controller Cabinet Control Equipment Installation-Be responsible for pick-up and installation of the video/radar/hybrid detection systems. The Contractor will be responsible for pick-up and installation of the Equipment. Equipment that the Contractor is to install will be stored at Lake Oswego Public Works. Add the following subsection: 00990.71 Field Testing- Field testing of electrical installations will be performed by Agency electrical crews. Notify the Engineer one week in advance of the anticipated electrical installation completion date. Field testing will be performed within one week following the date of completion.The Engineer will notify the Contractor of the test results. Information on Agency field testing procedures is available from the Engineer. Add the following subsection: 00990.72 Turn-on-This Work includes turning on completed electrical installations. (a) General-The Engineer will establish the date and time the electrical installation is to be turned on.The Agency will turn on the electrical installation within one week after completion of corrections identified during field testing. Be present at the Project Site the date of the turn-on,for the duration of the turn-on process. After electrical installations are turned on and operating as designed,the agency responsible for maintenance will assume operation and maintenance of the electrical installation.Turn-on does not constitute final approval.The Contractor is still obligated to finish any incomplete portion of the electrical installation and correct problems with workmanship or replace material that does not meet Specifications.After turn-on, damage to the electrical installation caused by conditions beyond the Contractor's control will be the responsibility of the maintaining agency. (b) For Traffic Signals-The Agency will be responsible for providing operating software and timing parameters for traffic signals. Do not turn on electrical installations without the Agency provided timing parameters. PART 01000—RIGHT OF WAY DEVELOPMENT AND CONTROL Section 01030 -Seeding Comply with Section 01030 of the Standard Specifications modified as follows: 01030.80 Measurement-Add the following to the end of this subsection: 2026/WO 378 Special Provisions-58 Revised 02-04-2022 Conformed to Bid Documents 01030.80 Measurement—Replace this subsection, except for the subsection number and title,with the following: No measurement of quantities will be made for seeding work. 01030.90 Payment—Replace this subsection, except for the subsection number and title,with the following: No separate or additional payment will be made for seeding as this work is considered incidental. Section 01040-Planting Comply with Section 01040 of the Standard Specifications modified as follows: 01040.90 Payment—Replace this subsection, except for the subsection number and title,with the following: No separate or additional payment will be made for plantings as this work is considered incidental. Section 01070—Mailbox Supports Comply with Section 01070 of the Standard Specifications modified as follows: 01070.00 Scope-Add the following paragraph to the end of this subsection: This Work includes removing, maintaining, and reinstalling existing mailboxes and existing supports. 01070.80 Measurement-Add the following paragraph to the end of this subsection: The quantities of mailboxes and supports removed, maintained, and reinstalled will be measured on the unit basis, regardless of type, installed in permanent locations. 01070.90 Payment-Add the following Pay Item to the Pay Item list: Pay Item Unit of Measurement (d) Mailbox Relocation Each Item (d)includes removing mailboxes and supports, maintaining them at temporary locations, and reinstalling them at their permanent locations as shown on the plans. Section 01095—Site Furnishings Section 01095,which is not a Standard Specification, is included in this Project by Special Provision. Description 01095.00 Scope-This Work consists of constructing site furnishings such as benches, picnic tables, litter receptacles, bicycle racks, and other furnishings as shown or directed. 2026/WO 378 Special Provisions-59 Revised 02-04-2022 Conformed to Bid Documents Construction 01095.40 General- Install all site furnishings as shown and according to the manufacturer's recommendations. 01095.41 Coating—Add this subsection,with the following: Prepare and powder coat bicycle racks semi-gloss black. SAE AMS-STD-595 color number 27038. Measurement 01095.80 Measurement-The quantities of site furnishings will be measured on the unit basis. Payment 01095.90 Payment-The accepted quantities of site furnishings will be paid for at the Contract unit price, per unit of measurement,for the following item: Pay Item Unit of Measurement (d) Bicycle Racks Each Payment will be payment in full for furnishing and placing all Materials, and for furnishing all Equipment, labor,and Incidentals necessary to complete the Work as specified.The related crosswalk closure sign is paid for under 00940. PART 01100—WATER SUPPLY SYSTEMS Section 01140—Potable Water Pipe and Fittings Comply with Section 01140 of the Standard Specifications modified as follows: 01140.10 Materials—For the material listed as"Detectable Marking Tape and Wire", delete the word "Detectable". Add the following to the subsection: All materials shall be of domestic manufacture. 01140.41 Laying Pipe, (c) Polyethylene Encasement — Delete the words, "Where shown, lay" and replace with "Install". 01140.43 Polyethylene Encasement, (a) Installation— In the second and third sentences, replace "2 inch"with "3 inch". After the third sentence,add the following: Polyethylene tape and primer shall be 3-inch wide,plastic backed, 12 mil black adhesive tape, Polyken No.900-12 with Polyken 1027 Primer, or approved equal. 01140.47 Connections to Existing Mains, (a) Notifications— In the second sentence, delete "5" and replace with "7". 01140.47 Connections to Existing Mains, (b) Permission — Delete the second sentence and replace with the following: Operation of valve on the City's water system by anyone other than City employees is strictly prohibited. Contractor shall not open or close valves, or take other actions that may affect the operation of the existing water system, except as specifically required by the drawings and specifications, and only upon prior approval of the City. 01140.51 Hydrostatic Testing—(a)General—Delete the first sentence and replace with the following: Test all water mains and appurtenances in accordance with AWWA C600. 2026/WO 378 Special Provisions-60 Revised 02-04-2022 Conformed to Bid Documents 01140.51 Hydrostatic Testing,(a)General,(1)Backfill—In the second sentence,delete the word"time"and replace with the words"a minimum of 72 hours". 01140.51 Hydrostatic Testing, (a)General, (2)Filling Pipe— 01140.51 Hydrostatic Testing, (a) General, (9) Test Section Length — Delete the last two sentences of the subsection in their entireties. 01140.51 Hydrostatic Testing, (c)Testing Sections with Hydrants Installed—Delete subsection text in its entirety and replace with the following: Test all fire hydrants in accordance with AWWA C600. 01140.51 Hydrostatic Testing, (d) Testing Hydrants Installed on Existing Mains — Delete subsection text in its entirety and replace with the following: Test all fire hydrants in accordance with AWWA C600. Add the following subsection: 001140.65 Temporary Line Stop with Thrust Straddle Block (a) Description—Provide, install, operate, maintain, and remove temporary line stop systems on existing 8-inch ductile iron potable water main, including all required thrust straddle blocks, fittings, excavation, restraint, backfill, and surface restoration necessary to temporarily stop flow for construction activities. Temporary line stops are for construction sequencing only and are not permanent installations. All work shall be coordinated with the City of Lake Oswego. (b) Materials—Provide materials that meet the following requirements: • Temporary line stop equipment and fittings shall be compatible with 8-inch CL52 ductile iron pipe and rated for the operating pressure of the City of Lake Oswego potable water system. • Temporary line stop fittings shall be bolt-on, sleeve style and manufactured by JCM Line Stop Fittings, or approved equal. • Thrust straddle blocks shall be designed in accordance with City of Lake Oswego standards and Section 00440. • Submit line stop procedures, thrust restraint details, and product data for review by the Engineer and the City of Lake Oswego prior to performing work. (c) Construction—Perform temporary line stop work as follows: • Coordinate line stop scheduling and procedures with the City of Lake Oswego. • Excavate and prepare the existing water main in accordance with approved submittals • Install thrust straddle blocks prior to initiating line stop operations. • Perform line stop operations in accordance with manufacturer's recommendations and approved procedures. • Maintain positive restraint of the pipeline and prevent movement or damage during pressurized operations. • Maintain sanitary conditions suitable for potable water systems at all times. • Restore potable water service upon completion of construction activities. • Remove temporary line stop equipment unless otherwise directed. • Backfill excavations and restore surfaces in accordance with applicable sections of the Standard Specifications. • Do not initiate line stop operations without prior written approval from the Engineer and the City of Lake Oswego. 001140.80 Measurement— In the paragraph that begins with "...quantities of potable water pipe and fittings will be determined..."add the following item to the ordered list: 2026/WO 378 Special Provisions-61 Revised 02-04-2022 Conformed to Bid Documents 001140.80(e)-Temporary Line Stop with Thrust Straddle Block—The quantity will be measured per Each, complete and accepted. Each measurement includes a complete line stop installation on one location of existing 8- inch ductile iron pipe, including associated thrust straddle blocks. 001140.90 Payment—In the paragraph that begins with "...quantities of Work performed under this Section..."add the following item to the ordered list: 001140.90(o)-Temporary Line Stop with Thrust Straddle Block—Payment will be made at the Contract unit price, per Each,for - Temporary Line Stop with Thrust Straddle Block Payment includes all labor, materials, equipment, coordination with the City of Lake Oswego, potable water protections, excavation, thrust restraint,operation, removal, backfill, surface restoration, and all incidental work necessary to complete the item.Temporary line stops and thrust straddle blocks are not incidental to other potable water pipe items. Section 01150—Potable Water Valves 01150.40 General, (b)Valve Operator Extensions—Delete the first sentence and replace with the following: Install a valve operator extension with a Rock guard so that the valve nut operator is located not more than 12 inches below finished grade.Valve operator extension shall be removable from the surface. Section 01170—Potable Water Service Connections,2 Inch And Smaller Comply with Section 01170 of the Standard Specifications modified as follows: 001170.80 Measurement— In the paragraph that begins with "...The quantities of reconnecting existing services, ..."add the following sentence to the end of the paragraph: For this Project only, measurement of the 2 Inch Water Meter Assembly is limited to the installation of the meter box and the 2 Inch cap installed on the 2 Inch water service connection piping stubbed out inside the meter box. 001170.90 Payment— In the paragraph that begins with "...Item (f)includes meter when specified,angle meter valve..."add the following sentence to the end of the paragraph: For this Project only,the 2 Inch Water Meter Assembly Pay Item shall include installation of the meter box and the 2 Inch cap installed on the 2 Inch water service connection piping stubbed out inside the meter box. It shall not include the angle meter valve, customer service valve, meter setter,appurtenances or fittings. 2026/WO 378 Special Provisions-62 Revised 02-04-2022 Conformed to Bid Documents PART 02000—MATERIALS Section 02030—Supplementary Cementitious Materials Comply with Section 02030 of the Standard Specifications modified as follows: 002030.15 Natural Pozzolans- Replace this subsection, except for the subsection number and title,with the following: Furnish Class N natural pozzolans from the QPL and conforming to AASHTO M 295 or ASTM C1945. Add the following subsection: 02030.55 Ground Glass Pozzolan -Furnish ground glass pozzolans meeting the requirements of ASTM C1866 Type GS. Section 02050—Curing Materials Comply with Section 02050 of the Standard Specifications modified as follows: 02050.10 Liquid Compounds—Replace the paragraph that begins"Furnish liquid membrane-forming curing ..." with the following: Furnish liquid membrane-forming curing compounds from the QPL and meeting the requirements of ASTM C309. Before use, submit two, one quart samples from each lot for testing. Samples will be tested according to ODOT TM 721. Samples are not required for curing compounds used on Commercial Grade Concrete. Section 02320-Geosynthetics Comply with Section 02320 of the Standard Specifications. Section 02450—Manhole and Inlet Materials 02450.30 Metal Frames, Covers, Grates, and Ladders— Delete the first full paragraph beginning with "Fabricate steps . . . ". 2026/WO 378 Special Provisions-63 Revised 02-04-2022 Conformed to Bid Documents Section 02470—Potable Water Pipe Materials 02470.00 Scope—Delete the word "steel"and replace with the word abbreviation "HDPE". 02470.20 Ductile Iron Pipe, (a)General— In the last sentence, delete"Class 50"and replace with "Class 52". 02470.31 High Density Polyethylene (HDPE) Pipe—Delete the second sentence and replace with the following: Furnish all pipe with an SDR no greater than 11. 02470.50 Polyethylene Encasement—After"AWWA C105"add, "High-Density Cross Laminated (HDCL)type" 02470.60 Marking Tape and Wire, (a) Marking Tape—Delete the second and third sentences, and replace with the following: Use 6-inch wide marking tape with a blue background color and made of inert plastic material suitable for direct burial. The following message shall be imprinted on the tape continuously over its entire length with permanent bold black letters approximately 2 inched high: "CAUTION BURIED WATER LINE BELOW". Tape shall be manufactured by W. H. Brady Co., Seton Name Plate Corp., Marking Services, Inc., or approved equal. Section 02475—Potable Water Fitting Materials 02475.31 High Density Polyethylene (HDPE) Pipe Fittings — Delete the second sentence and replace with the following: Furnish all pipe with an SDR no greater than 11. 02475.50 Restrained Joints—Add the following paragraphs: Restrained joint pipe shall be ductile iron pipe manufactured in accordance with the requirements of ANSI/AWWA C151/A21.51. Pipe thicknesses shall be designed in accordance with ANSI/AWWA C150/A21.5, but in no case shall the pipe wall thickness be less than its Class 52 equivalent. Restrained joint fittings and restraining components shall be ductile iron in accordance with applicable requirements of ANSI/AWWA C110/A21.10 and/or ANSI/AWWA C153/A21.53. Restrained joints for pipe and fittings shall be designed for a water pressure of at least 250 psi. 02475.60 Bolted, SleeveType Couplings for Plain-End Pipe— 02475.70 Acceptance - Joint restraint systems shall be U S Pipe "TR FLEX", EBBA Iron "Mega-Lug" or Romac Industries"Grip Ring", or approved equal. Where pipe field joint restraint is required, restraint shall be U S Pipe"Field Lok",or approved equal. Section 02480—Potable Water Valve Materials 02480.20 Gate Valves, (a) Minimum Pressure — In the last sentence, delete the phrase ", and 150 psi for pipe 14 inches to 16 inches in diameter". 02480.20 Gate Valves, (b)Arrangement—Delete this subsection in its entirety. 02480.20 Gate Valves, (c)Valves—Add the following: 2026/WO 378 Special Provisions-64 Revised 02-04-2022 Conformed to Bid Documents Valves in sizes 3-inch and above shall be of the resilient wedge type(metal-seated valves are not allowed). 02480.25 Valve Boxes—Delete the last two sentences and replace with the following: Valve boxes shall be installed in accordance with Standard Detail W6-01 —Typical Valve Box. 02480.26 Valve Stem Extensions -Delete the last sentence and replace with the following: Install a valve operator extension with a Rock guard so that the valve nut operator is located not more than 12 inches below finished grade.Valve operator extension shall be removable from the surface. 02480.30 Tapping Sleeve and Valve Assemblies, (b)Sleeves—Add the following: Provide a 3/4-inch test port on the tapping sleeve to allow for pre-tapping testing. Provide a pressure test at not less than 100 psi. No leakage shall be allowed during the duration of the test which shall be one (1)minute. 02480.80 Acceptance—Tapping sleeve and valve assemblies shall be U.S.Pipe,American Flow Control,or approved equal. Section 02485—Hydrant and Appurtenance Materials 02485.60 Tie Rods—Delete this subsection in its entirety. 02485.80 Acceptance — Fire hydrants shall be Waterous (Pacer), Mueller (Super Centurion), Clow (F2500), or approved equal. Section 02490—Potable Water Service Connection Materials,2 Inch and Smaller Delete Section 02490 text in its entirety and replace with the following: See Water-related Standard Details. Section 02560 -Fasteners Comply with Section 02560 of the Standard Specifications modified as follows: 02560.60(a)(1) Method 1 —Replace the paragraph that begins"Continue to tighten the nut until..."with the following: Continue to tighten the nut until the nut has turned twice the rotation shown in Table 00560-3 of Section 00560 from its snug-tight position mark for bolt lengths up to 8D (for greater than 8D up to 12D bolt lengths tighten to 1 1/6 turn from snug-tight). Section 02910—Sign Materials Comply with Section 02910 of the Standard Specifications modified as follows: 02910.33 Permanent Legends—Replace this subsection, except for the subsection number and title,with the following: (a) General—Permanent legends consist of white retroreflective screened, red retroreflective screened, black screened or cut-out white retroreflective sheeting. Meet the design of the FHWA Standard Rounded Capital Letter Alphabets for the letters and numerals of all permanent legends. 2026/WO 378 Special Provisions-65 Revised 02-04-2022 Conformed to Bid Documents Add following subsection: 02910.50 Digitally Printed Signs,Temporary-Temporary traffic control signs may use digitally printed signs from an integrated engineered match component system on the QPL and applied to furnished substrate according to 00222.10(b). 2026/WO 378 Special Provisions-66 Revised 02-04-2022 Conformed to Bid Documents SUPPLEMENTARY INFORMATION Conformed to Bid Documents ADDENDUM NO. 1 TO THE REQUEST FOR PROPOSALS TO PROVIDE CONSTRUCTION SERVICES FOR WORK ORDER 378 2026 PAVEMENT REHABILITATION PROJECT FOR CITY OF LAKE OSWEGO LAKE OSWEGO, OREGON THIS ADDENDUM IS HEREBY MADE A PART OF THE REQUEST FOR PROPOSALS DOCUMENTS TO THE SAME EXTENT AS THOUGH IT WERE ORIGINALLY INCLUDED THEREIN. ISSUED THIS 15th DAY OF APRIL 2026. (IA„.11/4F4s cEGO1 CITY OF LAKE OSWEGO 380 A AVENUE PO BOX 369 LAKE OSWEGO, OREGON 97034 Work Order No. 378 Page 1 of 2 Addendum No. 1 Conformed to Bid Documents 1. Please note the following clarifications on the WO 378—2026 Pavement Rehabilitation plans (Volume 2 of the bid documents). • On sheet G03, disregard Note 18 in the General Notes section. On sheet D03, disregard Note 5 in the ADA Notes section. Revised sheets will not be issued for these minor clarifications. 2. Please note the following clarifications on the WO 347—2024 High Priority Curb Ramps plans (Volume 3 of the bid documents). • On sheet G2, replace "2021 ODOT Standard Specifications" with "2024 ODOT Standard Specifications" in Note 3 of the Traffic Control Notes section. On sheet D1, replace "Level 2" with "Level 3". Revised sheets will not be issued for these minor clarifications. 3. Attached are the notes from the Pre-Bid Conference held on April 8th, 2026. End Work Order No. 378 Page 2 of 2 Addendum No. 1 Conformed to Bid Documents 0E0 � 2026 AC PAVING n EngineeringV � Pre-Bid ConferenceAgend a .0~ City of Lake Oswego, WO-378 OREGo -' Date of Conference: Wednesday April 8th, 2026. Time: 2:00 PM City Hall, Ponderosa room Project Inspector: Dan Payne. Thomas Benson & Kari Sprenger, City of Lake Oswego Contractor: TBD Designer: Consor Engineer: City of Lake Oswego The purpose of this meeting is to discuss specific project construction related items. The contractor and sub-contractors shall construct the project in a safe manner minimizing erosion, neighborhood impacts, traveling public impacts, and tree disturbance. 1. Introductions. Mort Anoushiravani, Assistant City Engineer. Stefan Broadus, Special Projects Project Manager. Dan Payne, Construction Project Manager. Kari Sprenger, Construction Inspector Thomas Benson, LO Head Inspector Jamie Roberts, Erosion and Sediment Control Coordinator. Vlad Hubenya, Traffic Control Coordinator 2. Project Work Scope Section 00140: The scope of work consists of pavement rehabilitation on various streets within Lake Oswego as well as major upgrades to the existing signalization at five (5) intersections: Kruse Way and Carman Drive, Kruse Way and Westlake Drive, Kruse Way and Kruse Oaks Drive, Bangy Road and Meadows Road, as well as Bangy Road and Bonita Road. These improvements will bring these signalized intersections into current industry standards for detection. This project will also construct about 60 curb ramps bringing them into compliance with current Americans with Disabilities Act (ADA) requirements. Most of these are located at intersections within the paving limits. Work will consist of: 1. Temporary signage for pedestrian and traffic control 2. Replacement of several stormwater catch basins 3. Removal of asphalt concrete (grinding) 4. Construction of asphaltic concrete pavement inlays and overlays 5. Installation of pavement markings 6. Installation and replacement of some water lines 7. Performance of additional and incidental work as called for by specifications and plans. Page 1 of 5 Conformed to Bid Documents 3. Construction Schedule 00140: A. We will require a "B" type schedule for this project B. We will require a Three Week Look Ahead prepared weekly to be presented at weekly meeting. 4. Public Works Contacts: A. Streets: Joel Kuhnke (503-880-9001) Plan on having a Commercial Street Sweeper on call to use especially with respect to driving on ground pavements prior to AC paving. B. Water: Craig Smith (503-534-5735) Rental Hydrant meter from Rosa G. (503.635.0280). City to install services and boxes. C. Storm: Tyler Townsend (503-807-9925) 5. Erosion Control Section 00280. Jamie Roberts (503-697-6511) A. Contain materials from the project to prevent entry into waterway. B. Permit is required to be applied for: htts://ci.oswego.or/formslf/ErosionControlApp Preliminary Erosion Control Inspection. Schedule a preliminary inspection with the City's Erosion Control Coordinator before on-site work starts. Final Erosion Control Inspection. Following Project Completion, remove erosion control items from right-of-way. Schedule the final erosion control inspection once all onsite work is complete. 6. Survey Requirements Section 00305. A. Tom Workman, P.L.S. (503-635-0276) Protect all survey monuments per ORS 209.150. After construction, a registered land surveyor shall reset all disturbed or destroyed survey monuments per ORS 209.155. B. The consultant will provide the necessary survey for this project, namely for the ADA corners. C. A pre-survey, pre-concrete, pre-ADA meeting will be held for the ADA portion of this project to include Gen contractor, concrete subcontractor and surveyor. D. Survey staking will be required for curb ramp construction. The Consultant shall develop and make all detail surveys necessary for layout and construction. Complete all survey staking as needed using information contained in the plans and adjusted as necessary to meet ADA requirements. Surveyed field layout shall be reviewed by the Engineer prior to demolition and again prior to concrete placement. Page 2 of 5 Conformed to Bid Documents 7. As-Built Record Drawings. Clean paper copy or "Red Lines" to review and electronic copy later with station and offsets as necessary. 8. Traffic Control Plan Section 00240. Vlad Hubenya, (503-534-5229), CIP Coordinator: Submit Traffic Control Plan for Review to: https://apps.lakeoswego.city/Forms/TTCPApplication Email Traffic Questions to: traffic@lakeoswego.city *Pay particular attention to section 00220.40 General Requirements, Lane Restrictions, Closed lanes - Allowable work hours and lane closures are as follows: Work on ADA 7am-6pm if working in dedicated turn lane or thru lane closure, check with Project Manager for specifics. • Kruse Oaks Drive & Bangy Road (Bonita Road to Burma Road): o Single lane closure (in either direction) allowed Monday through Friday 9:00am to 3:00pm and Saturday 7:00am to 6:00pm. Day work activities allowed for all other work except mainline grinding and paving, as allowed. Single lane closure (in either direction) allowed Monday through Friday 8:00pm to 5:00am and Saturday 8:00pm to 7:00am. • Bangy Road (Kruse Way to Bonita Road): o Single lane closure (in either direction) allowed Monday through Friday 9:00am to 3:00pm and Saturday 7:00am to 6:00pm. Day work activities allowed for all other work except mainline grinding and paving, as allowed. Single lane closure (in either direction) allowed Monday through Friday 8:00pm to 5:00am and Saturday 8:00pm to 7:00am. Traffic may be shifted into median to allow closure of two side-by-side lanes. When shifting lanes into the existing median, provide a flagger at each end of the lane shift. Night work required for mainline grinding and paving activities. Flaggers are required at signalized intersections when a Temporary Pedestrian Diversion Plan is implemented to direct pedestrians through the work area and to activate the pedestrian signal as necessary. • Kruse Way Kruse at West Lake—close WB Kruse for ADA work: o Single lane closure (in either direction) allowed Monday through Friday 9:00am to 3:00pm and Saturday 7:00am to 6:00pm. Day work activities allowed for all other work except mainline grinding and paving, as allowed. Single lane closure (in either direction) allowed Monday through Friday 8:00pm to 5:00am and Saturday 8:00pm to 7:00am. Night work required for mainline grinding and paving activities. Flaggers are required at signalized intersections when a Temporary Pedestrian Diversion Plan is implemented to Page 3 of 5 Conformed to Bid Documents direct pedestrians through the work area and to activate the pedestrian signal as necessary. • Hallmark Drive, Collins Way, & Douglas Way: o Full closure of roadway is allowed. When road closure is in effect, only two of the 3 three streets may be closed at one time and not Douglas Way/Collins Way at the same time. Hallmark Drive stage closure around 15455 Hallmark Drive driveway to maintain access. • Limited Duration Road Closure Add the following to this section: Kruse Oaks Drive and Hallmark Drive shall not be fully opened to traffic until top lift paving has occurred. Kruse Way (westbound right lane only) at Westlake Drive is allowed to be closed for 10 calendar working days. Hallmark Drive from Collins Way to Mercantile Drive is allowed to be closed for the duration of waterline installation. Hallmark Drive, Collins Way, and Douglas are allowed to be closed. Local access must be maintained for 15455 Hallmark Drive. Only two of these three streets may be closed simultaneously. • Typical on-site work hours are 7:00 am to 6:00 pm each workday or as approved, Night work as authorized by City Engineer. • Treat school buses like emergency vehicles. • Contractor will have to produce a Temporary Pedestrian Route Plan for ADA corners. "TPAR" • Roads that have School Impacts - 9am to 3pm • The following special events will occur during this Project: • Events - Add the following to the end of this subsection. • Sunday Market: Sundays on Hallmark Drive beginning August 2nd, 2026 • Concerts in the Park (Westlake Park): Wednesday Evenings in August 9. Tree Protection Section 00320. There are a couple of tree removals and pruning, the city will handle getting the appropriate permits for the project. 10. Waterline Work Section 01100: Hallmark will require a new waterline; there will be coordinate with PW's department: Craig Smith 11. Pavement grinding Section 00620: Grinding at variable depths will be coordinated by LO Engineer. Be prepared to maintain roadway under traffic. 12. AC Paving: plan on using Level 3 %" ACP on all work and follow section 00744. There will be an Asphalt Pre-Paving conference prior to AC paving. A asphalt pickup machine or MTV will not be required for this project. Page 4 of 5 Conformed to Bid Documents 13. Portland Cement Concrete Structures—Sidewalks, Curb & Gutter and ADA work will be governed by Section 00759 for this project. This work will be supervised by L0 Engineer and Project Inspector during all activities to ensure that work does not need to be redone. 14. Pavement Markings Section 00850: all pavement markings will by Thermoplastic, type D, B-HS with some "Profiled" and some "Non-Profiled" 15. Signals and Pedestrian Systems-Section 00900 & 00960: these activities and Radar set up will be coordinated with Clackamas County. The city will store and supply and store the new "Radar Equipment." Five intersections will be converted to Radar, Carman will be % radar N/S and loops E/W. DESCRI RI ON: QTY NOTES iNS-Universal APS, 9x15 R10-3E Reflective Countdown Sign, No Braille, No Cust.Voice 36 iNS23TNO-B IN3S Ped Head Control Unit(replaces iPHCU3W) 36 IPHCU3S 25'interconnect Cable for IN3 push buttons 36 IN3-Cable-25 Wavetronix Advance 200-E Extended Range SmartSensor 9 WX-SS-200-E Wavetronix Matrix Stop Bar SmartSensor 18 WX-SS-225 Click 656-6 Sensor Cabinet interface with SDLC output 5 WX-102-0451 19"3U Mounting Shelf and Hardware Kit for Click 656 5 WX-102-0462 80 foot 6 Conductor Matrix/200V Cable w/Connector 27 WX-SS-704-080 Matrix Type 2 Home Run Cable 1 pr#18,2 triads#22 7000 ATP-Matrix 2 Mini 710-Sensor Cable Junction Box w/terminal blocks 27 102-0453(Mini-710) Sensor Mount-6"2 Axis Aluminum Bracket 27 WX-SS-611 SmartSensor Advance View Finder Aiming Tool 1 WX-360-0283 5'SDLC Cable-2070(25 pin screw)to Click 650(15 pin Spring clip) 5 WS-SDLC-2070-650 Page 5 of 5 Conformed to Bid Documents ADDENDUM NO. 2 TO THE REQUEST FOR PROPOSALS TO PROVIDE CONSTRUCTION SERVICES FOR WORK ORDER 378 2026 PAVEMENT REHABILITATION PROJECT FOR CITY OF LAKE OSWEGO LAKE OSWEGO, OREGON THIS ADDENDUM IS HEREBY MADE A PART OF THE REQUEST FOR PROPOSALS DOCUMENTS TO THE SAME EXTENT AS THOUGH IT WERE ORIGINALLY INCLUDED THEREIN. ISSUED THIS 17th DAY OF APRIL 2026. (IA„.11/4F4s cEGO1 CITY OF LAKE OSWEGO 380 A AVENUE PO BOX 369 LAKE OSWEGO, OREGON 97034 Work Order No. 378 Page 1 of 2 Addendum No. 2 Conformed to Bid Documents 1. The project includes four (4) trees to be removed by the Contractor; three (3) for WO 378 and one (1) for WO 347. The bid table for WO 378 does not include an item for clearing and grubbing. Please include all costs to remove these four (4) trees in bid item number 6— Clearing and Grubbing in the WO 347 Bid Schedule. The four (4) trees to be removed by the Contractor are located at: • WO 347—Sheet 13 —Country Club Road &Verte Court • WO 378—Sheet C14— Hallmark Drive. Revise Note 19 that calls for this tree to be protected to instead call for it to be removed. • WO 378—Sheet C09— Kruse Way and Carman Drive. Two (2) trees are called for removal behind the proposed curb ramps on the NE corner. Replace note 53 pointing to these two trees with note 58. End Work Order No. 378 Page 2 of 2 Addendum No. 2