Loading...
HomeMy WebLinkAboutAgenda - 2026-10-07 PM ______________________________________________________________________________________________ Foothills Technical Advisory Committee Meeting #4 – Agenda Page 1 of 3 Foothills Technical Advisory Committee Meeting #4 – Technical Coordination Update & Next Steps Oct 7, 2026, from 1:00 pm – 2:00pm I Hosted via Zoom PUBLIC VIEWING & COMMENTS Members of the public can use the following URL link to register in advance to view the meeting: https://us06web.zoom.us/webinar/register/WN_dW142QE4TEuEU_8Ogq9OAA Members of the public who wish to send comments regarding issues being addressed by the Lake Oswego Foothills District Technical Advisory Committee (“Foothills TAC”) are requested to email their comments to csiquina@ci.oswego.or.us, with “Foothills TAC” in the subject line. MEETING PURPOSE Summarize how engagement and summer technical coordination informed refinement of the preliminary development concepts, introduce the Key Moves that will define the forthcoming Schematic Plan, and prepare for more detailed focus meetings that will test feasibility and identify the requirements, processes, and potential adjustments needed to carry the Key Moves into the Preferred Plan. AGENDA 1. Welcome and Meeting Purpose — 5 minutes Review the meeting purpose, distributed materials, and intended outcomes 2. Summer Technical Coordination and Early Findings — 15 minutes Summarize the principal findings from summer technical coordination. 3. Key Moves Defining the Schematic Plan — 10 minutes Introduce the Key Moves that emerged from refinement of the preliminary concepts through community engagement, policy direction, and technical coordination. 4. Upcoming Analysis and Coordination— 10 minutes Review the proposed topics, general sequencing, anticipated participants, and intended outcomes. 5. Focused Technical Meetings Discussion— 15 minutes Review the Focus Meeting Matrix and gather TAC input on meeting topics, participants, work products, sequencing, and coordination needs. 6. Next Steps — 5 minutes Summarize TAC input, identify additional focused technical meetings immediate actions, and confirm how focused-meeting findings will be documented and reported to the full TAC ______________________________________________________________________________________________ Foothills Technical Advisory Committee Meeting #4 – Agenda Page 2 of 3 FOOTHILLS FOCUS MEETINGS MATRIX The summary Focus Meetings matrix identifies the technical questions, participants, expected work products, and sequencing for focused review needed to refine the Schematic Plan and support development of the Preferred Plan. Sequence and Focus Meeting Primary Review Topics and Participants Expected Technical Findings and Coordination 1 PGE Substation and Electrical Infrastructure Substation relocation feasibility; conflict with the Grand Connection and Foothills Road realignment; overhead-line effects on the B Avenue bridge; property and easement needs; WWTP electrical- service requirements; and relocation responsibilities, process, information, and timing. Participants PGE; City Public Works and Engineering; WWTP project team; APEX; FFF Document affected facilities and evaluate whether relocation or consolidation appears technically feasible; and identify the process, responsibilities, and requirements needed to evaluate and potentially advance relocation. Dependencies and coordination Begin early. Findings potentially affect the Grand Connection, Foothills Road, B Avenue bridge, WWTP coordination, and development parcels. 2A State Street and North Portal State Street restriping and added parking; A Avenue recommendations; TIA findings; ODOT access requirements; preferred North Portal between D and E Avenues; Terwilliger Alternative; intersection operations; and implementation triggers. Participants ODOT; City Transportation and Public Works; APEX; FFF Evaluate the recommended State Street and North Portal concepts and document the operational and regulatory considerations for pedestrian and traffic calming enhancements. Identify required traffic analysis, design criteria, approval processes, and needed refinements. Dependencies and coordination Use current TIA findings. Coordinate with street-network review and property, access, and grade analysis for the preferred North Portal between D and E Avenues and the Terwilliger Alternative. 2B Railroad Crossings and Trolley Interface B Avenue Primary Crossing Concept; A Avenue Optional Supplemental Connection; trolley- maintenance driveway and barn access; rail clearance; accessible grades and landings; rail and trolley operations; depot and boarding-area interface; emergency access; construction phasing; and PGE- line conflicts. Participants City; rail owner or operator; Willamette Shore Trolley representatives; ODOT as applicable; PGE; APEX; FFF Evaluate the feasibility of the B Avenue Primary Crossing Concept and A Avenue Optional Supplemental Connection. Document agency and operator requirements, information needs, review processes, and necessary technical refinements. Dependencies and coordination Coordinate with PGE findings, State Street crossings, the future Anchor project, Lake-to-Riverfront Trail, Curlicue Trail, trolley-maintenance access, and adjacent property redevelopment. 3 Street Network and Municipal Operations Grand Connection; Foothills Road realignment; South Portal; preferred North Portal between D and E Avenues; Terwilliger Alternative; street sections; utilities; loading; solid waste; and maintenance. Review WWTP service, delivery, controlled access, large-vehicle turning, and emergency-access requirements. Review fire-apparatus access, secondary emergency access, fire lanes, aerial access, plaza and festival-street closures, and emergency access during phased development. Participants City Public Works, Transportation, Engineering, Fire, and Planning; WWTP project team; APEX; FFF Document municipal, WWTP-access requirements. Identify refinements to street alignments. Dependencies and coordination Build from PGE, ODOT, and crossing coordination. Identify requirements and considerations for subsequent grading, utility, property, and development-parcel refinement. ______________________________________________________________________________________________ Foothills Technical Advisory Committee Meeting #4 – Agenda Page 3 of 3 Foothills Focus Meeting Matrix continued. Sequence and Focus Meeting Primary Review Topics and Participants Expected Technical Findings and Coordination 4 Parks, Trails, and Natural Resources Lake-to-Riverfront Trail; Plaza Park; River Greenway; Curlique Trail; North Portal trail; Tryon Creek bridge and northern trails; habitat; park operations and programming; parking and ownership and maintenance; event servicing; and emergency access during normal operations and special events. Participants Parks and Recreation; Natural Resources; Tryon Creek Watershed Council; Metro or regional partners as appropriate; Public Works; Fire as needed; FFF Review the proposed trail alignments and intended park functions. Document environmental, ownership, operational, maintenance, emergency- access, and permitting considerations and needed refinements. Dependencies and coordination Coordinate with crossing and street alignments. Findings inform floodplain, habitat, emergency-access, property, and phasing review. 5 Floodplain, Grading, and Infrastructure Phasing Floodplain considerations and compensatory measures; finished-floor elevations; street and utility grades; stormwater; Plaza Park and riverfront impacts; continuity of WWTP access and operations; and sequencing of the new WWTP, demolition of the existing facility, public improvements, and private redevelopment. Participants City Public Works and Engineering; APEX; floodplain and civil specialists; Planning; Parks; WWTP project team; FFF Identify the technical basis for a planning-level grading, floodplain, utility, stormwater, and infrastructure-phasing strategy, including the sequence needed to maintain WWTP operations and emergency access. Dependencies and coordination Use the refined street, trail, park, and WWTP framework. Findings may require changes to development parcels, capacity, access, property needs, and improvement sequencing. 6 Development Capacity, Housing, and Urban Renewal Development yield and building scale; parking; affordable housing allocation; market feasibility; property strategy; property acquisition and easements; interface with WWTP noise, odor, and service operations; infrastructure costs; tax-increment revenue; public and private responsibilities; development triggers; and development and public- improvement phasing. Participants Planning; Economic Development; Housing; Urban Renewal; Finance; market or economic consultant; WWTP project team as needed; FFF Test the planning-level development scenario and housing assumptions. Dependencies and coordination Use access, infrastructure, floodplain, property, operational, and cost findings. Reevaluate development capacity, public-improvement responsibilities, revenue, and phasing as technical assumptions change. Property and implementation coordination- Each focus meeting will identify associated property acquisitions, easements, and consider public and private responsibilities, sequencing requirements, preliminary cost responsibilities, potential funding considerations, and implementation triggers. The project team will consolidate these findings after the technical concepts have been evaluated and may review them through a follow-up implementation workshop.