Loading...
HomeMy WebLinkAboutAgenda Item - 2002-04-16 - Number 9.1.3 - 9. 1 .3 04/16/02 CITY OF LAKE OSWEGO AGENDA REPORT SUMMARY MEETING DATE: April 16, 2002 SUBJECT: Resolution of the City Council of the City of Lake Oswego Authorizing the Mayor to Sign an Intergovernmental Agreement between the City of Lake Oswego (City) and Clean Water Services (CWS) for the Tualatin Basin Floodplain Restudy. RECOMMENDED MOTION: Move to adopt Resolution 02-22 authorizing the Mayor to sign an Intergovernmental Agreement between the City of Lake Oswego (City) and Clean Water Services (CWS) for the Tualatin Basin Floodplain Restudy. EST. FISCAL ATTACHMENTS: NOTICED (Date): IMPACT: • Komarek Council Report $29,600 dated April 10, 2002. STAFF COST: • Resolution 02-22 Ordinance no.: BUDGETED: Resolution no.: 02-22 Y X N Previous Council FUNDING SOURCE: consideration: No Surface Water Management Fund Y ENGINEER COMM. DEV. DIRECTOR CITY MA GER /o /C /( 02 Date Date Date 4'� H\JOEL_K\Council\Feina_remap_agenda_checklist doc 46 LAKE Os„,,C O ,, CITY OF LAKE OSWEGO mio COUNCIL REPORT OREGON TO: Douglas J. Schmitz, City Manager FROM: Joel Komarek,P.E., City Engineer SUBJECT: Intergovernmental Agreement for the Tualatin Basin Floodplain Restudy. DATE: April 10, 2002 Action Staff requests the City Council to adopt Resolution 02-22 authorizing the Mayor to sign an Intergovernmental Agreement between the City of Lake Oswego (City) and Clean Water Services (CWS) for the Tualatin River Basin floodplain analysis and floodway mapping update. Introduction Two important and parallel efforts are currently underway related to floodplains located within the City's Urban Services Boundary. These efforts are: ➢ FEMA/CWS Floodplain Analysis and Remapping-In May 2000, FEMA and CWS jointly agreed to manage and fund an analysis and remapping effort of the floodplain for the Tualatin River Basin. Last year, Congress appropriated$32 million dollars to initiate FEMA's Flood Map Modernization plan, which FEMA estimates will cost more than$100 million per year for the next 7 years. With the recent appropriation of federal funds, FEMA and CWS received $390,000 to undertake the joint remapping effort. During the 1996 flood event, many properties located along the Oswego Lake canal and surrounding the topographic depression along Sycamore Avenue north of Childs Road(Rivergrove Gap) suffered flood related damage. At the City's request, CWS and FEMA agreed to include the Rivergrove Gap and the entire length of the Oswego Lake main canal within the project study area. The IGA between the City and CWS will establish Lake Oswego's share of participatory costs, expand the study area to include areas of interest to City, establish the study period and prescribe project deliverables ➢ Floodplain Standards Amendments-Title 3 of the Metro Urban Growth Management Functional Plan, sets minimum performance standards for local governments related to the protection of property located within federally designated Special Flood Hazard Areas(SFHA). To ensure consistency with Title 3,the City of Lake Oswego's Planning Commission is currently considering amendments to the City's floodplain standards. The proposed amendments, if adopted, will modify the City's current floodplain development standards,which were codified in 1987 shortly after FEMA completed its first Flood Insurance Study(FIS) in 1986. 49 Council Report Page 2 of 4 Background In 1986,FEMA concluded a decade long study to investigate the existence and severity of flood hazards in communities nationwide, including the City of Lake Oswego. The study results were used to develop Flood Insurance Rate Maps (FIRM) that delineated Special Flood Hazard Areas (SFHA). Properties located within a SFHA, are eligible to purchase federally subsidized flood insurance at or below actuarial rates. Lenders require such insurance when financing properties located in a SFHA. Real estate located within a SFHA is subject to minimum floodplain management requirements for communities participating in the National Flood Insurance Program(NFIP). Portions of most properties that border Oswego Lake, West Bay, Lakewood Bay, Oswego Canal,Blue Heron Canal, the Tualatin and Willamette Rivers are located within the SFHA. Recent amendments to Statewide Planning Goal 7 require local governments to participate in the NFIP. As a Participating Community, the City's current floodplain standards reflect the federal regulations set forth in the Code of Federal Regulations—Title 44. Discussion The two projects described in the introduction section of this report share commonalities of purpose, yet each is distinct in its respective scope of work. Commonalities include: ✓ Each share a common"driver"; that being the flood event of 1996. ✓ Each acknowledges that existing FIRM's do not account for new development patterns, zoning and additional impervious area added to the basin since 1986. ✓ Each acknowledges that base flood elevations shown on the FIRM's do not reflect flood elevations observed and recorded during the 1996 flood event. ✓ Each seeks as an end product, a set of updated, digital floodplain maps that reflect current jurisdictional boundaries, the floodway elevation datum relative to the '96 flood and accurate topographic features. While the two projects currently underway share some common objectives, their respective goals exhibit some differences. These differences include: FEMA/CWS Restudy: V The purpose of the Oswego Canal and Rivergrove Gap floodplain-mapping project is to complete the engineering and surveying necessary to create a FIS submittal package for review by FEMA. The updated FIS could be used by FEMA to generate updated FIRM's for the Tualatin River Basin including the Oswego Canal and Rivergrove Gap. ✓ The FIS submittal package to FEMA would be science based and adhere to strict study specifications enforced by FEMA. ✓ The maps produced from the study effort will be the property of FEMA, who will distribute and regulate their use. Floodplain Standards—Amendment Process: ✓ The purpose of the Floodplain Standards amendment process is to define a Flood Management Area (FMA)that is subject to an amended Flood Management Area Ordinance. The City's existing ordinance would be amended to be consistent with Statewide Planning Goal 7,Metro's Title 3 requirements and CFR Title 44. 5 di Council Report Page 3 of 4 ✓ In contrast to the FEMA/CWS restudy, the FMA and related standards are being developed in a collaborative public process involving citizen and agency stakeholders. No rigorous scientific or hydraulic analysis is contained within the scope of work to develop the FMA. The FMA process simply overlays the 1987 FEMA maps with the base flood boundary observed and recorded during the 1996 flood. Impact of Respective Study Efforts Benefits for each effort include: ✓ Development of new digital maps with current topography,jurisdictional boundary's and flood a elevation datum relative to the 1996 flood. ✓ Accurate flood maps can help reduce the risk to citizens and property by providing the necessary tools to help cities make informed decisions about development. ✓ Floodplain maps assist local officials in determining where to locate critical facilities, evacuation routes and natural resource management. ✓ LOC 50.44.035 requires a registered professional engineer or surveyor to submit a survey documenting the 100-year flood boundary as part of the pre-application process for development proposed within the floodplain. New, accurate maps may allow some property owners to avoid the expense of a survey. ✓ New, accurate maps will confirm the need for certain property owners to purchase or maintain flood insurance. It may also indicate that certain owners do not need flood insurance. ✓ This FEMA/CWS study and the associated maps will be valuable tools that are used on a daily basis to provide guidance for community development and important decision-making information to staff, current and potential homeowners,realtors, insurance companies, and developers. V Land use decisions based upon the 1987 FIRM's may increase the risk of exposure to legal action as a result of post decision flood related property damage. Decisions based upon the use of more accurate maps may reduce this risk. Potential Liabilities for each effort include: ✓ The FEMA/CWS remapping effort will likely confirm that new, upstream development since 1986 has translated into an increase in the base flood elevation along the Tualatin River and Oswego Canal. The increased flood elevations may mean more properties are subject to floodplain regulations. ✓ Absent removal of existing non-conforming structures located within the floodplain,FEMA may deny coverage to those properties or alternatively, increase flood insurance rates. Conclusion The FEMA/CWS remapping effort for the Tualatin River Basin is currently underway and will continue with or without the inclusion of the Oswego Canal and Rivergrove Gap in the study area. The similarities/differences and benefits/liabilities of each of the City's floodplain related projects have been noted above. These efforts appear consistent with the current administration's goal of facilitating mapping modernization efforts between local governments and FEMA and the National League of Cities position in support of pre-disaster mitigation. H VOEL_K\Council\Fema_remap_COUNCRPT doc 5 ti Council Report Page 4 of 4 Recommendation Based upon the foregoing,it is staff's recommendation that the City Council support modernization of floodplain maps and authorize the Mayor to sign an Intergovernmental Agreement between the City of Lake Oswego (City) and Clean Water Services (CWS) for the Tualatin Basin Floodplain Restudy. Alternatives 1.) Adopt Resolution 02-22 authorizing the Mayor to sign an Intergovernmental Agreement between the City of Lake Oswego (City) and Clean Water Services (CWS) for the Tualatin Basin Floodplain Restudy. 2.) Do not adopt Resolution 02-22 authorizing the Mayor to sign an Intergovernmental Agreement between the City of Lake Oswego (City) and Clean Water Services (CWS) for the Tualatin Basin Floodplain Restudy. Glossary of Terms Base flood elevation: -The base flood elevation(or 100-year flood) is the flood surface water elevation from a flood event, which has a 1%chance of being equaled or exceeded in any given year. Floodplain: -The elevation reached by floodwaters. In this community the term may be applied either to base flood elevations as mapped by FEMA,or 1996 flood elevations, which are generally regarded as considerably above the 100-year base flood elevation. Floodway: -The portion of the floodplain where floodwaters move fastest and where risks to life or property are the greatest. The floodway is the channel of a stream plus any adjacent floodplain areas that must be kept free of encroachment so that the 1% annual chance flood can be carried without substantial increase in flood elevations. Special Flood Hazard Area: -The area subject to flooding by the 1% annual chance flood. 5 H\JOEL_K\CounclITema_remap_COUNCRI I doc RESOLUTION 02-22 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LAKE OSWEGO AUTHORIZING THE MAYOR TO SIGN AN INTERGOVERNMENTAL AGREEMENT BETWEEN CLEAN WATER SERVICES (CWS) AND THE CITY OF LAKE OSWEGO (CITY)FOR THE TUALATIN BASIN FLOODPLAIN RESTUDY. WHEREAS, the parties hereto have the authority to enter into this Agreement pursuant to their respective principal acts and ORS 190.003 et seq.; and WHEREAS; the City is a participating Community in the National Flood Insurance Program (NFIP); and WHEREAS; the City is responsible for flood management in the Tualatin River system within its jurisdiction; and WHEREAS; many of the properties under City jurisdiction, located in the Dogwood/Sycamore Road(s) area and properties abutting the Oswego Canal are situated within the Federal Emergency Management Agency (FEMA) designated floodplain; and WHEREAS; many of said properties experienced flooding in February of 1996; and WHEREAS; CWS is registered as a Cooperating Technical Partner(CTP) with FEMA for the purpose of remodeling and remapping the floodway and floodplain of selected Tualatin Basin streams and sections of the Tualatin River; and WHEREAS; CWS has entered into Memorandum of Agreement with FEMA to complete hydrologic and hydraulic analysis and floodplain mapping for the Tualatin River and major tributary streams; and WHEREAS; the results of this remapping effort will benefit the City in assessing community safety as it relates to potential future flooding events; and WHEREAS, the parties desire to enter into this Agreement, in the interest of furthering economy and efficiency of local government and agree to reimburse CWS's payments for services performed on behalf of the parties; 53 NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Lake Oswego authorizes the Mayor to sign the attached Intergovernmental Agreement, confirming its intent to join efforts with Clean Water Services for the Tualatin Basin Floodplain Restudy Considered and enacted by the City Council of the City of Lake Oswego at a regular meeting held on the day of April 2002. AYES: NOES: ABSTAIN: EXCUSED: Judie Hammerstad, Mayor ATTEST: Robyn Christie, City Recorder APPROVED AS TO FORM: j4 , / 1 r; -'c,{ ,ti%} i Y City Attorney Attachment: • Intergovernmental Agreement Attachments are available for review in the City Recorder's Office. Resolution 02-22 Page 2 of 2 5 4